Permit Application Status

PRRES20192901


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20192901
Building Permit - Residential
Certificate of Occupancy
CMH PARKS INC
NEW SINGLE FAMILY
NEW HOUSE - COVERED PATIO - UNFINISHED BASEMENT
10/04/2019
10/14/2019
06/05/2020
Locations
Contacts
CMH PARKS INC, Address:5000 CLAYTON RD  
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
PERMITTING@SUMMITHOMESKC.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
KIMBEL MECHANICAL SYSTEMS, INC, Address:1936 N SHILOH DR, Phone:(479) 756-1099  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 10/08/2019 10/14/2019
Dylan Eppert
Right-of-way
Corrective Action Required
10/07/2019

The right-of-way with dimensions must be provided on the plot plan.
As-graded plot plan
Corrective Action Required
10/07/2019

A as-graded plot plan per Section 7-160, Code of Ordinances, is required prior to occupancy.
Residential Plan Review Approved 10/08/2019 10/07/2019
Dylan Eppert
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $1,160.45 $1,160.45 Paid 10/14/2019
8331504-EFHB Middle Big Creek, Full $535.68 $535.68 Paid 10/14/2019
8331507-Sewer Connection Fee $480.00 $480.00 Paid 10/14/2019
8331401-Water Tap Fee $3,477.00 $3,477.00 Paid 10/14/2019
8350015-Water Meter Fee $425.02 $425.02 Paid 10/14/2019
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 10/14/2019
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 10/14/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 11/1/2019 (11:00) 11/1/2019 11/01/2019
Underslab Plumbing Inspection - Residential Passed 12/3/2019 12/3/2019 12/03/2019
Water Service Inspection - R Partial 2/12/2020 02/12/2020
Sewer Service Inspection - R Passed 2/18/2020 2/18/2020 02/18/2020
Water Service Inspection - R Passed 2/18/2020 2/18/2020 02/18/2020
Piers/Caissons Inspection - Residential Passed 2/21/2020 (1:00) 2/21/2020 02/21/2020
Misc
Informational
02/21/2020
(2) 24 x 36 PIERS
Gas Piping Inspection - Residential Passed 3/25/2020 3/25/2020 03/25/2020
Gas Service Inspection - Residential Passed 3/25/2020 3/25/2020 03/25/2020
Electrical Service Inspection Passed 3/25/2020 3/25/2020 03/25/2020
All Rough Inspection - Residential Failed 3/25/2020 3/25/2020 03/25/2020
Misc
Corrective Action Required
03/25/2020
- land all conductors in a box - provide 800 lb hold down device EC #2 per plan @ kitchen & breakfast - seal all upward penetrations throughout - provide PFH portal frame garage door per plan - anchor bolts shall be in middle 1/3 of the width of plate - provide blocking at sheathing breaks above front door - provide fire block entry closet near garage - install bath exhaust - provide truss hangers per schedule
All Rough Inspection - Residential Failed 3/30/2020 3/30/2020 03/30/2020
Misc
Corrective Action Required
03/25/2020
- provide 800 lb hold down device EC #2 per plan @ kitchen & breakfast ( tighten anchor bolts on above) - seal upward penetration (master bed near tub , kitchen both sides of window above sink, above range, above 20 min door at garage) - provide PFH portal frame garage door per plan ( 5/8 anchor bolts, double bottom plate, I red lined plans in fireplace ) - provide metallic tape bath exhaust fan ( no electrical or duct tape) - provide truss hangers per schedule ( powder bath @ garage LTHJA26)
All Rough Inspection - Residential Passed 4/1/2020 4/1/2020 04/01/2020
Misc
Resolved
04/01/2020
- provide 800 lb hold down device EC #2 per plan @ kitchen & breakfast ( tighten anchor bolts on above) - seal upward penetration (master bed near tub , kitchen both sides of window above sink, above range, above 20 min door at garage) - provide PFH portal frame garage door per plan ( 5/8 anchor bolts, double bottom plate, I red lined plans in fireplace ) - provide metallic tape bath exhaust fan ( no electrical or duct tape) - provide truss hangers per schedule ( powder bath @ garage LTHJA26)
Driveway Inspection Partial 4/7/2020 4/7/2020 04/07/2020
Misc
Informational
04/07/2020
PRE POUR INSPECTION The forms are set and there appears to be sufficient compacted aggregate.
Driveway Inspection Passed 4/10/2020 04/13/2020
Misc
Informational
04/07/2020
PRE POUR INSPECTION The forms are set and there appears to be sufficient compacted aggregate.
Erosion Control Inspection Residential Passed 05/26/2020
Plot Plan Inspection Passed 6/9/2020 05/26/2020
Occupancy Inspection - Codes Residential Failed 5/26/2020 5/26/2020 05/26/2020
Misc
Corrective Action Required
05/26/2020
-ADDRESS IDENTIFICATION CHARACTERS SHALL CONTRAST WITH THEIR BACKGROUND -PROVIDE SEALED LIGHT FIXTURES ON EXTERIOR -SEAL EXTERIOR PENETRATION ON GAS METER -PROVIDE HANDRAIL ON STAIRWAY
Occupancy Inspection - Codes Residential Full C of O 6/5/2020 6/5/2020 06/05/2020
Misc
Resolved
06/05/2020
Documents & Images
Date Uploaded File Type Document Name
10/07/2019 Letter Codes Residential Plan Review
10/14/2019 Receipt Receipt for transaction: 2019-006757
10/14/2019 Letter DS Building Permit
10/14/2019 Plot Plan DOC101419-003
11/01/2019 Letter INSPECTION SUMMARY
12/03/2019 Letter INSPECTION SUMMARY
12/03/2019 Letter INSPECTION SUMMARY
02/12/2020 Letter INSPECTION SUMMARY
02/18/2020 Letter INSPECTION SUMMARY
02/18/2020 Letter INSPECTION SUMMARY
02/21/2020 Letter INSPECTION SUMMARY
03/25/2020 Letter INSPECTION SUMMARY
03/25/2020 Letter INSPECTION SUMMARY
03/25/2020 Letter INSPECTION SUMMARY
03/25/2020 Letter INSPECTION SUMMARY
03/30/2020 Letter INSPECTION SUMMARY
04/01/2020 Letter INSPECTION SUMMARY
04/07/2020 Letter INSPECTION SUMMARY
04/13/2020 Letter INSPECTION SUMMARY
05/26/2020 Letter INSPECTION SUMMARY
05/26/2020 Letter INSPECTION SUMMARY
05/26/2020 Letter INSPECTION SUMMARY
06/05/2020 Letter Field Certificate of Occupancy
06/05/2020 Letter Codes Final Certificate of Occupancy
06/08/2020 APPROVED AS-BUILT
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home