Permit Application Status

PRRES20191391


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20191391
Building Permit - Residential
Certificate of Occupancy
FIRST CHOICE CUSTOM HOMES LLC
NEW SINGLE FAMILY
NEW HOUSE - FINISHED BASEMENT - COVERED DECK
05/30/2019
06/07/2019
05/13/2020
Locations
Contacts
FIRST CHOICE CUSTOM HOMES LLC, Address:20863 COTTONWOOD CIR  
FIRST CHOICE CUSTOM HOMES LLC, Address:PO BOX 860072, Phone:(913) 449-8935  
DELTA T MECHANICAL SERVICES, Address:7612 NE COUNTY ROAD 13004, Phone:(816) 400-2937  
ADVANCED SERVICES D.S. LLC, Address:1208 N KURZWEIL RD, Phone:(816) 322-2920  
UNITED PLUMBING & SERVICE CO INC, Address:301 DUCK RD, Phone:(816) 761-5262  
MILLERGAGE@AOL.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Residential Plan Review Approved 06/03/2019 06/05/2019
Kim Brennan
05 Provide square footage of living area, garage area, unfinished basement
Corrective Action Required
05/30/2019

Provide square footage of living area, garage area, unfinished basement area, etc (IRC Section R304)
10 Combustion air
Corrective Action Required
05/30/2019

Provide combustion air calculations and specify transfer air grilles for fuel burning appliances located in confined space(s). (IRC Chapter 17 and Section G2407)
37 Provide details for any walls over 10 feet in height.
Corrective Action Required
05/30/2019

Provide details for any walls over 10 feet in height. Include stud grade, size, spacing and actual, uninterrupted height. (IRC Section 602.3.1 and Table 602.3(5) & 602.3.1) does not specify uninterrupted
Misc
Corrective Action Required
05/30/2019

The address on the plans is incorrect. It should be Blackstone Court versus Blackstone Place
Miscellaneous Correction
Corrective Action Required
05/30/2019

The mechanical contractor does not have a valid business license. They will need to get a business license with the city before we can issue this permit
Plot Plan Review Approved 06/03/2019 06/04/2019
Steve Conrick
Sidewalks
Corrective Action Required
06/03/2019

