Summary
PRRES20183928
Building Permit - Residential
Certificate of Occupancy
SAB CONSTRUCTION LLC
NEW SINGLE FAMILY
NEW HOUSE FINISHED AND UNFINISHED BASEMENT COVERED DECK
11/20/2018
12/07/2018
02/26/2020
Locations
Contacts
SAB CONSTRUCTION LLC, Address:PO BOX 942, Phone:(816) 524-3855  
SAB CONSTRUCTION INC, Address:PO BOX 942, Phone:(816) 524-3855  
MIKE BRYANT HEATING & COOLING , Address:1711 E 123RD , Phone:(913) 441-7807  
C-R ELECTRICAL LLC, Address:4539 RIDGEWAY, Phone:(816) 803-3500  
GARRISON PLUMBING, Address:15430 S MAHAFFIE ST STE 102, Phone:(913) 768-1311  
CURTIS@SABHOMES.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 11/26/2018 12/04/2018
Kim Brennan
Basement elevation
Corrective Action Required
11/26/2018

The Basement floor elevation and basement type (e.g. full/standard, daylight, walk-out, etc.) ***The MDP shows Lot 60 as a full. Have Matt S. submit a letter stating that you are allowed to move forward with a DL***
As-graded plot plan
Corrective Action Required
11/26/2018

A as-graded plot plan per Section 7-160, Code of Ordinances, is required prior to occupancy. ***Please add a note that says "AS-GRADED PLOT PLAN IS REQUIRED PRIOR TO SODDING"***
City infrustructure
Corrective Action Required
11/26/2018

