Permit Application Status

PRRES20204989


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20204989
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT - COVERED DECK
12/31/2020
01/07/2021
07/03/2021
12/17/2021
Locations
Contacts
JFE CONSTRUCTION INC, Address:1314 SW MARKET ST, Phone:(816) 470-0074  
MIKE BRYANT HEATING & COOLING , Address:1711 E 123RD , Phone:(913) 441-7807  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
A BRIGHT PLUMBING LLC, Address:18107 E 18TH TER N, Phone:(816) 215-0730  
CORY@JFECONSTRUCTION.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 01/11/2021 01/07/2021
Kim Brennan
Deck location
Corrective Action Required
01/07/2021

Deck location, with dimensions to property lines must be provided on the plot plan.
Misc
Corrective Action Required
01/07/2021

Please add the dimensions of the retaining wall from the bottom of the footing to the top of the wall
City infrustructure
Corrective Action Required
01/07/2021

Show all manholes, water valve boxes, fire hydrants, and stormwater structures.
Residential Plan Review Approved 01/11/2021 01/07/2021
Kim Brennan
Residential Plan Review Approved 01/06/2021 01/05/2021
Kim Brennan
05 Provide square footage of living area, garage area, unfinished basement
Corrective Action Required
01/04/2021

Provide square footage of living area, garage area, unfinished basement area, etc (IRC Section R304) Please provide the square footage for the covered deck
Plot Plan Review Rejected 01/06/2021 01/04/2021
Kim Brennan
Deck location
Corrective Action Required
01/04/2021

Deck location, with dimensions to property lines must be provided on the plot plan.
Misc
Corrective Action Required
01/04/2021

Please add the dimensions of the retaining wall from the bottom of the footing to the top of the wall
City infrustructure
Corrective Action Required
01/04/2021

Show all manholes, water valve boxes, fire hydrants, and stormwater structures.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $1,524.20 $1,524.20 Paid 01/07/2021
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 01/07/2021
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 01/07/2021
8331507-Sewer Connection Fee $690.00 $690.00 Paid 01/07/2021
8331401-Water Tap Fee $3,581.00 $3,581.00 Paid 01/07/2021
8350015-Water Meter Fee $455.54 $455.54 Paid 01/07/2021
Outstanding Fees Amount Paid Owing Date Paid
9110080-Not Ready Inspection Fee $50.00 $0.00 $50.00 Not Paid