Sidewalks with dimensions must be provided on the plot plan. *Missing ADA ramp
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $935.17 $935.17 Paid 06/07/2019
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 06/07/2019
7232302-Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 06/07/2019
8331504-EFHB Middle Big Creek, Full $435.24 $435.24 Paid 06/07/2019
8331507-Sewer Connection Fee $390.00 $390.00 Paid 06/07/2019
8331401-Water Tap Fee $3,409.00 $3,409.00 Paid 06/07/2019
8350015-Water Meter Fee $408.37 $408.37 Paid 06/07/2019
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 04/21/2020
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 04/21/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 6/13/2019 (8:00) 6/13/2019 06/13/2019
Underslab Plumbing Inspection - Residential Passed 6/26/2019 6/26/2019 at 7:30 AM 06/26/2019
Sewer Service Inspection - R Passed 7/12/2019 at 2:45 PM 07/12/2019
Water Service Inspection - R Partial 7/12/2019 07/12/2019
Water Service Inspection - R Not Ready 7/15/2019 (3:30) 7/15/2019 at 3:30 PM 07/15/2019
Misc
Corrective Action Required
07/15/2019
under street bore was not done at time of inspection.
Water Service Inspection - R Passed 7/16/2019 (8:00) 7/16/2019 at 8:30 AM 07/16/2019
Misc
Corrective Action Required
07/15/2019
under street bore was not done at time of inspection.
Piers/Caissons Inspection - Residential Passed 8/13/2019 at 11:00 AM 08/13/2019
All Rough Inspection - Residential Not Ready 8/30/2019 8/30/2019 08/30/2019
Gas Service Inspection - Residential Failed 9/9/2019 9/9/2019 09/09/2019
Miscellaneous Correction
Corrective Action Required
09/09/2019
No pressure on system
Electrical Service Inspection Passed 9/9/2019 9/9/2019 09/09/2019
All Rough Inspection - Residential Failed 9/9/2019 9/9/2019 09/09/2019
Miscellaneous Correction
Corrective Action Required
09/09/2019
** Loose bottom plate bolts in garage ** **HVAC Duct work is not sealed with UL 181 tape** **Missing straps at garage door header ** ** Stud shoes needed in master bath plumbing wall** ** Draft block center of fire place framing **
Gas Service Inspection - Residential Passed 9/12/2019 9/12/2019 09/12/2019
Miscellaneous Correction
Resolved
09/12/2019
No pressure on system
All Rough Inspection - Residential Failed 9/12/2019 9/12/2019 09/12/2019
Miscellaneous Correction
Partial Correction
09/12/2019
** Loose bottom plate bolts in garage ** **HVAC Duct work is not sealed with UL 181 tape** **Missing straps at garage door header ** ** Stud shoes needed in master bath plumbing wall** ** Draft block center of fire place framing **
Miscellaneous Correction
Corrective Action Required
09/12/2019
** Loose bottom plate bolts in garage ** **HVAC Duct work is not sealed with UL 181 tape**
All Rough Inspection - Residential Failed 9/17/2019 9/17/2019 09/17/2019
Miscellaneous Correction
Partial Correction
09/12/2019
** Loose bottom plate bolts in garage ** **HVAC Duct work is not sealed with UL 181 tape** **Missing straps at garage door header ** ** Stud shoes needed in master bath plumbing wall** ** Draft block center of fire place framing **
Miscellaneous Correction
Partial Correction
09/17/2019
** Loose bottom plate bolts in garage ** **HVAC Duct work is not sealed with UL 181 tape**
M1601 DUCT CONSTRUCTION
Corrective Action Required
09/17/2019
M1601.4.1 Joints, seams and connections. Longitudinal and transverse joints, seams and connections in metallic and nonmetallic ducts shall be constructed as specified in SMACNA HVAC Duct Construction Standards—Metal and Flexible and NAIMA Fibrous Glass Duct Construction Standards. Joints, longitudinal and transverse seams, and connections in ductwork shall be securely fastened and sealed with welds, gaskets, mastics (adhesives), mastic-plus-embedded-fabric systems, liquid sealants or tapes. Tapes and mastics used to seal fibrous glass ductwork shall be listed and labeled in accordance with UL 181A and shall be marked “181A-P” for pressure-sensitive tape, “181 A-M” for mastic or “181 A-H” for heat-sensitive tape. Tapes and mastics used to seal metallic and flexible air ducts and flexible air connectors shall comply with UL 181B and shall be marked “181 B-FX” for pressure-sensitive tape or “181 BM” for mastic. Duct connections to flanges of air distribution system equipment shall be sealed and mechanically fastened. Mechanical fasteners for use with flexible nonmetallic air ducts shall comply with UL 181B and shall be marked 181B-C. Crimp joints for round metallic ducts shall have a contact lap of not less than 1 inch (25 mm) and shall be mechanically fastened by means of not less than three sheet-metal screws or rivets equally spaced around the joint. Closure systems used to seal all ductwork shall be installed in accordance with the manufacturers’ instructions. Exceptions: 1.Spray polyurethane foam shall be permitted to be applied without additional joint seals. 