PRRES20202122
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - FINISHED BASEMENT - COVERED DECK
07/29/2020
08/03/2020
07/14/2021
Locations
Contacts
GALE HOMES II INC, Address:400 SW LONGVIEW BLVD, Unit 109, Phone:(816) 761-9292  
APEX HEATING & AIR CONDITIONING INC, Address:1202 NW EAGLE RIDGE BLVD, Phone:(816) 228-2739  
MC ELECTRIC, Address:2701 S 96TH ST, Phone:(913) 721-2988  
R & R PLUMBING INC, Address:2001 GASLIGHT DR, Phone:(816) 772-5431  
MFAULKNER@GALECOMMUNITIES.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Residential Plan Review Approved 08/03/2020 08/03/2020
Kim Brennan
05 Provide square footage of living area, garage area, unfinished basement
Corrective Action Required
07/30/2020

Provide square footage of living area, garage area, unfinished basement area, etc (IRC Section R304) The drawings show 246 square feet of unfinished basement but the application shows 394. Please confirm which is correct.
Misc
Corrective Action Required
07/30/2020

The foundation page says "Walkout foundation plan" when this is not a walkout basement. Please delete the word walkout from the foundation page.
Plot Plan Review Approved 08/03/2020 07/31/2020
Kim Brennan
Sidewalks
Corrective Action Required
07/30/2020

Sidewalks with dimensions must be provided on the plot plan.
Basement egress
Corrective Action Required
07/30/2020

Basement egress location(s) and elevation of the lowest adjacent grade must be provided on the plot plan.
As-graded plot plan
Corrective Action Required
07/30/2020

A as-graded plot plan per Section 7-160, Code of Ordinances, is required prior to occupancy.
City infrustructure
Corrective Action Required
07/30/2020