$50.00    Add Fees to My Cart
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Residential Failed 2/26/2021 2/26/2021 02/26/2021
Misc
Corrective Action Required
02/26/2021
Inspection denied. No record of approved footing inspection. Provide third party inspection report within two business days
Underslab Plumbing Inspection - Residential Passed 02/26/2021
Misc
Resolved
02/26/2021
Inspection denied. No record of approved footing inspection. Provide third party inspection report within two business days
Footing Inspection - Residential Passed 02/26/2021
Erosion Control Inspection Residential Failed 02/26/2021
Misc
Corrective Action Required
02/26/2021
-Erosion control requires continuous maintenance. Repair damaged sections within 48 hours -immediate street cleanup required -no further inspections until issues are resolved
Sewer Service Inspection - R Passed 3/3/2021 (8:00) 3/3/2021 03/03/2021
Water Service Inspection - R Passed 3/4/2021 (1:00) 3/4/2021 03/04/2021
All Rough Inspection - Residential Failed 4/28/2021 4/28/2021 04/28/2021
Misc
Corrective Action Required
04/28/2021
Continue 3”oc fastening at top and bottom plates per detail
Erosion Control Inspection Residential Failed 04/28/2021
Misc
Corrective Action Required
02/26/2021
-Erosion control requires continuous maintenance. Repair damaged sections within 48 hours -immediate street cleanup required -no further inspections until issues are resolved
All Rough Inspection - Residential Partial 4/29/2021 4/29/2021 04/29/2021
Misc
Informational
04/29/2021
Portal approved
Erosion Control Inspection Residential Failed 05/18/2021
Misc
Corrective Action Required
04/28/2021
-Erosion control requires continuous maintenance. Repair damaged sections within 48 hours -immediate street cleanup required -remove debris from stormwater inlet -no further inspections until issues are resolved
All Rough Inspection - Residential Failed 6/25/2021 6/25/2021 06/25/2021
Misc
Corrective Action Required
06/25/2021
Portal approved -Address deficient Erosion Control methods front and rear of property, also remove debris from city street and stormwater inlet. No further inspections until these issues are resolved -Tighten anchor bolts in basement and garage -Minimum 12” field 6” edge exterior sheathing fastening, Also block and fasten exterior sheathing splices - Address first floor supporting W10X68 steel beam end bearing, beam does not have full bearing and will require engineered documentation for repair -Minimum of two anchor bolts per plate, right of basement walkout -Provide anchor bolt at plate splices, garage (2) -Double top plate spices to offset minimum 24 inches, Garage -Provide engineered documentation regarding field repairs of rafter end bearing on blocks and address where no field repairs were made -Provide end Support of Ridge above garage, Also provide collar ties at this location -12” oc fastening, stud to stud and abutting studs at intersecting braced walls. Locations marked -Provide minimum 16g galvanized metal ties 1.5” wide at over bored top plates of interior load bearing walls. Fasten ties across and to the plate at each side of the opening with minimum 4-10dx1.5” at each side of straps. The metal tie must extend a minimum of 6” past the opening. See figure R602.6.1 locations marked -Provide end Support of hip Rafter above office -Complete plumbing installation, second story bath -Fireblock Plate Penetration and cut OSB fireblock into attic space at chime -Plan calls for three LVL’s above dining, two installed -Seal penetrations in Joist cavity used as return air Plenum, pex above kitchen -Nail plate protection at conductor stud penetration, master bed -Braced wall method CS-PF per detail, master bed -Strap non-continuous studs at gable wall, master closet -Missing Rafter above master closet -Address Rafter to Ridge connection above master closet -Collar ties at Ridge above bedroom two -Structural Strap at over bored top Plate Penetration, exterior wall bathroom between bed three and four. Strap Required interior side only -Fireblock Bottom Plate Penetration bedroom four DWV -Through bolts at deck post/beam connections -Identify white insulated conductors to be used as current carrying conductors at both points of termination -Water heater vent termination. Gas vents that are over 12 inches in size OR are located less than 8 feet from a vertical wall or similar obstruction shall terminate not less than 2 feet above the highest point where they pass through the roof and not less than 2 feet above any portion of the building within 10 feet horizontally. See G2427.6.4 #2 clearance to second story Exterior wall
