Permit Application Status

PRRES20204525


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20204525
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - ROOF TRUSSES - UNFINISHED BASEMENT - COVERED PATIO ADDED BASEMENT FINISH Brandon Kalwei 05/18/2021 1:50 PM
12/01/2020
12/18/2020
08/09/2021
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
PERMITTING@SUMMITHOMESKC.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 12/03/2020 12/17/2020
Brandon Kalwei
Residential Plan Review Approved 12/03/2020 12/01/2020
Brandon Kalwei
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $965.24 $965.24 Paid 12/18/2020
8331507-Sewer Connection Fee $360.00 $360.00 Paid 12/18/2020
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 12/18/2020
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 12/18/2020
8331401-Water Tap Fee $3,581.00 $3,581.00 Paid 12/18/2020
8350015-Water Meter Fee $455.54 $455.54 Paid 12/18/2020
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 05/18/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 05/18/2021
9110080-3rd and Subsequent Inspection Fee (Per Hour) $50.00 $50.00 Paid 05/18/2021
9110078-Additional Permit Fee $50.00 $50.00 Paid 05/18/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 1/11/2021 (2:00) 1/11/2021 01/11/2021
Misc
Informational
01/11/2021
- UFER SW REAR FOUNDATION WALL GARAGE -
Underslab Plumbing Inspection - Residential Not Ready 1/26/2021 1/26/2021 01/26/2021
Misc
Corrective Action Required
01/26/2021
- PROVIDE ADDRESS - - NO UNDERSLAB PLUMBING ONLY DRAIN TILE -
Erosion Control Inspection Residential Failed 2/1/2021 02/01/2021
DCM6 ESC INSP DENIED STREET CLEAN UP
Corrective Action Required
02/01/2021
- STREET CLEAN UP REQUIRED IMMEDIATEY - - PROVIDE ADDRESS - - MAINTAIN SILT FENCE - - MAINTAIN GRAVEL FILTER -
Underslab Plumbing Inspection - Residential Passed 2/1/2021 2/1/2021 02/01/2021
Misc
Corrective Action Required
01/26/2021
- PROVIDE ADDRESS -
Piers/Caissons Inspection - Residential Passed 2/26/2021 (1:00) 2/26/2021 02/26/2021
Misc
Informational
02/26/2021
(2) 24 X 36 W/ (4) #4 VERT BARS PER PLAN
Erosion Control Inspection Residential Failed 3/9/2021 03/09/2021
DCM6 ESC INSP DENIED STREET CLEAN UP
Corrective Action Required
02/01/2021
- STREET CLEAN UP REQUIRED IMMEDIATEY - - PROVIDE ADDRESS - - MAINTAIN SILT FENCE - - MAINTAIN GRAVEL FILTER -
DCM6 ESC INSP DENIED STREET CLEAN UP
Corrective Action Required
03/09/2021
REQUESTED INSPECTION(S) DENIED. STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTED INSPECTION(S) BEING PERFORMED. - MAINTAIN SILT FENCE - - MAINTAIN GRAVEL FILTER -
Sewer Service Inspection - R Passed 3/9/2021 (1:00) 3/9/2021 03/09/2021
Water Service Inspection - R Passed 3/11/2021 (9:00) 3/11/2021 03/11/2021
All Rough Inspection - Residential Failed 4/1/2021 4/2/2021 04/02/2021
Misc
Corrective Action Required
04/02/2021
-Flash above front window -PFH requires double bottom plate with exterior sheathing fastened 3”oc -fasten exterior sheathing at top plates 3”oc, portal opening -Address drilled portal opening LVL header -Anchor bolt required within 12 inches of plate splice, garage & basement -Grounding electrode conductor connection to concrete encased electrode is required to remain accessible -Address areas of inadequate fireblock -Fireblock vertical to horizontal, garage/dwelling separation wall at radon piping -Provide nail plate protection at bottom plate Penetration, radon piping -Fireblock vertical to horizontal at clothes dryer exhaust duct and left side of same cantilevered wall -Maintain minimum required air space at attic insulation shield -Top plates places to offset minimum 24 inches -Unable to verify truss hold downs at girder bearing points in garage -12” oc fastening, stud to stud and abutting studs at intersecting braced walls -Provide minimum 16g galvanized metal ties 1.5” wide at over bored top plates of interior load bearing walls. Fasten ties across and to the plate at each side of the opening with minimum 4-10dx1.5” at each side. The metal tie must extend a minimum of 6” past the opening. Both sides of top plate -Unable to verify truss hold down