Show all manholes, water valve boxes, fire hydrants, and stormwater structures. Please show fire hydrant located at the front north corner of the lot.
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $1,058.18 $1,058.18 Paid 08/03/2020
Right of Way Permit Fee $80.00 $80.00 Paid 08/03/2020
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 08/03/2020
8331507-Sewer Connection Fee $480.00 $480.00 Paid 08/03/2020
Water Tap Fee $3,581.00 $3,581.00 Paid 08/03/2020
Water Meter Fee $455.54 $455.54 Paid 08/03/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Piers/Caissons Inspection - Residential Passed 8/19/2020 08/19/2020
Misc
Informational
08/19/2020
-DECK PIERS POURED WITH FOOTING -
Footing Inspection - Residential Failed 8/24/2020 (9:45) 8/24/2020 08/24/2020
Misc
Corrective Action Required
08/24/2020
- NO CITY STAMP ON PLANS ON SITE - - COLUMN PADS A 30 X 30 PER PLAN - - COLUMN PAD C 42 X 42 PER PLAN - - UFER GARAGE WALL NEAR WATER HEATER - - 2 DECK PIERS POURED WITH DRILLED PIERS ( 3RD Party)
Footing Inspection - Residential Passed 9/17/2020 (8:30) 9/17/2020 09/17/2020
Misc
Corrective Action Required
08/24/2020
- UFER GARAGE WALL NEAR WATER HEATER - - 2 DECK PIERS POURED WITH DRILLED PIERS ( 3RD Party)
Erosion Control Inspection Residential Failed 9/17/2020 09/17/2020
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
09/17/2020
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED.
Sewer Service Inspection - R Passed 10/23/2020 (1:00) 10/23/2020 10/23/2020
Water Service Inspection - R Partial 10/23/2020 (1:00) 10/23/2020 at 1:50 PM 10/23/2020
Water Service Inspection - R Passed 10/26/2020 (11:15) 10/26/2020 10/26/2020
Erosion Control Inspection Residential Passed 11/10/2020
Misc
Resolved
11/10/2020
-Continuous maintenance required. Erosion control required at front and rear of lot -Provide and maintain gravel filter at driveway -Immediate street cleanup required TWO BUSINESSES DAYS TO COMPLY OR STOP WORK ORDER WILL BE ISSUED
Underslab Plumbing Inspection - Residential Passed 11/10/2020 11/10/2020 11/10/2020
Misc
Informational
11/10/2020
Provide correct building address
Erosion Control Inspection Residential Failed 01/21/2021
Misc
Corrective Action Required
01/21/2021
Immediate Street clean up required Post correct site address
Erosion Control Inspection Residential Passed 01/29/2021
DCM2 ESC DEFICIENT INSTALLATION
Resolved
01/29/2021
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED.
Gas Piping Inspection - Residential Passed 2/1/2021 2/1/2021 02/01/2021
Gas Service Inspection - Residential Passed 2/1/2021 2/1/2021 02/01/2021
Electrical Service Inspection Failed 2/1/2021 2/1/2021 02/01/2021
Miscellaneous Correction
Corrective Action Required
02/01/2021
-Provide bonding bushing between meter and disconnect
All Rough Inspection - Residential Failed 2/1/2021 2/1/2021 02/01/2021
Miscellaneous Correction
Corrective Action Required
02/01/2021
-Seal all plate penetrations -Provide midpoint strap on all DWV 2” and smaller -Provide stud shoes on exterior wall studs bored over 40% by fireplace -Missing double rafters at hearth room and foyer -Nail all double and triple 2x4 stud packs 12” oc -Missing (3) 2x4 under lvl at walk in closet -Provide Simpson LS70 clips or equivalent at stair stringers per plan -Fireblock deadspaces in basement at soffit line north wall and powder room -Bond metallic box above furnace -Protection plates at NM at mechanical room wall -NM not permitted in underslab raceway -Identify white conductorS as current carrying conductors at both points of termination -Attatch 2x4 flat framing greater than 4’ to floor joists -BOCCA plates all DWV top and bottom plates in basement -Protection plates for DWV and PEX less than 1.25” from face of stud in basement
All Rough Inspection - Residential Passed 2/3/2021 2/3/2021 02/03/2021
Electrical Service Inspection Passed 2/3/2021 2/3/2021 02/03/2021
Miscellaneous Correction
Resolved
02/03/2021
-Provide bonding bushing between meter and disconnect
Driveway Inspection Partial 3/19/2021 3/19/2021 03/19/2021
Misc
Informational
03/19/2021
Forms were placed and aggregate was present and compacted. RP 3-19-21
Sidewalk Inspection Partial 3/19/2021 3/19/2021 03/19/2021
Misc
Informational
03/19/2021
Forms were placed and aggregate was present and compacted. I had the crew lower the hydrant valve to be flush with the sidewalk. RP 3-19-21
Sidewalk Inspection Passed 3/26/2021 3/26/2021 03/29/2021
Misc
Informational
03/19/2021
Forms were placed and aggregate was present and compacted. I had the crew lower the hydrant valve to be flush with the sidewalk. RP 3-19-21
Misc
Informational
03/29/2021
Finished sidewalk meets LS and ADA specs. 3-29-21
Driveway Inspection Passed 3/26/2021 3/26/2021 03/29/2021
Misc
Informational
03/19/2021
Forms were placed and aggregate was present and compacted. RP 3-19-21
Misc
Informational
03/29/2021
Finished driveway meets LS and ADA specs. RP 3-29-21
Erosion Control Inspection Residential Failed 05/18/2021
Misc
Corrective Action Required
05/18/2021
-Establish erosion control methods and maintain until sod is in place -remove debris from sidewalk
Plot Plan Inspection Failed 5/25/2021 05/25/2021
Misc
Corrective Action Required
05/25/2021
-Remove silt from swale -locate and expose fire hydrant valve lid, ensure accessible at grade
Erosion Control Inspection Residential Passed 06/15/2021
Misc
Resolved
06/15/2021
-Establish erosion control methods and maintain until sod is in place -remove debris from sidewalk
Occupancy Inspection - Codes Residential Failed 6/15/2021 6/15/2021 06/15/2021
Misc
Corrective Action Required
06/15/2021
-Laundry circuit requires AFCI and GFCI protection. Identify this circuit in electric panel -GFCI protect receptacle at cooking countertop space in pantry -Provide sprinkler signage water shut off -Seal between garage door trimmers and foundation, third car -Seal top and sides of AC disconnect, electric meter enclosure and exterior disconnect enclosure -Secure raceway at AC disconnect termination -Seal exterior penetrations -Complete gas line furr out in garage
Plot Plan Inspection Passed 06/15/2021
Misc
Resolved
06/15/2021
-Remove silt from swale -locate and expose fire hydrant valve lid, ensure accessible at grade
Occupancy Inspection - Codes Residential Full C of O 7/14/2021 7/14/2021 07/14/2021
Misc
Resolved
07/14/2021
Documents & Images
Date Uploaded File Type Document Name
07/29/2020 Letter Permit Application
07/29/2020 Letter License Tax Form
07/30/2020 Letter Codes Residential Plan Review
07/31/2020 Plot Plan Approved Plot Plan
08/03/2020 Revised Lower Level - Foundation Plan for Rev_ Story and a Half
08/03/2020 Drawing Approved Drawings
08/03/2020 Receipt Receipt for transaction:2020-004920
08/03/2020 Letter DS Building Permit
08/19/2020 Letter Final_2020.08.14_HPier_LSMO_Gale Homes
08/19/2020 Letter INSPECTION SUMMARY
08/24/2020 Letter INSPECTION SUMMARY
09/17/2020 Letter INSPECTION SUMMARY
09/17/2020 Letter INSPECTION SUMMARY
10/23/2020 Letter INSPECTION SUMMARY
10/23/2020 Letter INSPECTION SUMMARY
10/26/2020 Letter INSPECTION SUMMARY
10/26/2020 Letter INSPECTION SUMMARY
11/10/2020 Letter INSPECTION SUMMARY
11/10/2020 Letter INSPECTION SUMMARY
11/10/2020 Letter INSPECTION SUMMARY
01/21/2021 Letter INSPECTION SUMMARY
01/29/2021 Letter INSPECTION SUMMARY
02/01/2021 Letter INSPECTION SUMMARY
02/01/2021 Letter INSPECTION SUMMARY
02/01/2021 Letter INSPECTION SUMMARY
02/01/2021 Letter INSPECTION SUMMARY
02/03/2021 Letter INSPECTION SUMMARY
02/03/2021 Letter INSPECTION SUMMARY
03/19/2021 Letter INSPECTION SUMMARY
03/19/2021 Letter INSPECTION SUMMARY
03/29/2021 Letter INSPECTION SUMMARY
03/29/2021 Letter INSPECTION SUMMARY
05/18/2021 Letter INSPECTION SUMMARY
05/24/2021 Plot Plan Approved As Graded Plot Plan
05/25/2021 Letter INSPECTION SUMMARY
06/15/2021 Letter INSPECTION SUMMARY
06/15/2021 Letter INSPECTION SUMMARY
06/15/2021 Letter INSPECTION SUMMARY
07/14/2021 Letter Field Certificate of Occupancy
07/14/2021 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home