Permit Application Status

PRRES20192072


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20192072
Building Permit - Residential
Certificate of Occupancy
CMH PARKS INC
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT - COVERED PATIO
08/01/2019
08/09/2019
03/31/2021
Locations
Contacts
CMH PARKS INC, Address:5000 CLAYTON RD  
CLAYTON PROPERTIES GROUP, INC, Address:10450 Holmes Rd Suite 100, Phone:(816) 246-6700  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
KIMBEL MECHANICAL SYSTEMS, INC, Address:1936 N SHILOH DR, Phone:(479) 756-1099  
RYAN@SUMMITHOMESKC.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Residential Plan Review Approved 08/05/2019 08/09/2019
Dylan Eppert
08 Designate locations of smoke detectors and carbon monoxide detectors
Corrective Action Required
08/01/2019

Designate locations of smoke detectors and carbon monoxide detectors. (IRC Section R314 and R315) No smoke detector is shown in the unfinished basement
Plot Plan Review Approved 08/05/2019 08/05/2019
Steve Conrick
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $967.23 $967.23 Paid 08/09/2019
Right of Way Permit Fee $80.00 $80.00 Paid 08/09/2019
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 08/09/2019
8331507-Sewer Connection Fee $360.00 $360.00 Paid 08/09/2019
Water Tap Fee $3,477.00 $3,477.00 Paid 08/09/2019
Water Meter Fee $425.02 $425.02 Paid 08/09/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 8/28/2019 (11:00) 8/28/2019 08/28/2019
Sewer Service Inspection - R Passed 9/23/2019 9/24/2019 09/24/2019
Water Service Inspection - R Passed 9/25/2019 9/25/2019 09/25/2019
Underslab Plumbing Inspection - Residential Passed 10/3/2019 10/3/2019 10/03/2019
Misc
Resolved
10/03/2019
Address not posted
Piers/Caissons Inspection - Residential Failed 12/23/2019 12/23/2019
Misc
Corrective Action Required
12/23/2019
2 PIERS FAILED. NOT ON SOLID ROCK. PROVIDE 36” DEPTH
Piers/Caissons Inspection - Residential Passed 1/3/2020 1/3/2020 01/03/2020
Misc
Resolved
01/03/2020
All Rough Inspection - Residential Failed 1/23/2020 1/23/2020 01/23/2020
Misc
Corrective Action Required
01/23/2020
- Double up overnotched stud, single car garage wall - Foundation bolts not secured with nuts or aligned with plate north wall basement - Address cut floor joist east side basement - Address cut floor joist north wall basement
Electrical Service Inspection Passed 1/23/2020 1/23/2020 01/23/2020
Gas Service Inspection - Residential Passed 1/23/2020 01/23/2020
Gas Piping Inspection - Residential Passed 1/23/2020 1/23/2020 01/23/2020
All Rough Inspection - Residential Passed 1/28/2020 1/28/2020 01/28/2020
Misc
Resolved
01/28/2020
Driveway Inspection Partial 3/4/2020 3/4/2020 03/04/2020
Misc
Informational
03/04/2020
Forms were placed and aggregate was present. Needs more aggregate and compacted. Curbing needs to be patched. RP 3-4-20
Sidewalk Inspection Partial 3/4/2020 3/4/2020 03/04/2020
Misc
Informational
03/04/2020
They didn’t have time to set up the sidewalk. They will call in another inspection tomorrow. RP 3-4-20
Sidewalk Inspection Failed 3/5/2020 3/5/2020 03/11/2020
Misc
Informational
03/04/2020
They didn’t have time to set up the sidewalk. They will call in another inspection tomorrow. RP 3-4-20
Misc
Corrective Action Required
03/11/2020
No expansion material between the ramp and the new sidewalk. The first four sidewalk panels from the ADA ramp are uneven and have low spots along the edges. Make corrections to the sidewalk panels.
Sidewalk Inspection Passed 3/29/2021 03/30/2020
Misc
Resolved
03/30/2020
They didn’t have time to set up the sidewalk. They will call in another inspection tomorrow. RP 3-4-20
Misc
Resolved
03/30/2020
No expansion material between the ramp and the new sidewalk. The first four sidewalk panels from the ADA ramp are uneven and have low spots along the edges. Make corrections to the sidewalk panels.
Misc
Informational
03/30/2020
Corrections have been made to the sidewalk and it is now in compliance.
Occupancy Inspection - Codes Residential Failed 4/13/2020 4/13/2020 04/10/2020
Misc
Corrective Action Required
04/10/2020
- Reestablish erosion control around lot - Install anti tip device on range - Size attic access door in garage to seal against ceiling trim - Switch plate cover required at basement light switch - Complete final grade and sod - Place splashblocks at all downspout and sump pump discharge locations for minimum distance from foundation 36”
Occupancy Inspection - Codes Residential Temporary C of O 9/2/2020 9/2/2020 09/02/2020
Misc
Resolved
09/02/2020
- Reestablish erosion control around lot - Install anti tip device on range - Size attic access door in garage to seal against ceiling trim - Switch plate cover required at basement light switch - Complete final grade and sod - Place splashblocks at all downspout and sump pump discharge locations for minimum distance from foundation 36”
Misc
Corrective Action Required
09/02/2020
Only partial approval on driveway inspection performed 3/4/2020 - contact City of Lee’s Summit Development Center to resolve this issue.
Driveway Inspection Passed 3/29/2021 03/30/2021
Misc
Informational
03/04/2020
Forms were placed and aggregate was present. Needs more aggregate and compacted. Curbing needs to be patched. RP 3-4-20
Plot Plan Inspection Passed 03/31/2021
Occupancy Inspection - Codes Residential Full C of O 3/31/2021 3/31/2021 03/31/2021
Misc
Resolved
03/31/2021
Documents & Images
Date Uploaded File Type Document Name
08/01/2019 Letter Codes Residential Plan Review
08/09/2019 Receipt Receipt for transaction: 2019-005479
08/09/2019 Letter DS Building Permit
08/14/2019 Plot Plan DOC081219-08122019141139
08/28/2019 Letter INSPECTION SUMMARY
09/20/2019 Letter INSPECTION SUMMARY
09/24/2019 Letter INSPECTION SUMMARY
09/25/2019 Letter INSPECTION SUMMARY
10/03/2019 Letter INSPECTION SUMMARY
12/23/2019 Letter INSPECTION SUMMARY
01/03/2020 Letter INSPECTION SUMMARY
01/23/2020 Letter INSPECTION SUMMARY
01/23/2020 Letter INSPECTION SUMMARY
01/23/2020 Letter INSPECTION SUMMARY
01/23/2020 Letter INSPECTION SUMMARY
01/28/2020 Letter INSPECTION SUMMARY
03/04/2020 Letter INSPECTION SUMMARY
03/04/2020 Letter INSPECTION SUMMARY
03/11/2020 Letter INSPECTION SUMMARY
03/30/2020 Letter INSPECTION SUMMARY
04/10/2020 Letter INSPECTION SUMMARY
09/02/2020 Letter Codes Temporary Certificate of Occupancy
03/30/2021 Letter INSPECTION SUMMARY
03/31/2021 Letter INSPECTION SUMMARY
03/31/2021 Letter Field Certificate of Occupancy
03/31/2021 Letter Codes Final Certificate of Occupancy
03/31/2021 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home