Permit Application Status

PRRES20201978


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20201978
Building Permit - Residential
Certificate of Occupancy
CMH PARKS INC
NEW SINGLE FAMILY
NEW SINGLE FAMILY FINISHED BASEMENT COVERED DECK ROOF TRUSSES
07/16/2020
07/22/2020
04/02/2021
Locations
Contacts
CMH PARKS INC, Address:5000 CLAYTON RD  
CLAYTON PROPERTIES GROUP, INC, Address:10450 Holmes Rd Suite 100, Phone:(816) 246-6700  
PERMITTING@SUMMITHOMESKC.COM  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
Reviews
Review Type Outcome Est. Completion Date Completed
Residential Plan Review Approved 07/21/2020 07/21/2020
Steve Conrick
Planning Review (RES) Approved 07/23/2020 07/21/2020
Victoria Nelson
Plot Plan Review Approved 07/21/2020 07/21/2020
Steve Conrick
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $979.06 $979.06 Paid 07/22/2020
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 07/22/2020
Water Meter Fee $455.54 $455.54 Paid 07/22/2020
Water Tap Fee $3,581.00 $3,581.00 Paid 07/22/2020
8331507-Sewer Connection Fee $360.00 $360.00 Paid 07/22/2020
Right of Way Permit Fee $80.00 $80.00 Paid 07/22/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 8/3/2020 8/3/2020 08/03/2020
Sewer Service Inspection - R Passed 8/17/2020 (1:00) 8/17/2020 08/17/2020
Water Service Inspection - R Passed 8/18/2020 (1:00) 8/18/2020 08/18/2020
Underslab Plumbing Inspection - Residential Passed 9/1/2020 9/1/2020 09/01/2020
Electrical Service Inspection Failed 11/16/2020 11/16/2020 11/16/2020
Misc
Corrective Action Required
11/16/2020
-Color code/label grounding electrode conductor
Gas Piping Inspection - Residential Failed 11/16/2020 11/16/2020 11/16/2020
Misc
Corrective Action Required
11/16/2020
-Secure gas flex line at fireplace -Complete Furnace install and complete gas line
Gas Service Inspection - Residential Failed 11/16/2020 11/16/2020 11/16/2020
Misc
Corrective Action Required
11/16/2020
-Secure gas flex line at fireplace -Complete Furnace install and complete gas line -Gas pressure test required
All Rough Inspection - Residential Failed 11/16/2020 11/16/2020 11/16/2020
Misc
Corrective Action Required
11/16/2020
-Fireblock deadspace at master shower/master water closet -Seal all top and bottom plate penetrations -Fireblock deadspace between walls at refrigerator in kitchen -Seal gaps in Fireblock lid at fireplace, seal penetrations through Fireblock -Secure gas flex line at fireplace -Fireblock unused floor bore at chase for radon and b vent at kitchen -Fireblock all tub and shower traps -security blocking at backdoor, front door, basement door -Fireblock deadspace behind 1st floor shower and stairs -Attic access required, per plans -Fireblock top plate at bath exhaust line, basement bath -Fireblock penetrations in Fireblock top plate above main service panel in basement -Color code/label grounding electrode conductor -Complete Furnace install and complete gas line -Gas Pressure test required -(3) 2x10 floor joists at stairs per plans -Provide (2) bolts per post/rim connection at deck
Electrical Service Inspection Passed 11/18/2020 11/18/2020 11/18/2020
Misc
Resolved
11/18/2020
All Rough Inspection - Residential Failed 11/18/2020 11/18/2020 11/18/2020
Misc
Corrective Action Required
11/16/2020
-Fireblock deadspace between walls at refrigerator in kitchen - seal gaps at top plate Fireblock in deadspace -Secure NM and land to boxes in kitchen, seal floor penetrations -Secure NM and land to boxes at finished basement stairs -Seal top plate penetrations basement at stairs -Fireblock deadspace behind 1st floor shower and stairs -Attic access required, per plans -Complete Furnace install and complete gas line -Gas Pressure test required -Provide (2) bolts per post/rim connection at deck OK TO INSULATE, REMOVE INSULATION FROM ANY INSPECTION ITEMS
All Rough Inspection - Residential Passed 11/20/2020 11/20/2020 11/20/2020
Misc
Resolved
11/20/2020
Gas Piping Inspection - Residential Passed 11/24/2020 11/24/2020 11/24/2020
Misc
Resolved
11/24/2020
Gas Service Inspection - Residential Passed 11/24/2020 11/24/2020 11/24/2020
Misc
Resolved
11/24/2020
Driveway Inspection Passed 12/8/2020 (A.M.) 12/8/2020 12/08/2020
Misc
Informational
12/08/2020
On Tuesday, 12-08-2020. I performed a driveway inspection and passed subgrade and forming to pour concrete.
