Permit Application Status

PRRES20180854


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20180854
Building Permit - Residential
Certificate of Occupancy
SILVERSTONE DEVELOPMENT LLC
NEW SINGLE FAMILY
NEW HOUSE UNIFINISHED BASEMENT
03/29/2018
04/18/2018
07/18/2019
Locations
Contacts
SILVERSTONE DEVELOPMENT LLC, Address:PO BOX 346  
D AND D BUILDING INC, Address:PO BOX 7014, Phone:(816) 491-2125  
APEX HEATING & AIR CONDITIONING INC, Address:1202 NW EAGLE RIDGE BLVD, Phone:(816) 228-2739  
INTREPID ELECTRIC LLC, Address:620 S KISNER CIR, Phone:(816) 796-2781  
MILLER PLUMBING CO, Address:PO BOX 393 , Phone:(913) 851-1333  
Reviews
Review Type Outcome Est. Completion Date Completed
Residential Plan Review Approved 04/02/2018 04/04/2018
Brandon Kalwei
Plot Plan Review Approved 04/02/2018 03/30/2018
Troy Thompson
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $841.51 $841.51 Paid 04/18/2018
Right of Way Permit Fee $75.00 $75.00 Paid 04/18/2018
8331507-Sewer Connection Fee $480.00 $480.00 Paid 04/18/2018
Water Tap Fee $3,343.00 $3,343.00 Paid 04/18/2018
Water Meter Fee $431.83 $431.83 Paid 04/18/2018
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 4/24/2018 4/24/2018 at 4:40 PM 04/24/2018
Sewer Service Inspection - R Passed 5/14/2018 5/14/2018 at 12:50 PM 05/14/2018
Erosion Control Inspection Residential Failed 5/15/2018 05/15/2018
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
05/15/2018
EROSION CONTROL REQUIRED. SHALL PROVIDE MIN. 3/4" GRAVEL AT LOT ENTRANCE NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Water Service Inspection - R Failed 5/15/2018 5/15/2018 at 2:12 PM 05/15/2018
Misc
Corrective Action Required
05/14/2018
THE TAP AT THE WATER MAIN ALREADY BACKFILLED
Underslab Plumbing Inspection - Residential Passed 5/16/2018 at 9:45 AM 05/16/2018
Piers/Caissons Inspection - Residential Failed 6/21/2018 (8:00) 6/21/2018 at 9:20 AM 06/21/2018
Misc
Corrective Action Required
06/21/2018
-SHALL REMOVE ALL LOOSE DIRT FROM BOTTOM OF CORNER PIER
Erosion Control Inspection Residential Failed 6/21/2018 06/21/2018
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
05/15/2018
EROSION CONTROL REQUIRED AROUND THE PERMITER OF LOT. RESTORE EROSION CONTROL ALONG THE STREET NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Erosion Control Inspection Residential Failed 7/3/2018 07/03/2018
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
06/21/2018
EROSION CONTROL REQUIRED AROUND THE PERMITER OF LOT. RESTORE EROSION CONTROL ALONG THE STREET NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
All Rough Inspection - Residential Not Ready 7/3/2018 7/3/2018 at 8:50 AM 07/03/2018
Misc
Corrective Action Required
07/03/2018
NOT READY. SEE EROSION CONTROL.
Gas Service Inspection - Residential Partial 7/9/2018 7/9/2018 at 11:20 AM 07/09/2018
Misc
Corrective Action Required
07/09/2018
- PRESSURE TEST OK. - gas piping not bonded - will release gas service when bonding is complete
Erosion Control Inspection Residential Failed 7/9/2018 at 11:20 AM 07/09/2018
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
07/03/2018
EROSION CONTROL REQUIRED AROUND THE PERMITER OF LOT. RESTORE EROSION CONTROL ALONG THE STREET NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Piers/Caissons Inspection - Residential Passed 7/10/2018 7/10/2018 at 9:30 AM 07/10/2018
Misc
Corrective Action Required
06/21/2018
-SHALL REMOVE ALL LOOSE DIRT FROM BOTTOM OF CORNER PIER
Erosion Control Inspection Residential Failed 07/10/2018
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
07/09/2018
EROSION CONTROL REQUIRED AROUND THE PERMITER OF LOT. RESTORE EROSION CONTROL ALONG THE STREET NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. AND LOT IS CLEANED UP.
Electrical Service Inspection Passed 7/17/2018 7/17/2018 at 2:40 PM 07/17/2018
Gas Service Inspection - Residential Failed 7/17/2018 7/17/2018 at 2:20 PM 07/17/2018
Misc
Resolved
07/17/2018
Misc
Corrective Action Required
07/17/2018
- GAS LINE INE IS NOT CONNECTED AT FIRE PLACE
All Rough Inspection - Residential Failed 7/17/2018 7/17/2018 at 1:20 PM 07/17/2018
Misc
Resolved
07/17/2018
NOT READY. SEE EROSION CONTROL.