2.Where a duct connection is made that is partially inaccessible, three screws or rivets shall be equally spaced on the exposed portion of the joint so as to prevent a hinge effect. 3.For ducts having a static pressure classification of less than 2 inches of water column (500 Pa), additional closure systems shall not be required for continuously welded joints and seams and locking-type joints and seams of other than the snap-lock and button-lock types.
All Rough Inspection - Residential Passed 9/19/2019 9/19/2019 09/19/2019
Miscellaneous Correction
Resolved
09/19/2019
** Loose bottom plate bolts in garage ** **HVAC Duct work is not sealed with UL 181 tape** **Missing straps at garage door header ** ** Stud shoes needed in master bath plumbing wall** ** Draft block center of fire place framing **
Miscellaneous Correction
Resolved
09/19/2019
** Loose bottom plate bolts in garage ** **HVAC Duct work is not sealed with UL 181 tape**
M1601 DUCT CONSTRUCTION
Resolved
09/19/2019
M1601.4.1 Joints, seams and connections. Longitudinal and transverse joints, seams and connections in metallic and nonmetallic ducts shall be constructed as specified in SMACNA HVAC Duct Construction Standards—Metal and Flexible and NAIMA Fibrous Glass Duct Construction Standards. Joints, longitudinal and transverse seams, and connections in ductwork shall be securely fastened and sealed with welds, gaskets, mastics (adhesives), mastic-plus-embedded-fabric systems, liquid sealants or tapes. Tapes and mastics used to seal fibrous glass ductwork shall be listed and labeled in accordance with UL 181A and shall be marked “181A-P” for pressure-sensitive tape, “181 A-M” for mastic or “181 A-H” for heat-sensitive tape. Tapes and mastics used to seal metallic and flexible air ducts and flexible air connectors shall comply with UL 181B and shall be marked “181 B-FX” for pressure-sensitive tape or “181 BM” for mastic. Duct connections to flanges of air distribution system equipment shall be sealed and mechanically fastened. Mechanical fasteners for use with flexible nonmetallic air ducts shall comply with UL 181B and shall be marked 181B-C. Crimp joints for round metallic ducts shall have a contact lap of not less than 1 inch (25 mm) and shall be mechanically fastened by means of not less than three sheet-metal screws or rivets equally spaced around the joint. Closure systems used to seal all ductwork shall be installed in accordance with the manufacturers’ instructions. Exceptions: 1.Spray polyurethane foam shall be permitted to be applied without additional joint seals. 2.Where a duct connection is made that is partially inaccessible, three screws or rivets shall be equally spaced on the exposed portion of the joint so as to prevent a hinge effect. 3.For ducts having a static pressure classification of less than 2 inches of water column (500 Pa), additional closure systems shall not be required for continuously welded joints and seams and locking-type joints and seams of other than the snap-lock and button-lock types.
Driveway Inspection Partial 11/18/2019 11/18/2019 11/18/2019
Misc
Informational
11/18/2019
PRE POUR INSPECTION The forms are set and there appears to be sufficient compacted aggregate.
Sidewalk Inspection Partial 11/18/2019 11/18/2019 11/18/2019
Misc
Informational
11/18/2019
PRE POUR INSPECTION The Forms are set and there appears to be sufficient compacted aggregate.
Driveway Inspection Failed 11/25/2019 12/09/2019
Misc
Informational
11/18/2019
PRE POUR INSPECTION The forms are set and there appears to be sufficient compacted aggregate.
Misc
Corrective Action Required
12/09/2019
POST POUR INSPECTION FAILED. The driveway approach cross slope is greater than 2.0 % and is not in ADA compliance. Corrections to the driveway approach will need to be made prior to issuance of a Certificate of Occupancy.
Sidewalk Inspection Failed 11/25/2019 12/09/2019
Misc
Informational
11/18/2019
PRE POUR INSPECTION The Forms are set and there appears to be sufficient compacted aggregate.
Misc
