Summary
PRRES20204749
Building Permit - Residential
Certificate of Occupancy
CMH PARKS INC
NEW SINGLE FAMILY
NEW HOUSE - ROOF TRUSS PACKAGE - UNFINISHED BASEMENT - COVERED DECK
12/14/2020
12/21/2020
06/14/2021
09/01/2021
Locations
Contacts
CMH PARKS INC, Address:5000 CLAYTON RD  
CLAYTON PROPERTIES GROUP, INC, Address:10450 Holmes Rd Suite 100, Phone:(816) 246-6700  
PERMITTING@SUMMITHOMESKC.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 12/23/2020 12/21/2020
Dylan Eppert
Drainage swales
Corrective Action Required
12/21/2020

Drainage swales (where required); show spot elevations within the swale as required to conform to the approved master drainage plan (if applicable), must be provide
As-graded plot plan
Corrective Action Required
12/21/2020

A as-graded plot plan per Section 7-160, Code of Ordinances, is required prior to occupancy.
Drainage swales/berms
Corrective Action Required
12/21/2020

Drainage swales/berms: provide cross-section elevations as required to conform to the accepted "As graded" Master Drainge Plan (MDP), include cross-section detail from MDP.
Residential Plan Review Approved 12/23/2020 12/21/2020
Dylan Eppert
Plot Plan Review Rejected 12/16/2020 12/16/2020
Dylan Eppert
Drainage swales
Corrective Action Required
12/16/2020

Drainage swales (where required); show spot elevations within the swale as required to conform to the approved master drainage plan (if applicable), must be provide
As-graded plot plan
Corrective Action Required
12/16/2020

A as-graded plot plan per Section 7-160, Code of Ordinances, is required prior to occupancy.
Drainage swales/berms
Corrective Action Required
12/16/2020