device in master bath, truss spans from garage/dwelling separation wall to exterior wall at bathroom -Unable to verify truss hold down device in master bedroom, -Repair vapor barrier and provide snow block, master bath -Protect NM conductors from physical damage minimum 6” AFF at floor penetrations -fireblock through floor penetrations with approved material, inadequate under tub -fireblock vertical to horizontal, wall between stairs and bath -address framing & sheathing attachment, bed 3/covered porch wall, Ensure all braced wall panels are fastened per plan -Repair/replace solid blocking over beam removed by other trades -Provide solid blocking at floor cantilever -Pressure test gas piping minimum 10 psi for 15 minutes -Provide engineer report regarding cracked foundation wall in east corner -Provide proper support of HVAC supply duct in basement -Seal all joints in ductwork -Provide lateral support per approved truss documentation -Stud packs per plan at girder truss bearing points, see roof plan -Double joist under interior non-loadbearing walls Per plan framing notes -Return air from bathroom/closet space is prohibited
Electrical Service Inspection Passed 04/02/2021
Gas Service Inspection - Residential Failed 04/02/2021
Misc
Corrective Action Required
04/02/2021
Pressure test gas piping minimum 10 psi for 15 minutes
All Rough Inspection - Residential Failed 4/7/2021 4/7/2021 04/07/2021
Misc
Corrective Action Required
04/02/2021
-PFH requires double bottom plate with exterior sheathing fastened 3”oc. Provide continuous plates that are anchored per plans -fasten exterior sheathing at top plates 3”oc, portal opening -Provide engineered report regarding drilled portal opening LVL header -Anchor bolt required within 12 inches of plate splices, basement -Address areas of inadequate fireblock, garage/dwelling separation wall, gaps between wood fireblock and studs at garage dropped ceiling level third car bay -Fireblock vertical to horizontal, garage/dwelling separation wall at radon piping garage ceiling level -Fireblock vertical to horizontal at clothes dryer exhaust duct and conductor penetrations of wood fireblock -Maintain minimum required air space at attic insulation shield -Unable to verify truss hold downs at girder bearing points in garage -12” oc fastening, stud to stud and abutting studs at intersecting braced walls, bed 3 -Provide minimum 16g galvanized metal ties 1.5” wide at over bored top plates of interior load bearing walls. Fasten ties across and to the plate at each side of the opening with minimum 4-10dx1.5” at each side. The metal tie must extend a minimum of 6” past the opening. Both sides of top plate -Unable to verify truss hold down device in master bath/closet, truss spans from garage/dwelling separation wall to exterior wall at bathroom/closet corner, truss D08 -fireblock through floor penetrations with approved material, inadequate under tub. Filling this large penetration of the subfloor with foam is unacceptable -fireblock vertical to horizontal, wall between stairs and bath. DWV penetration of wood fire block at bathroom ceiling level, gaps between studs and wood fire block at bathroom ceiling level, -Repair/replace solid blocking over beams removed by other trades -Provide engineered report regarding cracked foundation wall in east corner -Provide lateral support per approved truss documentation -Stud packs per plan at girder truss bearing points, see roof plan notes and floor plan for all GT bearing locations -Double floor joist under interior non-loadbearing walls Per plan framing notes -Return air from bathroom/closet space is prohibited, remove return transom above closet/bathroom door
Gas Service Inspection - Residential Passed 4/7/2021 4/7/2021 04/07/2021
Misc
Resolved
04/07/2021
Pressure test gas piping minimum 10 psi for 15 minutes
All Rough Inspection - Residential Not Ready 4/8/2021 4/8/2021 04/08/2021
Misc
Corrective Action Required
04/07/2021
