Summary
PRRES20183842
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - PARTIAL FINISHED BASEMENT - COVERED DECK
11/09/2018
11/15/2018
08/01/2019
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
KIMBEL MECHANICAL SYSTEMS, INC, Address:1936 N SHILOH DR, Phone:(479) 756-1099  
RYAN@SUMMITHOMESKC.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Residential Plan Review Approved 11/13/2018 11/15/2018
Kim Brennan
21 Foundation wall thickness and height and reinforcement.
Corrective Action Required
11/09/2018

Foundation wall thickness and height and reinforcement. (IRC Section R404)
Plot Plan Review Approved 11/13/2018 11/13/2018
Steve Conrick
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $916.99 $916.99 Paid 11/15/2018
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 11/15/2018
8331507-Sewer Connection Fee $390.00 $390.00 Paid 11/15/2018
8331401-Water Tap Fee $3,409.00 $3,409.00 Paid 11/15/2018
8350015-Water Meter Fee $408.37 $408.37 Paid 11/15/2018
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Failed 1/17/2019 1/17/2019 at 1:00 PM 01/17/2019
Misc
Corrective Action Required
01/17/2019
framing not complete due to mud and water. CALL BACK IN WHEN READY.
Sewer Service Inspection - R Passed 3/7/2019 (2:00) 3/7/2019 at 3:30 PM 03/07/2019
Water Service Inspection - R Partial 3/7/2019 03/07/2019
Water Service Inspection - R Passed 3/8/2019 (9:00) 3/8/2019 at 9:30 AM 03/08/2019
Underslab Plumbing Inspection - Residential Passed 3/18/2019 3/18/2019 at 8:00 AM 03/18/2019
All Rough Inspection - Residential Failed 4/26/2019 4/26/2019 at 2:00 PM 04/26/2019
Misc
Corrective Action Required
04/26/2019
1.Install anchor at bottom plate eat wall in garage at splice. 2.Install security blocking at rear entry door. 3.Fire block vertically at north wall in rec room at corner going into west bedroom. 4. Fire block vertically at northwest bedroom in northwest corner or close to. 5.Complete vertical fire blocking at east wall in northwest bedroom in basement. OK TO INSULATE
Electrical Service Inspection Passed 4/26/2019 4/26/2019 at 3:01 PM 04/26/2019
Gas Piping Inspection - Residential Passed 4/26/2019 at 3:11 PM 04/26/2019
Gas Service Inspection - Residential Passed 4/26/2019 4/26/2019 at 3:21 PM 04/26/2019
All Rough Inspection - Residential Passed 5/1/2019 5/1/2019 at 9:30 AM 05/01/2019
Misc
Resolved
05/01/2019
1.Install anchor at bottom plate eat wall in garage at splice. 2.Install security blocking at rear entry door. 3.Fire block vertically at north wall in rec room at corner going into west bedroom. 4. Fire block vertically at northwest bedroom in northwest corner or close to. 5.Complete vertical fire blocking at east wall in northwest bedroom in basement. OK TO INSULATE
Driveway Inspection Failed 5/10/2019 5/10/2019 05/10/2019
Misc
Corrective Action Required
05/10/2019
PRE POUR INSPECTION The forms are set but there is not a sufficient amount of aggregate. The contractor is going to make corrections and call back in for inspection.
Driveway Inspection Partial 5/10/2019 05/10/2019
Misc
Corrective Action Required
05/10/2019
PRE POUR INSPECTION The forms are set but there is not a sufficient amount of aggregate. The contractor is going to make corrections and call back in for inspection.
Misc
Informational
05/10/2019
All forms are set and are within spec. 4 inches of clean gravel has been installed and gravel is compacted. Drive approach is within spec length and width.
Driveway Inspection Passed 5/20/2019 05/20/2019
Misc
Corrective Action Required
05/10/2019
PRE POUR INSPECTION The forms are set but there is not a sufficient amount of aggregate. The contractor is going to make corrections and call back in for inspection.
Misc
Informational
05/10/2019
All forms are set and are within spec. 4 inches of clean gravel has been installed and gravel is compacted. Drive approach is within spec length and width.
Misc
Informational
05/20/2019
POST INSPECTION Driveway meets all standards and spec.
Footing Inspection - Residential Passed 7/5/2019 07/05/2019
Misc
Resolved
07/05/2019
framing not complete due to mud and water. CALL BACK IN WHEN READY.
Occupancy Inspection - Codes Residential Failed 7/5/2019 7/5/2019 at 9:00 AM 07/05/2019
Misc
Corrective Action Required
07/05/2019
Install spark rings at outlets located in tile backsplash in kitchen. Install spark ring at outlet in tile in master bath. Install spark rings at outlets in tile backsplash in basement bar. Final grading. Sod Discharge sump min 36” away from foundation.
Deck Final Inspection - Residential Passed 7/5/2019 7/5/2019 07/05/2019
Occupancy Inspection - Codes Residential Failed 7/19/2019 7/19/2019 07/19/2019
Misc
Corrective Action Required
07/05/2019
Need a clean out for the sewer stub in basement by electrical panel, currently has a cap on it Connect furnace piping that is coming apart in furnace room Final grading. Sod Discharge sump min 36” away from foundation.
Plot Plan Inspection Passed 08/01/2019
Piers/Caissons Inspection - Residential Passed 08/01/2019
Occupancy Inspection - Codes Residential Full C of O 8/1/2019 8/1/2019 at 1:46 PM 08/01/2019
Misc
Resolved
08/01/2019
Need a clean out for the sewer stub in basement by electrical panel, currently has a cap on it Connect furnace piping that is coming apart in furnace room Final grading. Sod Discharge sump min 36” away from foundation.
Documents & Images
Date Uploaded File Type Document Name
11/09/2018 Letter Codes Residential Plan Review
11/15/2018 Receipt Receipt for transaction: 2018-007252
11/15/2018 Letter Codes Building Permit
11/15/2018 Plot Plan DOC111518-003
01/17/2019 Letter INSPECTION SUMMARY
03/07/2019 Letter INSPECTION SUMMARY
03/07/2019 Letter INSPECTION SUMMARY
03/08/2019 Letter INSPECTION SUMMARY
03/18/2019 Letter INSPECTION SUMMARY
04/26/2019 Letter INSPECTION SUMMARY
04/26/2019 Letter INSPECTION SUMMARY
04/26/2019 Letter INSPECTION SUMMARY
04/26/2019 Letter INSPECTION SUMMARY
05/01/2019 Letter INSPECTION SUMMARY
05/10/2019 Letter INSPECTION SUMMARY
05/10/2019 Letter INSPECTION SUMMARY
05/10/2019 Letter INSPECTION SUMMARY
05/20/2019 Letter INSPECTION SUMMARY
07/05/2019 Letter INSPECTION SUMMARY
07/05/2019 Letter INSPECTION SUMMARY
07/19/2019 Letter INSPECTION SUMMARY
08/01/2019 Letter INSPECTION SUMMARY
08/01/2019 Letter INSPECTION SUMMARY
08/01/2019 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home