Corrective Action Required
12/09/2019
POST POUR INSPECTION FAILED The sidewalk cross slope is greater than 2.0 % and is not in ADA compliance. Corrections to the sidewalk will need to be made prior to issuance of a Certificate of Occupancy.
Driveway Inspection Partial 4/7/2020 (P.M.) 4/7/2020 04/07/2020
Misc
Resolved
04/07/2020
PRE POUR INSPECTION The forms are set and there appears to be sufficient compacted aggregate.
Misc
Resolved
04/07/2020
POST POUR INSPECTION FAILED. The driveway approach cross slope is greater than 2.0 % and is not in ADA compliance. Corrections to the driveway approach will need to be made prior to issuance of a Certificate of Occupancy.
Misc
Informational
04/07/2020
PRE POUR INSPECTION Inspection for the section of sidewalk on the west side of the property to be replaced. The forms are set and there appears to be sufficient compacted aggregate. I will return in two days for a post pour inspection.
Driveway Inspection Passed 04/07/2020
Misc
Informational
04/07/2020
PRE POUR INSPECTION Inspection for the section of sidewalk on the west side of the property to be replaced. The forms are set and there appears to be sufficient compacted aggregate. I will return in two days for a post pour inspection.
Sidewalk Inspection Passed 4/13/2020 04/13/2020
Misc
Informational
12/09/2019
PRE POUR INSPECTION The Forms are set and there appears to be sufficient compacted aggregate.
Misc
Corrective Action Required
12/09/2019
POST POUR INSPECTION FAILED The sidewalk cross slope is greater than 2.0 % and is not in ADA compliance. Corrections to the sidewalk will need to be made prior to issuance of a Certificate of Occupancy.
Erosion Control Inspection Residential Failed 4/15/2020 at 8:20 AM 04/15/2020
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
04/15/2020
DEFICIENT EROSION CONTROL INSTALLATION. - PROVIDE SILT FENCE TILL SOD COMPLETE -
Gas Piping Inspection - Residential Passed 4/15/2020 4/15/2020 04/15/2020
Plot Plan Inspection Passed 4/15/2020 4/15/2020 04/15/2020
Occupancy Inspection - Codes Residential Failed 4/15/2020 4/15/2020 04/15/2020
Misc
Corrective Action Required
04/15/2020
- PROVIDE FINAL GRADE, SOD , SPLASH BLOCKS - - SEAL TOP OF METER CAN A/C DISCONNECT - - INSTALL A/C CONDENSOR - - INSTALL DISHWASHER - - PROVIDE HAMMER ARESTORS DISHWASHER & WASHING MACHINE - - PROVIDE 3 GFCI RECEPTACLES GARAGE - - PROVIDE GFCI PROTECTION DISHWASHER & WASHING MACHINE - - PROVIDE ANTO SIPHON DEVICE HOSE BID MAIN SHUTOFF - - SUMP PUMP & DISCHARGE 36" FROM FOUNDATION -
Occupancy Inspection - Codes Residential Temporary C of O 4/30/2020 4/30/2020 04/30/2020
Misc
Corrective Action Required
04/15/2020
- PROVIDE FINAL GRADE, SOD , SPLASH BLOCKS - - SEAL TOP OF METER CAN A/C DISCONNECT -
Occupancy Inspection - Codes Residential Full C of O 5/14/2020 05/13/2020
Misc
Resolved
05/13/2020
Documents & Images
Date Uploaded File Type Document Name
05/30/2019 Letter Codes Residential Plan Review
06/03/2019 Letter Codes Residential Plan Review
06/07/2019 Receipt Receipt for transaction: 2019-003377
06/07/2019 Letter Codes Building Permit
06/12/2019 Engineer Report/Study DOC061219-06122019083501
06/12/2019 Plot Plan DOC061219-06122019083518
06/13/2019 Letter INSPECTION SUMMARY
06/26/2019 Letter INSPECTION SUMMARY
07/12/2019 Letter INSPECTION SUMMARY
07/12/2019 Letter INSPECTION SUMMARY
07/15/2019 Letter INSPECTION SUMMARY
07/16/2019 Letter INSPECTION SUMMARY
08/13/2019 Letter INSPECTION SUMMARY
08/30/2019 Letter INSPECTION SUMMARY
09/09/2019 Letter INSPECTION SUMMARY
09/09/2019 Letter INSPECTION SUMMARY
09/09/2019 Letter INSPECTION SUMMARY
09/12/2019 Letter INSPECTION SUMMARY
09/12/2019 Letter INSPECTION SUMMARY
09/17/2019 Letter INSPECTION SUMMARY
09/19/2019 Letter INSPECTION SUMMARY
11/18/2019 Letter INSPECTION SUMMARY
11/18/2019 Letter INSPECTION SUMMARY
12/09/2019 Letter INSPECTION SUMMARY
12/09/2019 Letter INSPECTION SUMMARY
01/28/2020 Letter INSPECTION SUMMARY
01/28/2020 Letter INSPECTION SUMMARY
04/07/2020 Letter INSPECTION SUMMARY
04/07/2020 Letter INSPECTION SUMMARY
04/13/2020 Letter INSPECTION SUMMARY
04/15/2020 Letter INSPECTION SUMMARY
04/15/2020 Letter INSPECTION SUMMARY
04/15/2020 Letter INSPECTION SUMMARY
04/15/2020 Letter INSPECTION SUMMARY
04/21/2020 Receipt Receipt for transaction:2020-001633
04/30/2020 Letter Codes Temporary Certificate of Occupancy
05/13/2020 Letter Field Certificate of Occupancy
05/13/2020 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home