Permit Application Status

PRRES20203779


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20203779
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - FINISHED BASEMENT - COVERED PATIO
10/16/2020
11/02/2020
04/24/2021
09/12/2022
Locations
Contacts
IQ CONSTRUCTION, Address:P O BOX 6423, Phone:(816) 582-8100  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
SAFEHOUSE ELECTRIC COMPANY, Address:P O BOX 1833, Phone:(816) 935-8113  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
BSHELTON@IQHOMEBUILDERS.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 10/28/2020 10/26/2020
Kim Brennan
Residential Plan Review Approved 10/28/2020 10/26/2020
Kim Brennan
10 Combustion air
Corrective Action Required
10/26/2020

Provide combustion air calculations and specify transfer air grilles for fuel burning appliances located in confined space(s). (IRC Chapter 17 and Section G2407)
Residential Plan Review Rejected 10/21/2020 10/26/2020
Dylan Eppert
10 Combustion air
Corrective Action Required
10/19/2020

Provide combustion air calculations and specify transfer air grilles for fuel burning appliances located in confined space(s). (IRC Chapter 17 and Section G2407)
Plot Plan Review Approved 10/21/2020 10/26/2020
Kim Brennan
Basement elevation
Corrective Action Required
10/19/2020

The Basement floor elevation and basement type (e.g. full/standard, daylight, walk-out, etc.)
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $959.22 $959.22 Paid 11/02/2020
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 11/02/2020
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 11/02/2020
8331507-Sewer Connection Fee $390.00 $390.00 Paid 11/02/2020
8331401-Water Tap Fee $3,581.00 $3,581.00 Paid 11/02/2020
8350015-Water Meter Fee $455.54 $455.54 Paid 11/02/2020
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 07/09/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 07/09/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 07/09/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 07/09/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Residential Failed 11/24/2020
Misc
Corrective Action Required
11/24/2020
-Erosion control requires continuous maintenance. Repair damaged section at rear and establish methods at curb line within 2 businesses days -immediate street cleanup required -establish gravel filter at driveway -provide building address -no further inspections until complete
Footing Inspection - Residential Passed 11/24/2020 (9:30) 11/24/2020 11/24/2020
Sewer Service Inspection - R Passed 1/12/2021 (1:15) 1/12/2021 01/12/2021
Water Service Inspection - R Partial 01/13/2021
Misc
Informational
01/13/2021
Only partial approval at the time of installation due to meter box lid is currently below grade. Will revisit the issue at final to ensure meter box lid is accessible at grade and meter is 14-18” below lid
Erosion Control Inspection Residential Failed 01/28/2021
Misc
Corrective Action Required
11/24/2020
-Erosion control requires continuous maintenance. Repair damaged sections within 2 businesses days -establish gravel filter -immediate street cleanup required -no further inspections until complete
Underslab Plumbing Inspection - Residential Passed 1/28/2021 1/28/2021 01/28/2021
Erosion Control Inspection Residential Failed 02/03/2021
Misc
Partial Correction
02/03/2021
-Provide and maintain gravel filter -immediate street cleanup required
All Rough Inspection - Residential Failed 3/10/2021 3/10/2021 03/10/2021
Misc
Corrective Action Required
03/10/2021
Portal frame -install interior tension straps -tighten anchor bolts
All Rough Inspection - Residential Partial 3/19/2021 3/19/2021 03/19/2021
Misc
Informational
03/19/2021
Portal frame approved
Piers/Caissons Inspection - Residential Passed 3/29/2021 (9:00) 3/29/2021 03/29/2021
Electrical Service Inspection Failed 4/6/2021 4/6/2021 04/06/2021
Misc
Corrective Action Required
04/06/2021
-Color code/label GEC at service panel
Gas Service Inspection - Residential Passed 4/6/2021 4/6/2021 04/06/2021
All Rough Inspection - Residential Failed 4/6/2021 4/6/2021 04/06/2021
Misc
Corrective Action Required
04/06/2021
-Anchor steel column to floor in garage -Anchor bolts within 12” of plate break in garage and family room -Joist hanger at tail joist to header at attic access in garage, over 4’ -Address floor joist cut for DWV at HVAC/DWV box out in garage -2x4 laid flat at furred down in garage, connect to floor joist above to support the ceiling load -Nail all joist hangers at garage entry/family room -Nail protection plates at all NM (romex) within 1 1/4” end of stud, several locations throughout -Secure ward flex gas line at fireplace -security blocking at deck door -Collar ties at rafters garage -Seal all penetrations through air returns -Ensure UFER ground remains accessible at finish -Color code/label GEC at service panel -Unable to inspect roof framing at covered deck due to siding lid cover -Receptacle required within 25’ and on same level of exterior HVAC equipment *Deck incomplete at time of rough in inspection*