Misc
Corrective Action Required
07/17/2018
• straps at garage portal inside not nailed off completely • Missing door to patio • Missing front entry door • Cantilever floor joists under master open to exterior. siding needed under windows
Erosion Control Inspection Residential Passed 7/17/2018 at 2:30 PM 07/17/2018
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
07/17/2018
Gas Service Inspection - Residential Passed 7/25/2018 7/25/2018 07/25/2018
Misc
Resolved
07/25/2018
- GAS LINE INE IS NOT CONNECTED AT FIRE PLACE
All Rough Inspection - Residential Failed 7/25/2018 7/25/2018 at 8:50 AM 07/25/2018
Misc
Corrective Action Required
07/17/2018
AT THE BIG LVL BEAM POINT LOAD RIGHT NEXT TO THE MAIN RETURN AIR DUCT (ACROSS FROM THE STAIR), ADD FULL SUPPORT STUDS DOWN TO THE GRADE BEAM BELOW IN BASEMENT. CHECK THE PLAN **OK TO ROCK
Driveway Inspection Partial 8/27/2018 8/27/2018 08/31/2018
Informational
08/31/2018
The driveway was formed and the rock was installed and compacted, they are ready to pour.
Driveway Inspection Passed 8/31/2018 at 9:30 AM 08/31/2018
Informational
08/31/2018
The driveway has been poured and appears to be in compiance.Steve Robbins 08/31/2018 3:37 PM
Water Service Inspection - R Passed 10/18/2018
Misc
Resolved
10/18/2018
THE TAP AT THE WATER MAIN ALREADY BACKFILLED
Occupancy Inspection - Codes Residential Failed 10/18/2018 10/18/2018 at 9:45 AM 10/18/2018
Misc
Corrective Action Required
10/18/2018
-As graded plot plan required. There are some areas that do not slope properly -Seal exterior: wall penetrations, seal above meter and AC disconnect -Install splash blocks -Front door has no peep hole or side window required per security code -Provide plan on site. Need to verify structural framing -Window glazing within 24” of the rear patio door must be safety tempered glazing -Install breaker lock for oven, not AC -Solidblock between lapped joists above I beam -Anchor steel column to floor; also fasten upper end to double joist -Fasten basement smoke alarm box to joist and secure wiring within 8” of box; remove alarm cover -Provide AFCI protection for smoke alarm circuit -Install cover plate for furnace switch
Occupancy Inspection - Codes Residential Failed 11/6/2018 11/6/2018 at 7:55 AM 11/06/2018
Misc
Corrective Action Required
10/18/2018
-As graded plot plan required. There are some areas that do not slope properly -Window glazing within 24” of the rear patio door must be safety tempered glazing. APPROVABLE SAFETY FILM IS OPTION -Solidblock between lapped joists above I beam
Occupancy Inspection - Codes Residential Failed 5/30/2019 5/30/2019 05/30/2019
Misc
Corrective Action Required
11/06/2018
-As graded plot plan required. There are some areas that do not slope properly -Window glazing within 24” of the rear patio door must be safety tempered glazing. APPROVABLE SAFETY FILM IS OPTION
Plot Plan Inspection Passed 6/10/2019 06/10/2019
Occupancy Inspection - Codes Residential Not Ready 7/17/2019 07/17/2019
Misc
Corrective Action Required
05/30/2019
-Window glazing within 24” of the rear patio door must be safety tempered. NO CHANGE MADE TO GLAZING. $50 NOT READY FEE. MUST BE PAID FOR ANY OCCUPANCY.
Occupancy Inspection - Codes Residential Full C of O 7/18/2019 7/18/2019 07/18/2019
Misc
Resolved
07/18/2019
Documents & Images
Date Uploaded File Type Document Name
03/29/2018 Letter Codes Residential Plan Review
04/18/2018 Receipt Receipt for transaction: 2018-001461
04/18/2018 Letter Codes Building Permit
04/18/2018 Plot Plan DOC041818-005
04/24/2018 Letter Inspection Summary
05/14/2018 Letter Inspection Summary
05/15/2018 Letter Inspection Summary
05/16/2018 Letter Inspection Summary
06/21/2018 Letter Inspection Summary
07/03/2018 Letter Inspection Summary
07/09/2018 Letter Inspection Summary
07/09/2018 Letter Inspection Summary
07/10/2018 Letter Inspection Summary
07/17/2018 Letter Inspection Summary
07/25/2018 Letter Inspection Summary
08/31/2018 Letter DE-Daily Inspection Summary
10/18/2018 Letter Inspection Summary
11/06/2018 Letter Inspection Summary
05/30/2019 Letter INSPECTION SUMMARY
06/10/2019 Letter INSPECTION SUMMARY
07/16/2019 Letter Dreams-Design - 4720 NE Gateway Dr
07/17/2019 Letter INSPECTION SUMMARY
07/18/2019 Letter Field Certificate of Occupancy
07/18/2019 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home