Permit Application Status

PRRES20210387


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20210387
Building Permit - Residential
Certificate of Occupancy
NLV PERGOLA PARK LLC
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT
01/27/2021
02/18/2021
08/03/2021
12/02/2021
Locations
Contacts
NLV PERGOLA PARK LLC, Address:3152 SW GRANDSTAND CIR  
BELLAH HOMES LLC, Address:P O BOX 346, Phone:(816) 697-2870  
TROY@BELLAHHOMES.COM  
A & D HEATING AND COOLING INC, Address:2006 W MAIN ST, Phone:(816) 537-7952  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
TRI-COUNTY PLUMBING LLC, Address:PO BOX 234, Phone:(816) 720-3222  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 02/19/2021 02/17/2021
Brandon Kalwei
Basement opening elevations
Corrective Action Required
02/17/2021

Minimum Building Opening Elevation (MBOE) and location on structure must be provided on the plot plan. PER THE APPROVED MDP, PLEASE REVISE THE FRONT AND BACK MBOE'S AS THEY DO NOT MATCH. REAR PORTION OF THE HOUSE IS BELOW THE MBOE.
As-graded plot plan
Corrective Action Required
02/17/2021

A as-graded plot plan per Section 7-160, Code of Ordinances, is required prior to occupancy.
City infrustructure
Corrective Action Required
02/17/2021

Show all manholes, water valve boxes, fire hydrants, and stormwater structures. MISSING SANITARY STUB AND STORM INFRUSTRUCTURE.
Residential Plan Review Approved 02/19/2021 02/17/2021
Brandon Kalwei
Planning Review (RES) Approved 02/03/2021 02/04/2021
Jennifer Thompson
Plot Plan Review Rejected 02/03/2021 02/04/2021
Dylan Eppert
Basement opening elevations
Corrective Action Required
02/04/2021

Minimum Building Opening Elevation (MBOE) and location on structure must be provided on the plot plan. PER THE APPROVED MDP, PLEASE REVISE THE FRONT AND BACK MBOE'S AS THEY DO NOT MATCH. REAR PORTION OF THE HOUSE IS BELOW THE MBOE.
As-graded plot plan
Corrective Action Required
02/04/2021

A as-graded plot plan per Section 7-160, Code of Ordinances, is required prior to occupancy.
City infrustructure
Corrective Action Required
02/04/2021