Sidewalk Inspection Passed 12/8/2020 (A.M.) 12/8/2020 12/08/2020
Misc
Informational
12/08/2020
On Tuesday, 12-08-2020. A sidewalk inspection was performed and passed inspection to pour sidewalk.
Occupancy Inspection - Codes Residential Failed 2/10/2021 2/10/2021 02/10/2021
Misc
Corrective Action Required
02/10/2021
-Complete final grade and sod -Splash blocks at all downspout and sump pump discharge locations, minimum 36” from foundation -Seal all penetrations in siding, seal along top of AC disconnect and meter can -guardrail required at front porch, more than 30” from grade -Tamper resistant valve caps at AC compressor
Occupancy Inspection - Codes Residential Temporary C of O 3/12/2021 3/12/2021 03/12/2021
Misc
Corrective Action Required
02/10/2021
-Tamper resistant valve caps at AC compressor TCO EXTENSION VALID THROUGH 03/19/2021
Erosion Control Inspection Residential Passed 03/12/2021
Plot Plan Inspection Failed 03/12/2021
Misc
Corrective Action Required
03/12/2021
-water meter lid is required to be accessible at grade level -lawn irrigation backflow lid is required to be accessible at grade level
Piers/Caissons Inspection - Residential Passed 03/12/2021
Occupancy Inspection - Codes Residential Full C of O 4/2/2021 4/2/2021 04/02/2021
Misc
Resolved
04/02/2021
-Tamper resistant valve caps at AC compressor TCO EXTENSION VALID THROUGH 03/19/2021
Documents & Images
Date Uploaded File Type Document Name
07/16/2020 H4 #63 - PERMIT APPLICATION
07/16/2020 63 HAWTHORNE RIDGE ROOF LAYOUT- signed
07/16/2020 H4 #63 - Moorefield - Mediterranean - Sheets- signed
07/16/2020 2379052 RF SEALS 06222020
07/16/2020 LOT 63 FINAL
07/21/2020 H4 #63 - Moorefield - Mediterranean - Sheets- signed
07/21/2020 Plot Plan APPROVED LOT 63 FINAL
07/21/2020 APPROVED H4 #63 - Moorefield - Mediterranean - Sheets- signed
07/21/2020 APPROVED 2379052 RF SEALS 06222020
07/21/2020 APPROVED 63 HAWTHORNE RIDGE ROOF LAYOUT- signed
07/22/2020 Receipt Receipt for transaction:2020-004617
07/22/2020 Letter DS Building Permit
08/03/2020 Lot 63 Hawthorne Ridge Footing Inspection
08/03/2020 Letter INSPECTION SUMMARY
08/17/2020 Lot 63 Hawthorne Ridge wall
08/17/2020 Letter INSPECTION SUMMARY
08/18/2020 Letter INSPECTION SUMMARY
09/01/2020 Letter INSPECTION SUMMARY
11/16/2020 Letter INSPECTION SUMMARY
11/16/2020 Letter INSPECTION SUMMARY
11/16/2020 Letter INSPECTION SUMMARY
11/16/2020 Letter INSPECTION SUMMARY
11/17/2020 Letter INSPECTION SUMMARY
11/18/2020 Letter INSPECTION SUMMARY
11/18/2020 Letter INSPECTION SUMMARY
11/20/2020 Letter INSPECTION SUMMARY
11/24/2020 Letter INSPECTION SUMMARY
11/24/2020 Letter INSPECTION SUMMARY
02/10/2021 Letter INSPECTION SUMMARY
03/12/2021 Letter Codes Temporary Certificate of Occupancy
03/12/2021 Letter INSPECTION SUMMARY
03/12/2021 Letter INSPECTION SUMMARY
03/12/2021 Letter INSPECTION SUMMARY
03/12/2021 Letter INSPECTION SUMMARY
03/12/2021 Letter INSPECTION SUMMARY
03/12/2021 Letter INSPECTION SUMMARY
03/12/2021 Letter INSPECTION SUMMARY
04/02/2021 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home