Drainage swales/berms: provide cross-section elevations as required to conform to the accepted "As graded" Master Drainge Plan (MDP), include cross-section detail from MDP.
Residential Plan Review Approved 12/16/2020 12/16/2020
Dylan Eppert
Planning Review (RES) Approved 12/16/2020 12/14/2020
Jennifer Thompson
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $1,279.40 $1,279.40 Paid 12/21/2020
8331507-Sewer Connection Fee $570.00 $570.00 Paid 12/21/2020
Water Tap Fee $3,581.00 $3,581.00 Paid 12/21/2020
Water Meter Fee $455.54 $455.54 Paid 12/21/2020
Right of Way Permit Fee $80.00 $80.00 Paid 12/21/2020
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 12/21/2020
3rd and Subsequent Inspection Fee (Per Hour) $50.00 $50.00 Paid 08/31/2021
Not Ready Inspection Fee $50.00 $50.00 Paid 08/31/2021
3rd and Subsequent Inspection Fee (Per Hour) $50.00 $50.00 Paid 08/31/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 1/19/2021 01/19/2021
Underslab Plumbing Inspection - Residential Failed 2/4/2021 2/4/2021 02/04/2021
Misc
Corrective Action Required
02/04/2021
-SET INTERIOR DRAIN TILE - IF SETTING DRAIN TILE HORIZONTAL ACROSS FLOOR MUST GO DIAGONAL FROM SUMP PIT AND REACH OPPOSITE FOUNDATION WALL
Underslab Plumbing Inspection - Residential Passed 2/8/2021 2/8/2021 02/08/2021
Misc
Resolved
02/08/2021
Sewer Service Inspection - R Passed 4/1/2021 (9:45) 4/1/2021 04/01/2021
Water Service Inspection - R Passed 4/2/2021 (9:00) 4/2/2021 04/02/2021
All Rough Inspection - Residential Failed 4/23/2021 4/23/2021 04/23/2021
Misc
Corrective Action Required
04/23/2021
-Fireblock HVAC/DWV chase at garage -stud pack at lvl on garage wall cut short with stud not bearing on bottom plate, repl or use an approved shim -install jack straps at garage PFH -Secure all vertical DWV 2” or less at mid point -Bocca protection plate at DWV bottom plate master water closet -Fireblock gap between dbl wall top plate at master shower -Support DWV every 48” oc, traps not considered support -nail all ceiling joist hangers master bed -Joist hanger at master bed entry vault ceiling over 4’ -Fireblock wall between fireplace on 1st floor and open attic space above master bed that will not be rocked, see approved materials R302.11.1 -12”oc nailing at all abutting and intersecting wall corners -Address sgl joist overborded for DWV, above front office 1st floor, same joist also has (2) pex bores less than 2” apart -Address sgl joist bored for pex less than 2” apart , 1st floor between foyer and office wall -fir out chase for DWV, 1st floor office closet -Exterior bracing CS-PF at dining room windows per plans -Exterior wall bracing design per plans at great room windows -Jack studs cut short at dining room windows, add jack stud at kind stud west side of header -Attic access per plans -Fireblock 2nd floor HVAC chase at hall -Truss strap H2.5 hold down missing bed#3, bath#2, 2nd floor -Properly fireblock deadspace at 2nd floor bed#2, use approved materials as listed R302.11.1 -Nail truss hangers 2nd floor -Truss hangers per plans, 2nd floor -All truss lateral bracing per plans -Floor joist over notched for DWV tub trap, East side basement -joist hangers required on joist to header connection above furnace in basement, over 4’, nail header joist hangers -Address Over-notched floor joist for DWV, south basement wall at garage wall -Sump pump discharge bored through (3) 2x6 stud pack at beam bearing end support, beam support compromised -(3) 2x6 stud pack at W8x10 beam ends per plans, north side basement -W8x24 steel beams west side basement to bear on (5) 2x6 stud pack per plans -deck ledger attachment per code -through bolts at all post/beam connections per code -bolt outer ply of beam to ledger and add angel clip to inner ply -Nail exterior sheathing per plans, 6” edge, 12” field **Deck not complete at time of rough in inspection**
All Rough Inspection - Residential Failed 4/28/2021 4/28/2021 04/28/2021
Misc
Corrective Action Required
04/23/2021