Show all manholes, water valve boxes, fire hydrants, and stormwater structures. MISSING SANITARY STUB AND STORM INFRUSTRUCTURE.
Residential Plan Review Approved 02/03/2021 02/03/2021
Dylan Eppert
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $1,097.82 $1,097.82 Paid 02/18/2021
$0.00
8331507-Sewer Connection Fee $420.00 $420.00 Paid 02/18/2021
Water Tap Fee $3,581.00 $3,581.00 Paid 02/18/2021
Water Meter Fee $455.54 $455.54 Paid 02/18/2021
Right of Way Permit Fee $80.00 $80.00 Paid 02/18/2021
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 02/03/2021
$1,077.12
New Longview Road and Bridge Escrow $1,077.12 $1,077.12 Paid 02/18/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 3/29/2021 03/29/2021
Underslab Plumbing Inspection - Residential Failed 4/20/2021 4/20/2021 04/20/2021
Misc
Corrective Action Required
04/20/2021
No access, backfill foundation and reschedule inspection
Underslab Plumbing Inspection - Residential Passed 4/21/2021 04/21/2021
Misc
Resolved
04/21/2021
No access, backfill foundation and reschedule inspection
Sewer Service Inspection - R Passed 5/5/2021 (3:00) 5/5/2021 05/05/2021
Water Service Inspection - R Passed 5/7/2021 (10:30) 5/7/2021 05/07/2021
Electrical Service Inspection Passed 7/20/2021 7/20/2021 07/20/2021
Gas Service Inspection - Residential Passed 7/20/2021 7/20/2021 07/20/2021
Erosion Control Inspection Residential Failed 7/20/2021 07/20/2021
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
07/20/2021
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. - MAINTAIN SILT FENCE - - MAINTAIN GRAVEL FILTER - - MAINTAIN WEEDS - - REMOVE SEDIMENT BUILD UP AT GUTTER BUDDY -
All Rough Inspection - Residential Failed 7/20/2021 7/20/2021 07/20/2021
Miscellaneous Correction
Corrective Action Required
07/20/2021
Block & nail sheathing great room / front stoop Nailing sheathing garage to house wall per plan Provide anchor bolts within 12" of plate break garage Panel splice edges shall occur over and be nailed to common blocking within middle 24" of wall mid height. One row of 3" OC nailing is required in each panel edge PFG portal framing garage Fasten top plate to header with two rows of 16D sinkers at 3" OC Garage portal frame Provide 5 studs under LVL per plan master / kitchen Fire block chase master closet / stairway Solid block & nail sheathing breaks bed #4 Fire block corn jug er bed #3 Provide anchor bolts SCH 40 columns Provide (3) & (5) studs under stairs in basement per plan Provide 2 studs under flush 2x10 lower stairs
All Rough Inspection - Residential Failed 7/22/2021 7/22/2021 07/22/2021
Miscellaneous Correction
Corrective Action Required
07/20/2021
-Nail exterior sheathing great room -Panel splice edges shall occur over and be nailed to common blocking within middle 24" of wall mid height. One row of 3" OC nailing is required in each panel edge PFG portal framing garage Fasten top plate to header with two rows of 16D sinkers at 3" OC Garage portal frame
All Rough Inspection - Residential Failed 7/29/2021 7/29/2021 07/29/2021
Miscellaneous Correction
Corrective Action Required
07/22/2021
-Nail exterior sheathing great room -Panel splice edges shall occur over and be nailed to common blocking within middle 24" of wall mid height. One row of 3" OC nailing is required in each panel edge PFG portal framing garage Fasten top plate to header with two rows of 16D sinkers at 3" OC Garage portal frame , Sheertocked, lap siding on exterior and trim on garage doors with tyvek.
All Rough Inspection - Residential Passed 7/29/2021 07/29/2021
Miscellaneous Correction
Resolved
07/29/2021
-Nail exterior sheathing great room -Panel splice edges shall occur over and be nailed to common blocking within middle 24" of wall mid height. One row of 3" OC nailing is required in each panel edge PFG portal framing garage Fasten top plate to header with two rows of 16D sinkers at 3" OC Garage portal frame , Sheertocked, lap siding on exterior and trim on garage doors with tyvek.
Sidewalk Inspection Partial 11/10/2021 11/10/2021 11/10/2021
Misc
Informational
11/10/2021
Sidewalk was formed up with aggregate in place and compacted. Meets LS and ADA spec. 11/10 ES
Sidewalk Inspection Passed 11/19/2021 11/19/2021 11/19/2021
Misc
Informational
11/10/2021
Sidewalk was formed up with aggregate in place and compacted. Meets LS and ADA spec. 11/10 ES
Misc
Informational
11/19/2021
Sidewalk meets LS and Ada specs. 11/19 ES
Occupancy Inspection - Codes Residential Failed 11/29/2021 11/29/2021 11/29/2021
Miscellaneous Correction
Corrective Action Required
11/29/2021
- obtain irrigation permit and submit a back flow certification - Final grading and sod - Place splash blocks - seal top of meter can - Sump discharge 36” away from foundation - Secondary lock on sliding door - In garage, non-GFCI outlet & GFCI outlet are reversed
Erosion Control Inspection Residential Passed 12/02/2021
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
07/20/2021
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. - MAINTAIN SILT FENCE - - MAINTAIN GRAVEL FILTER - - MAINTAIN WEEDS - - REMOVE SEDIMENT BUILD UP AT GUTTER BUDDY -
Plot Plan Inspection Passed 12/02/2021
Occupancy Inspection - Codes Residential Full C of O 12/2/2021 12/2/2021 12/02/2021
Miscellaneous Correction
Corrective Action Required
11/29/2021
- obtain irrigation permit and submit a back flow certification
Documents & Images
Date Uploaded File Type Document Name
01/27/2021 Application Form Lot 83 Permit & Tax Application
02/01/2021 Lot83PlotPlan
02/01/2021 BHPPergolaNorthhamptonLot83Sealed
02/03/2021 Approved Plans APPROVE HOUSE PLANS
02/04/2021 Letter Codes Residential Plan Review
02/17/2021 Plot Plan Approved Plot Plan
02/18/2021 Receipt Receipt for transaction: 2021-000778
03/28/2021 M L Crose 3208 SW Mary St LSMO Bellah Permit 2021-0387 3rd Party Footing Inspection Report 3-26-21
03/29/2021 Letter INSPECTION SUMMARY
03/29/2021 Letter DS Building Permit
04/20/2021 Letter INSPECTION SUMMARY
04/21/2021 Letter INSPECTION SUMMARY
05/05/2021 Letter INSPECTION SUMMARY
05/07/2021 Letter INSPECTION SUMMARY
07/20/2021 Letter INSPECTION SUMMARY
07/20/2021 Letter INSPECTION SUMMARY
07/20/2021 Letter INSPECTION SUMMARY
07/20/2021 Letter INSPECTION SUMMARY
07/22/2021 Letter INSPECTION SUMMARY
07/29/2021 Letter INSPECTION SUMMARY
07/29/2021 Letter INSPECTION SUMMARY
11/10/2021 Letter INSPECTION SUMMARY
11/19/2021 Letter INSPECTION SUMMARY
11/29/2021 Letter INSPECTION SUMMARY
12/02/2021 Letter Codes Final Certificate of Occupancy
12/02/2021 Letter Field Certificate of Occupancy
12/13/2021 Letter INSPECTION SUMMARY
12/13/2021 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home