Summary
PRRES20190346
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT
02/19/2019
02/22/2019
10/02/2019
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
KIMBEL MECHANICAL SYSTEMS, INC, Address:1936 N SHILOH DR, Phone:(479) 756-1099  
RYAN@SUMMITHOMESKC.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Residential Plan Review Approved 02/21/2019 02/22/2019
Development Center
Plot Plan Review Approved 02/21/2019 02/21/2019
Steve Conrick
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $1,357.84 $1,357.84 Paid 02/22/2019
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 02/22/2019
8331507-Sewer Connection Fee $630.00 $630.00 Paid 02/22/2019
8331401-Water Tap Fee $3,409.00 $3,409.00 Paid 02/22/2019
8350015-Water Meter Fee $408.37 $408.37 Paid 02/22/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 3/8/2019 at 3:00 PM 03/08/2019
Footing Inspection - Residential Passed 3/29/2019 (11:30) 3/29/2019 at 12:00 PM 03/29/2019
Sewer Service Inspection - R Passed 4/16/2019 4/16/2019 at 8:46 AM 04/16/2019
Water Service Inspection - R Partial 4/16/2019 04/16/2019
Water Service Inspection - R Passed 4/16/2019 (1:00) 4/16/2019 at 1:30 PM 04/16/2019
Underslab Plumbing Inspection - Residential Passed 4/17/2019 4/17/2019 at 7:30 AM 04/17/2019
Misc
Corrective Action Required
04/17/2019
PLEASE PROVIDE ADDRESS. NO OTHER INSPECTIONS WILL BE PERFORMED WITHOUT ADDRESS POSTED.
Electrical Service Inspection Passed 6/12/2019 6/12/2019 06/12/2019
Gas Piping Inspection - Residential Passed 6/12/2019 6/12/2019 06/12/2019
Gas Service Inspection - Residential Passed 6/12/2019 6/12/2019 06/12/2019
All Rough Inspection - Residential Failed 6/12/2019 6/12/2019 06/12/2019
Misc
Corrective Action Required
06/12/2019
-Fire block dead space west wall main level at top plate where plumbing comes through -fire block west wall top plate where HVAC comes through -fire block dead space at top plate space in between garage and where oven will be -fire block dead space at top plate east side, next to garage wall -fire block both dead spaces, left and right of garage door entrance -anchor down posts in basement -complete water line under stairs in basement -solid blocking in between joists on main floor above stove/fridge area -two spots of cut floor joists in basement, needs to be fixed -fire block stair wall leading to basement at joists height -missing 2 - 2x4s at right side of stairs leading down to basement -support plumbing in garage every 4’
All Rough Inspection - Residential Partial 6/18/2019 6/18/2019 06/18/2019
Misc
Corrective Action Required
06/12/2019
-fire block dead space at top plate east side, next to garage wall -support plumbing in garage every 4’, drain line on north side of garage -ok to insulate
All Rough Inspection - Residential Passed 6/21/2019 6/21/2019 at 7:30 AM 06/21/2019
Misc
Resolved
06/21/2019
-fire block dead space at top plate east side, next to garage wall -support plumbing in garage every 4’, drain line on north side of garage -ok to insulate
Driveway Inspection Passed 7/17/2019 07/16/2019
Misc
Informational
07/11/2019
JULY 11, 2019 At time of inspection, driveway appears to be with in spec. The appropriate amount of gravel has been installed and is compacted.
Misc
Informational
07/11/2019
JULY 11, 2019 At time of inspection, driveway appears to be with in spec. The appropriate amount of gravel has been installed and is compacted.
Misc
Informational
07/11/2019
JULY 11, 2019 At time of inspection, driveway appears to be with in spec. The appropriate amount of gravel has been installed and is compacted.
Misc
Informational
07/16/2019
JULY 15, 2019 POST POUR INSPECTION Driveway is in compliance with Lee Summit spec.
Occupancy Inspection - Codes Residential Failed 8/22/2019 8/22/2019 08/22/2019
Misc
Corrective Action Required
08/22/2019
**Final stabilization is needed for the yard **Range vent hood is not installed **Take off boots on round duct in basement are not sealed ** Duct work is not completed **Splash blocks need to be installed
Occupancy Inspection - Codes Residential Failed 9/23/2019 9/23/2019 09/23/2019
Misc
Partial Correction
09/23/2019
**Final stabilization is needed for the yard **Range vent hood is not installed **Take off boots on round duct in basement are not sealed ** Duct work is not completed **Splash blocks need to be installed
Miscellaneous Correction
Corrective Action Required
09/23/2019
**Range vent hood is not installed **Splash blocks need to be installed
Occupancy Inspection - Codes Residential Full C of O 10/2/2019 10/2/2019 10/02/2019
Misc
Resolved
10/02/2019
**Final stabilization is needed for the yard **Range vent hood is not installed **Take off boots on round duct in basement are not sealed ** Duct work is not completed **Splash blocks need to be installed
Documents & Images
Date Uploaded File Type Document Name
02/19/2019 Letter Codes Residential Plan Review
02/22/2019 Receipt Receipt for transaction: 2019-000596
02/22/2019 Letter Codes Building Permit
02/25/2019 Plot Plan DOC022519-001
03/08/2019 Letter INSPECTION SUMMARY
03/29/2019 Letter INSPECTION SUMMARY
04/16/2019 Letter INSPECTION SUMMARY
04/16/2019 Letter INSPECTION SUMMARY
04/16/2019 Letter INSPECTION SUMMARY
04/17/2019 Letter INSPECTION SUMMARY
06/12/2019 Letter INSPECTION SUMMARY
06/12/2019 Letter INSPECTION SUMMARY
06/12/2019 Letter INSPECTION SUMMARY
06/12/2019 Letter INSPECTION SUMMARY
06/18/2019 Letter INSPECTION SUMMARY
06/18/2019 Letter INSPECTION SUMMARY
06/21/2019 Letter INSPECTION SUMMARY
07/11/2019 image
07/11/2019 Letter INSPECTION SUMMARY
07/11/2019 Letter INSPECTION SUMMARY
07/11/2019 image0
07/11/2019 Letter INSPECTION SUMMARY
07/16/2019 2019
07/16/2019 Letter INSPECTION SUMMARY
07/16/2019 Letter INSPECTION SUMMARY
07/16/2019 Letter INSPECTION SUMMARY
08/22/2019 Letter INSPECTION SUMMARY
09/23/2019 Letter INSPECTION SUMMARY
10/02/2019 Letter Field Certificate of Occupancy
10/02/2019 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home