Fireblock HVAC/DWV chase at garage -stud pack at lvl on garage wall cut short with stud not bearing on bottom plate, repl or use an approved shim -install jack straps at garage PFH -nail both straps -Secure all vertical DWV 2” or less at mid point -Bocca protection plate at DWV bottom plate master water closet -Fireblock gap between dbl wall top plate at master shower -Support DWV every 48” oc, traps not considered support -Fireblock wall between fireplace on 1st floor and open attic space above master bed that will not be rocked, see approved materials R302.11.1-seal perimeter gaps at fireblock -Address sgl joist overborded for DWV, above front office 1st floor, same joist also has (2) pex bores less than 2” apart, submit engineer report -Address sgl joist bored for pex less than 2” apart , 1st floor between foyer and office wall, submit engineer report -Exterior bracing CS-PF at dining room windows per plans -Exterior wall bracing design per plans at great room windows -Truss strap H2.5 hold down missing bed#3, 2nd floor -Nail truss hangers 2nd floor , see top of 2nd floor landing -All truss lateral bracing per plans -Floor joist over notched for DWV tub trap, East side basement -Address Over-notched floor joist for DWV, south basement wall at garage wall -(3) 2x6 stud pack at W8x10 beam ends per plans, north side basement -through bolts at all post/beam connections per code -bolt outer ply of beam to ledger and add angel clip to inner ply -Nail exterior sheathing per plans, 6” edge, 12” field **Deck not complete at time of rough in inspection**
All Rough Inspection - Residential Failed 4/30/2021 4/30/2021 04/30/2021
Misc
Corrective Action Required
04/28/2021
-Nail all holes in jack straps at garage PFH-
All Rough Inspection - Residential Not Ready 5/3/2021 5/3/2021 05/03/2021
Misc
Corrective Action Required
04/30/2021
-Nail all holes in jack straps at garage PFH-
All Rough Inspection - Residential Passed 5/4/2021 5/4/2021 05/04/2021
Misc
Resolved
05/04/2021
Gas Service Inspection - Residential Passed 5/5/2021 5/5/2021 05/05/2021
Electrical Service Inspection Passed 5/5/2021 5/5/2021 05/05/2021
Driveway Inspection Passed 5/25/2021 05/26/2021
Misc
Informational
05/26/2021
A city driveway inspection was performed and passed on Tuesday, late afternoon on 5-25-2021
Sidewalk Inspection Passed 5/25/2021 05/26/2021
Misc
Informational
05/26/2021
On Tuesday late afternoon, a sidewalk inspection was performed that passed city inspections.
Occupancy Inspection - Codes Residential Failed 7/23/2021 7/23/2021 07/23/2021
Misc
Corrective Action Required
07/23/2021
-Resolve outstanding inspection fees -Submit as graded plot plan for review and approval -Final grade and sod -splash blocks at all downspout and sump pump discharge locations, min 36" distance from foundation -Guardrail required at front porch, more than 30" from grade -uncover water meter lid -Install cooktop -Pex requires 6” clearance from flue vent at hot water heater -Install breaker lockout for hardwired cooktop
Plot Plan Inspection Passed 9/1/2021 09/01/2021
Erosion Control Inspection Residential Passed 09/01/2021
Occupancy Inspection - Codes Residential Full C of O 9/1/2021 9/1/2021 09/01/2021
Misc
Resolved
09/01/2021
Documents & Images
Date Uploaded File Type Document Name
12/14/2020 Plans HT #32 - PERMIT APPLICATION
12/14/2020 HT #32 - TRUSS LAYOUT
12/14/2020 HT #32 - Valentia - Mediterranean - Sheets- signed
12/14/2020 LOT 32 FINAL
12/14/2020 HT 32
12/16/2020 Specifications APPROVED TRUSS PACKAGE
12/16/2020 Drawing APPROVED ROOF TRUSS LAYOUT
12/16/2020 Plans APPROVED HOUSE PLAN
12/16/2020 Letter Codes Residential Plan Review
12/21/2020 Plot Plan APPROVED PLOT PLAN
12/21/2020 Receipt Receipt for transaction:2020-008142
12/21/2020 Letter DS Building Permit
01/04/2021 32 Hawthorne Ride Subgrade
01/15/2021 Lot 32 Hawthorne Ridge Footing inspection
01/19/2021 Letter INSPECTION SUMMARY
01/27/2021 Lot 32 Hawthorne Ridge Wall inspection
02/04/2021 Letter INSPECTION SUMMARY
02/08/2021 Letter INSPECTION SUMMARY
04/01/2021 Letter INSPECTION SUMMARY
04/02/2021 Letter INSPECTION SUMMARY
04/23/2021 Letter INSPECTION SUMMARY
04/28/2021 Letter INSPECTION SUMMARY
04/29/2021 32 Hawthorne Ridge Holes in Floor Joists Letter (002)
04/30/2021 Letter INSPECTION SUMMARY
05/03/2021 Letter INSPECTION SUMMARY
05/04/2021 Letter INSPECTION SUMMARY
05/05/2021 Letter INSPECTION SUMMARY
05/05/2021 Letter INSPECTION SUMMARY
05/26/2021 Letter INSPECTION SUMMARY
05/26/2021 Letter INSPECTION SUMMARY
07/23/2021 Letter INSPECTION SUMMARY
08/31/2021 Receipt Receipt for transaction:2021-006991
08/31/2021 Plot Plan approved as graded plot plan
09/01/2021 Letter INSPECTION SUMMARY
09/01/2021 Letter INSPECTION SUMMARY
09/01/2021 Letter Field Certificate of Occupancy
09/01/2021 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home