All Rough Inspection - Residential Failed 4/9/2021 4/9/2021 04/09/2021
Misc
Corrective Action Required
04/09/2021
Seal Penetrations at return air Plenums
Electrical Service Inspection Passed 4/12/2021 4/12/2021 04/12/2021
Misc
Resolved
04/12/2021
-Color code/label GEC at service panel
All Rough Inspection - Residential Passed 4/12/2021 4/12/2021 04/12/2021
Misc
Resolved
04/12/2021
Seal Penetrations at return air Plenums
Driveway Inspection Passed 7/6/2021 7/6/2021 07/06/2021
Occupancy Inspection - Codes Residential Not Ready 7/6/2021 7/6/2021 07/06/2021
Erosion Control Inspection Residential Failed 07/06/2021
Misc
Resolved
07/06/2021
-Provide and maintain gravel filter -immediate street cleanup required
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
07/06/2021
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. -EROSION CONTROL REQUIRED AT FRONT OF LOT-
Occupancy Inspection - Codes Residential Not Ready 7/7/2021 7/7/2021 07/07/2021
Erosion Control Inspection Residential Failed 7/7/2021 07/07/2021
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
07/06/2021
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. -EROSION CONTROL REQUIRED AT FRONT OF LOT-
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
07/07/2021
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Occupancy Inspection - Codes Residential Not Ready 7/9/2021 7/9/2021 07/09/2021
Corrective Action Required
07/09/2021
*No water connected. *no shower glass. *provide gfci on laundry outlet *provide 1 1/2" clearance to handrail flight to garage level from 1st floor. *bubble cover on front porch outlet. * sod, final grade, gutters splashblocks. exterior incomplete for final inspeciton.
Occupancy Inspection - Codes Residential Temporary C of O 7/12/2021 7/12/2021 07/12/2021
Misc
Corrective Action Required
07/12/2021
* sod, final grade, gutters splashblocks. exterior incomplete for final inspeciton.
Sidewalk Inspection Passed 7/13/2021 7/13/2021 07/13/2021
Water Service Inspection - R Passed 09/12/2022
Misc
Informational
01/13/2021
Only partial approval at the time of installation due to meter box lid is currently below grade. Will revisit the issue at final to ensure meter box lid is accessible at grade and meter is 14-18” below lid
Erosion Control Inspection Residential Passed 9/12/2022 09/12/2022
DCM2 ESC DEFICIENT INSTALLATION
Resolved
09/12/2022
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. -EROSION CONTROL REQUIRED AT FRONT OF LOT-
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
09/12/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Plot Plan Inspection Passed 9/12/2022 09/12/2022
Occupancy Inspection - Codes Residential Full C of O 9/12/2022 9/12/2022 09/12/2022
Misc
Resolved
09/12/2022
* sod, final grade, gutters splashblocks. exterior incomplete for final inspeciton.
Documents & Images
Date Uploaded File Type Document Name
10/16/2020 Application Form Permit Application
10/16/2020 Application Form License Tax Application
10/19/2020 Letter Codes Residential Plan Review
10/26/2020 Plot Plan Approved Plot Plan
10/26/2020 2334 SW Old Port Rd - Revised plans - 10-26-20
10/26/2020 Approved Plans Approved Drawings
11/02/2020 Receipt Receipt for transaction:2020-007312
11/02/2020 Letter DS Building Permit
11/24/2020 Letter INSPECTION SUMMARY
11/24/2020 Letter INSPECTION SUMMARY
01/12/2021 Letter INSPECTION SUMMARY
01/13/2021 Letter INSPECTION SUMMARY
01/28/2021 Letter INSPECTION SUMMARY
01/28/2021 Letter INSPECTION SUMMARY
01/28/2021 Letter INSPECTION SUMMARY
02/03/2021 Letter INSPECTION SUMMARY
03/10/2021 Letter INSPECTION SUMMARY
03/19/2021 Letter INSPECTION SUMMARY
03/29/2021 Letter INSPECTION SUMMARY
04/06/2021 Letter INSPECTION SUMMARY
04/06/2021 Letter INSPECTION SUMMARY
04/06/2021 Letter INSPECTION SUMMARY
04/06/2021 Letter INSPECTION SUMMARY
04/09/2021 Letter INSPECTION SUMMARY
04/12/2021 Letter INSPECTION SUMMARY
04/12/2021 Letter INSPECTION SUMMARY
07/06/2021 Letter INSPECTION SUMMARY
07/06/2021 7-6-21.jpg
07/06/2021 7-6-21(2).jpg
07/06/2021 Letter INSPECTION SUMMARY
07/06/2021 Letter INSPECTION SUMMARY
07/07/2021 Letter INSPECTION SUMMARY
07/07/2021 Letter INSPECTION SUMMARY
07/09/2021 Letter INSPECTION SUMMARY
07/09/2021 Letter INSPECTION SUMMARY
07/09/2021 Receipt Receipt for transaction:2021-005511
07/12/2021 Letter Codes Temporary Certificate of Occupancy
07/13/2021 Letter INSPECTION SUMMARY
07/13/2021 Letter INSPECTION SUMMARY
09/12/2022 Letter Codes Final Certificate of Occupancy
09/12/2022 Letter Field Certificate of Occupancy
09/12/2022 Letter INSPECTION SUMMARY
09/12/2022 Letter INSPECTION SUMMARY
09/12/2022 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home