-fasten exterior sheathing at top plates 3”oc, portal opening -Provide engineered report regarding drilled portal opening LVL header -Anchor bolt required within 12 inches of plate splices, basement -Address areas of inadequate fireblock, garage/dwelling separation wall, gaps between wood fireblock and studs at garage dropped ceiling level third car bay -Fireblock vertical to horizontal, garage/dwelling separation wall at radon piping garage ceiling level -Fireblock vertical to horizontal at clothes dryer exhaust duct and conductor penetrations of wood fireblock -Maintain minimum required air space at attic insulation shield -fireblock through floor penetrations, inadequate under tub. -fireblock vertical to horizontal, wall between stairs and bath. DWV penetration of wood fire block at bathroom ceiling level, gaps between studs and wood fire block at bathroom ceiling level, -Provide engineered report regarding cracked foundation wall in east corner -Double floor joist under interior non-loadbearing walls Per plan framing notes WORK DONE SINCE LAST INSPECTION -Provide exterior receptacle for HVAC service -attach removed interior braced wall strap -Mechanically fastened spliced equipment grounding conductors and secure conductors, master bedroom
All Rough Inspection - Residential Passed 4/13/2021 4/13/2021 04/13/2021
Misc
Resolved
04/13/2021
Driveway Inspection Failed 5/25/2021 5/25/2021 05/25/2021
Misc
Corrective Action Required
05/25/2021
Forms were placed and aggregate was present and compacted, but there is standing water that needs to be removed before pouring. RP 5-25-21
Driveway Inspection Failed 6/4/2021 6/4/2021 06/04/2021
Misc
Corrective Action Required
05/25/2021
Forms were placed and aggregate was present and compacted, but there is standing water that needs to be removed before pouring. RP 5-25-21
Misc
Corrective Action Required
06/04/2021
Approach was never poured. Please call in a new inspection. RP 6-4-21
Sidewalk Inspection Partial 6/14/2021 6/14/2021 06/14/2021
Misc
Informational
06/14/2021
6/14/21 15:15- Crew had 4in of rock, carried 2% or less and sidewalk was 5ft off the curb.
Sidewalk Inspection Passed 6/18/2021 6/18/2021 06/18/2021
Misc
Informational
06/14/2021
6/14/21 15:15- Crew had 4in of rock, carried 2% or less and sidewalk was 5ft off the curb.
Misc
Informational
06/18/2021
6/18/20 8:50- Sidewalk is installed and carried the correct % of slope.
Driveway Inspection Passed 06/18/2021
Misc
Corrective Action Required
06/04/2021
Forms were placed and aggregate was present and compacted, but there is standing water that needs to be removed before pouring. RP 5-25-21
Misc
Corrective Action Required
06/04/2021
Approach was never poured. Please call in a new inspection. RP 6-4-21
Misc
Informational
06/18/2021
6/18/21 8:50- Driveway was inspected and poured 6/14/21 pre-pour had everything corrected and they received the ok to pour. Driveway was poured and looks good and is carrying the correct %
All Rough Inspection - Residential Failed 6/24/2021 6/24/2021 06/24/2021
Misc
Corrective Action Required
06/24/2021
**Basement finish: -Provide bocca plate for dwv at bottom plate in bath
All Rough Inspection - Residential Passed 6/24/2021 6/24/2021 06/24/2021
Misc
Resolved
06/24/2021
**Basement finish: -Provide bocca plate for dwv at bottom plate in bath
Sidewalk Inspection Failed 7/7/2021 7/7/2021 07/07/2021
Misc
Informational
07/07/2021
Forms were placed and aggregate was present and compacted. RP 7-7-21
Misc
Corrective Action Required
07/07/2021
White cure not applied after finishing. Needs to remove and replace sidewalk. RP 7-7-21
Sidewalk Inspection Passed 7/16/2021 7/16/2021 07/16/2021
Misc
Informational
07/07/2021
Forms were placed and aggregate was present and compacted. RP 7-7-21
Misc
Informational
07/16/2021
Finished sidewalk meets LS and ADA specs. RP 7-16-21
Plot Plan Inspection Passed 7/28/2021 07/28/2021
Occupancy Inspection - Codes Residential Temporary C of O 7/28/2021 7/28/2021 07/28/2021
Miscellaneous Correction
Corrective Action Required
07/28/2021
RAISE MANHOLE COVER TO GRADE PROVIDE 6" CLEARANCE WOOD SIDING TO GRADE
Occupancy Inspection - Codes Residential Full C of O 8/9/2021 8/9/2021 08/09/2021
Miscellaneous Correction
Resolved
08/09/2021
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home