Electrical Service Inspection Passed 6/25/2021 6/25/2021 06/25/2021
Gas Service Inspection - Residential Passed 6/25/2021 6/25/2021 06/25/2021
All Rough Inspection - Residential Failed 7/7/2021 7/7/2021 07/07/2021
Misc
Corrective Action Required
06/25/2021
-Through bolts at deck post/beam connections -Water heater vent termination. Gas vents that are over 12 inches in size OR are located less than 8 feet from a vertical wall or similar obstruction shall terminate not less than 2 feet above the highest point where they pass through the roof and not less than 2 feet above any portion of the building within 10 feet horizontally. See G2427.6.4 #2 clearance to second story Exterior wall
All Rough Inspection - Residential Failed 7/12/2021 7/12/2021 07/12/2021
Misc
Corrective Action Required
07/07/2021
-Through bolts at deck post/beam connections -Water heater vent termination. Gas vents that are over 12 inches in size OR are located less than 8 feet from a vertical wall or similar obstruction shall terminate not less than 2 feet above the highest point where they pass through the roof and not less than 2 feet above any portion of the building within 10 feet horizontally. See G2427.6.4 #2 clearance to second story Exterior wall
Misc
Corrective Action Required
07/12/2021
Now fire stop the old penetrations floor and ceiling. Fur out the new location of the flue and Firestop. And reschedule
All Rough Inspection - Residential Passed 7/14/2021 7/14/2021 07/14/2021
Misc
Resolved
07/14/2021
Misc
Resolved
07/14/2021
Driveway Inspection Partial 10/5/2021 10/5/2021 10/05/2021
Misc
Informational
10/05/2021
Forms are in place and aggregate is present and compacted. No sidewalk
Driveway Inspection Passed 10/8/2021 10/8/2021 10/08/2021
Misc
Informational
10/05/2021
Forms are in place and aggregate is present and compacted. No sidewalk
Misc
Informational
10/08/2021
Driveway looks good and has expansion on the curb and 11ft right of way
Plot Plan Inspection Passed 11/3/2021 11/03/2021
Occupancy Inspection - Codes Residential Not Ready 11/30/2021 11/30/2021 11/30/2021
Miscellaneous Correction
Corrective Action Required
11/30/2021
- final grading and sod - Lock and secondary lock for sliding door - Outlet dead east island - Missing outlet/open box in cabinet near refrigerator - Missing fixtures over stairs open box - Open box stairs to basement - Non GFCI in basement needs labeled - Provide security screws in basement door - Missing floor registers first floor
Occupancy Inspection - Codes Residential Temporary C of O 12/8/2021 12/8/2021 12/08/2021
Miscellaneous Correction
Corrective Action Required
12/08/2021
- obtain irrigation permit and submit back flow certification -pay fees
Occupancy Inspection - Codes Residential Failed 12/13/2021 12/13/2021 12/13/2021
Miscellaneous Correction
Corrective Action Required
12/08/2021
submit back flow certification -pay fees
Occupancy Inspection - Codes Residential Full C of O 12/17/2021 12/17/2021 12/17/2021
Miscellaneous Correction
Resolved
12/17/2021
Documents & Images
Date Uploaded File Type Document Name
12/31/2020 Application Form Permit Application
12/31/2020 Application Form License Tax Form
01/04/2021 Letter Codes Residential Plan Review
01/05/2021 Approved Plans Approved Drawings
01/07/2021 Plot Plan Approved Plot Plan
01/07/2021 Receipt Receipt for transaction:2021-000095
01/07/2021 Letter DS Building Permit
02/26/2021 Letter INSPECTION SUMMARY
02/26/2021 Wilmoth 3026 NW Thoroeau Pl LSMO Lot 1476 Winterset P 2020-4989 Footing Inspection Report 2-3-21
02/26/2021 Letter INSPECTION SUMMARY
02/26/2021 Letter INSPECTION SUMMARY
02/26/2021 Letter INSPECTION SUMMARY
03/03/2021 Letter INSPECTION SUMMARY
03/04/2021 Letter INSPECTION SUMMARY
04/28/2021 Letter INSPECTION SUMMARY
04/28/2021 Letter INSPECTION SUMMARY
04/29/2021 Letter INSPECTION SUMMARY
05/18/2021 Letter INSPECTION SUMMARY
06/25/2021 Letter INSPECTION SUMMARY
06/25/2021 Letter INSPECTION SUMMARY
06/25/2021 Letter INSPECTION SUMMARY
07/12/2021 Letter INSPECTION SUMMARY
07/12/2021 Letter INSPECTION SUMMARY
07/14/2021 Letter INSPECTION SUMMARY
10/05/2021 Letter INSPECTION SUMMARY
10/08/2021 Letter INSPECTION SUMMARY
11/01/2021 Plot Plan Approved As Graded Plot Plan
11/03/2021 Letter INSPECTION SUMMARY
11/30/2021 Letter INSPECTION SUMMARY
12/08/2021 Letter Codes Temporary Certificate of Occupancy
12/13/2021 Letter INSPECTION SUMMARY
12/17/2021 Letter Codes Final Certificate of Occupancy
12/17/2021 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home