Summary
PRRES20201493
Building Permit - Residential
Certificate of Occupancy
SILVERSTONE DEVELOPMENT LLC
NEW SINGLE FAMILY
NEW SINGLE FAMILY
06/04/2020
06/10/2020
02/27/2024
Locations
Contacts
SILVERSTONE DEVELOPMENT LLC, Address:PO BOX 346  
Not shown for privacy reasons.
Not shown for privacy reasons.
Not shown for privacy reasons.
Not shown for privacy reasons.
Not shown for privacy reasons.
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 06/09/2020 06/09/2020
Steve Conrick
Residential Plan Review Approved 06/09/2020 06/09/2020
Steve Conrick
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $1,331.37 $1,331.37 Paid 06/10/2020
Right of Way Permit Fee $80.00 $80.00 Paid 06/10/2020
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 06/10/2020
8331507-Sewer Connection Fee $570.00 $570.00 Paid 06/10/2020
Water Tap Fee $3,477.00 $3,477.00 Paid 06/10/2020
Water Meter Fee $425.02 $425.02 Paid 06/10/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Sewer Service Inspection - R Passed 6/22/2020 (1:00) 6/22/2020 at 12:40 PM 06/22/2020
Water Service Inspection - R Passed 6/23/2020 (11:30) 6/23/2020 at 1:00 PM 06/23/2020
Underslab Plumbing Inspection - Residential Passed 6/24/2020 6/24/2020 06/23/2020
Piers/Caissons Inspection - Residential Passed 7/9/2020 (1:00) 7/9/2020 at 2:35 PM 07/09/2020
All Rough Inspection - Residential Failed 9/9/2020 9/9/2020 09/09/2020
Misc
Corrective Action Required
09/09/2020
FRAMING: -Frame out garage return air space wall for R-13 insulation -Toe nail joists to top plates and sill plates with 4-8d or 3-10 d nails -Joist notched more than 1/6 depth near rear living room wall. -Nail double joist hanger above foyer -Studs at front bedroom above garage not continuous from floor to ceiling -fur down master bathroom rafter joist ceiling for R-30 insulation -Solidblock between joists under middle front bedroom bearing wall min every 4 ft -Install support device at header joist-to-double joist connection above basement stair PLUMBING: -Strap exterior and interior bearing wall top plates bored more than 50%; nail both sides of strap with min 4-10 nails -Protect water lines at master closet wall -Slope vent in attic toward drain MECHANICAL: -Vent bathroom fan to outside -At dryer duct top plate strap, install min 4-10d nails on each side ELECTRICAL: -Secure SE cable within 12” of meter enclosure **OK TO INSULATE
Electrical Service Inspection Failed 9/9/2020 9/9/2020 09/09/2020
Misc
Corrective Action Required
09/09/2020
-Install a #4 bonding jumper from the bus bar where to grounding electrode conductor is connected to to the grounded bus bar where the service grounded conductor is connected to
Gas Service Inspection - Residential Failed 9/9/2020 9/9/2020 09/09/2020
Misc
Corrective Action Required
09/09/2020
-Provide min 10 psi test pressure
Electrical Service Inspection Passed 9/17/2020 9/17/2020 09/17/2020
Misc
Resolved
09/17/2020
-Install a #4 bonding jumper from the bus bar where to grounding electrode conductor is connected to to the grounded bus bar where the service grounded conductor is connected to
Gas Service Inspection - Residential Failed 9/17/2020 9/17/2020 09/17/2020
Misc
Corrective Action Required
09/09/2020
-Provide min 10 psi test pressure
All Rough Inspection - Residential Failed 9/17/2020 9/17/2020 09/17/2020
Misc
Corrective Action Required
09/09/2020
FRAMING: -Toe nail joists to top plates and sill plates with 4-8d or 3-10 d nails **provide verification with a ladder -Joist notched more than 1/6 depth near rear living room wall. **The fix can only be approved by the engineer. Have the engineer address if it can handle load (floor and bath tub weight)
All Rough Inspection - Residential Passed 9/25/2020 9/25/2020 09/25/2020
Misc
Resolved
09/25/2020
FRAMING: -Toe nail joists to top plates and sill plates with 4-8d or 3-10 d nails **provide verification with a ladder -Joist notched more than 1/6 depth near rear living room wall. **The fix can only be approved by the engineer. Have the engineer address if it can handle load (floor and bath tub weight)
Gas Service Inspection - Residential Passed 9/25/2020 9/25/2020 09/25/2020
Misc
Resolved
09/25/2020
-Provide min 10 psi test pressure
Footing Inspection - Residential Passed 9/25/2020 09/25/2020
Informational
09/25/2020
FOOTING INSPECTED AND APPROVED BY ENGINEER
Driveway Inspection Partial 12/14/2020 (P.M.) 12/14/2020 12/14/2020
Misc
Informational
12/14/2020
12/14/20 Monday 3:16PM Driveway - forms and materials passed pre-inspection.
Occupancy Inspection - Codes Residential Failed 12/16/2020 12/16/2020 12/16/2020
Misc
Corrective Action Required
12/16/2020
-Driveway and rear patio not completed -Final grade, sod, downspout and sump pump extensions -Make sure that the sewer tracer wire and port are installed and available at grade level -Install weather proof cover for rear patio receptacle -Install tamper-proof caps at AC valves -The bottom garage door track support bracket height from floor must be per engineer design -Provide gfci protection for laundry outlets per NEC 210.8(A) -Provide AFCI protection for all outlets required per NEC 210.12 (laundry and refrigerator) -The luminaries in master closet shall be completely enclosed-lamp type -Install airtight plug for the sewer clean out
Driveway Inspection Passed 12/18/2020 12/18/2020 12/18/2020
Misc
Informational
12/14/2020
12/14/20 Monday 3:16PM Driveway - forms and materials passed pre-inspection.
Misc
Informational
12/18/2020
12/18/20 Thursday 9:00AM Driveway - Appears to meet specifications (pass). Driveway is still curing because of cold weather.
Occupancy Inspection - Codes Residential Temporary C of O 12/18/2020 12/18/2020 12/18/2020
Misc
Corrective Action Required
12/16/2020
-Final grade, sod, downspout and sump pump extensions -Make sure that the sewer tracer wire and port are installed and available at grade level
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.