Show all manholes, water valve boxes, fire hydrants, and stormwater structures. ***Missing a MH***
Residential Plan Review Approved 11/26/2018 11/20/2018
Brandon Kalwei
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $1,044.64 $1,044.64 Paid 12/07/2018
Right of Way Permit Fee $80.00 $80.00 Paid 12/07/2018
8331507-Sewer Connection Fee $480.00 $480.00 Paid 12/07/2018
Water Tap Fee $3,409.00 $3,409.00 Paid 12/07/2018
Water Meter Fee $408.37 $408.37 Paid 12/07/2018
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 12/18/2018 12/18/2018 at 12:45 PM 12/18/2018
Piers/Caissons Inspection - Residential Partial 12/18/2018 12/18/2018
Misc
Corrective Action Required
12/18/2018
THE OUTER PIER PADS FORMED AT FOOTING INSPECTION. THE MIDDLE PIER PAD WILL BE DONE LATER
Sewer Service Inspection - R Passed 1/8/2019 1/8/2019 01/08/2019
Water Service Inspection - R Partial 1/9/2019 (9:30) 1/9/2019 01/08/2019
Water Service Inspection - R Passed 1/9/2019 at 9:40 AM 01/09/2019
Underslab Plumbing Inspection - Residential Failed 1/11/2019 1/11/2019 at 10:15 AM 01/11/2019
Misc
Corrective Action Required
01/11/2019
-PROTECT WATER LINE THROUGH SLAB
All Rough Inspection - Residential Partial 4/2/2019 4/2/2019 at 10:05 AM 04/02/2019
Misc
Partial Correction
04/02/2019
GARAGE PORTAL NAILING INSPECTION ONLY: APPROVED
Piers/Caissons Inspection - Residential Partial 4/10/2019 (11:30) 4/10/2019 at 1:35 PM 04/10/2019
Misc
Corrective Action Required
12/18/2018
THE OUTER PIER PADS FORMED AT FOOTING INSPECTION. THE MIDDLE PIER NOT DUG
Piers/Caissons Inspection - Residential Passed 4/10/2019 at 2:35 PM 04/10/2019
Misc
Resolved
04/10/2019
THE OUTER PIER PADS FORMED AT FOOTING INSPECTION. THE MIDDLE PIER NOT DUG
Electrical Service Inspection Passed 4/29/2019 4/29/2019 04/29/2019
Gas Service Inspection - Residential Passed 4/29/2019 4/29/2019 04/29/2019
All Rough Inspection - Residential Failed 4/29/2019 4/29/2019 at 8:45 AM 04/29/2019
Misc
Partial Correction
04/02/2019
FRAMING: -Provide plan on site -Nail wall sole plate to floor throughout -Nail all exterior wall sole plates per code -Fb triangular space at stair from roof; fireplace space -Install security blocking for master bedroom exterior door -Nail double joist hanger above stair wall return air ELECTRICAL: -Electrical inside return air space above basement bathroom -At front basement bedroom closet wall more than 24” in width, install a wall receptacle as required PLUMBING: -Install straps at exterior wall top plate where bored than 50% -Slope vent in attic toward drain -Code does not allow combination waste and vent for master bathroom tub. CWV only allowed for sink/lav and floor drain -Mark radon pipe MECHANICAL: -Provide min 1” clearance from wood to b-vent inside chase -Fasten fireplace to framing -Install double wall interconnecting fitting at common vent **DO NOT INSULATE
All Rough Inspection - Residential Failed 5/1/2019 at 10:50 AM 05/01/2019
Misc
Corrective Action Required
05/01/2019
FRAMING: -Install steel column for garage I beam per plan **OK TO INSULATE
All Rough Inspection - Residential Passed 5/3/2019 5/3/2019 at 1:25 PM 05/03/2019
Misc
Resolved
05/03/2019
FRAMING: -Install steel column for garage I beam per plan **OK TO INSULATE
Underslab Plumbing Inspection - Residential Passed 05/03/2019
Misc
Resolved
05/03/2019
-PROTECT WATER LINE THROUGH SLAB
Driveway Inspection Passed 6/5/2019 (Ready Now) 6/5/2019 06/28/2019
Informational
06/06/2019
Driveway- forms and materails passed pre-inspection.
Misc
Informational
06/28/2019
Driveway passed final inspection .
Sidewalk Inspection Passed 6/5/2019 6/5/2019 06/28/2019
Misc
Informational
06/05/2019
SIDEWALK- Pre inspection of forms and materials passed.
Misc
Informational
06/28/2019
Sidewalk - passed final inspection .
Occupancy Inspection - Codes Residential Failed 9/24/2019 9/24/2019 at 8:45 AM 09/24/2019
Misc
Resolved
09/24/2019
-CHECK AT FINAL LANDSCAPING REQUIREMENT PER CITY ORDINANCE ALONG THE REAR OF LOT
Misc
Corrective Action Required
09/24/2019
-Submit as-graded plot plan -Obtain awn irrigation permit -Uncover the sewer manhole -Install sewer tracer box with wire connected -Receptacle at AC not gfci-protected -Cedar posts buried in soil -Install breaker lock for hood -Screw door embedded braces into studs
Plot Plan Inspection Passed 10/8/2019 10/08/2019
Occupancy Inspection - Codes Residential Full C of O 2/27/2020 2/26/2020 at 1:10 PM 02/26/2020
Misc
Resolved
02/26/2020
-Install sewer tracer box with wire connected -Receptacle at AC not gfci-protected -Cedar posts buried in soil -Install breaker lock for hood -Screw door embedded braces into studs
Documents & Images
Date Uploaded File Type Document Name
11/26/2018 Letter Codes Residential Plan Review
12/07/2018 Receipt Receipt for transaction: 2018-007486
12/07/2018 Letter Codes Building Permit
12/12/2018 Letter DOC121218-12122018090830
12/12/2018 Engineer Report/Study DOC121218-12122018090835
12/12/2018 Plot Plan DOC121218-12122018090850
01/08/2019 Letter INSPECTION SUMMARY
01/08/2019 Letter INSPECTION SUMMARY
04/02/2019 Letter INSPECTION SUMMARY
04/10/2019 Letter INSPECTION SUMMARY
04/10/2019 Letter INSPECTION SUMMARY
04/10/2019 Letter INSPECTION SUMMARY
04/29/2019 Letter INSPECTION SUMMARY
04/29/2019 Letter INSPECTION SUMMARY
04/29/2019 Letter INSPECTION SUMMARY
05/01/2019 Letter INSPECTION SUMMARY
05/03/2019 Letter INSPECTION SUMMARY
05/03/2019 Letter INSPECTION SUMMARY
06/06/2019 Letter DE-Daily Inspection Summary
06/06/2019 Letter INSPECTION SUMMARY
06/28/2019 Letter INSPECTION SUMMARY
06/28/2019 Letter INSPECTION SUMMARY
06/28/2019 Letter INSPECTION SUMMARY
06/28/2019 Letter INSPECTION SUMMARY
06/28/2019 Letter INSPECTION SUMMARY
09/24/2019 Letter INSPECTION SUMMARY
10/08/2019 Letter INSPECTION SUMMARY
02/27/2020 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home