PRRES20180570
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - FINISHED BASEMENT STOP WORK ORDER removed on 05/01/2018 12:00 AM by username 'Mike Copeland'.
03/09/2018
03/22/2018
11/07/2018
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
KIMBEL MECHANICAL SYSTEMS, INC, Address:1936 N SHILOH DR, Phone:(479) 756-1099  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
KIMBEL MECHANICAL SYSTEMS, INC, Address:1936 N SHILOH DR, Phone:(479) 756-1099  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 03/16/2018 03/15/2018
Troy Thompson
Residential Plan Review Approved 03/13/2018 03/15/2018
Kim Brennan
37 Provide details for any walls over 10 feet in height.
Corrective Action Required
03/09/2018

Provide details for any walls over 10 feet in height. Include stud grade, size, spacing and actual, uninterrupted height. (IRC Section 602.3.1 and Table 602.3(5) & 602.3.1) Does not specify uninterrupted height.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $979.72 $979.72 Paid 03/22/2018
9110073-Right of Way Permit Fee $75.00 $75.00 Paid 03/22/2018
8331504-EFHB Middle Big Creek, Full $535.68 $535.68 Paid 03/22/2018
8331507-Sewer Connection Fee $480.00 $480.00 Paid 03/22/2018
8331401-Water Tap Fee $3,343.00 $3,343.00 Paid 03/22/2018
8350015-Water Meter Fee $431.83 $431.83 Paid 03/22/2018
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 3/30/2018 03/30/2018
Underslab Plumbing Inspection - Residential Not Ready 4/13/2018 4/13/2018 04/13/2018
Misc
Corrective Action Required
04/13/2018
backfill provide access clean streets
Underslab Plumbing Inspection - Residential Not Ready 4/17/2018 4/17/2018 at 7:00 AM 04/17/2018
Misc
Corrective Action Required
04/13/2018
backfill provide access clean streets 2nd failed no back fill fee required
Underslab Plumbing Inspection - Residential Passed 4/19/2018 4/19/2018 at 1:00 PM 04/19/2018
Sewer Service Inspection - R Passed 4/19/2018 4/19/2018 04/19/2018
Miscellaneous Inspection Partial 5/1/2018 05/01/2018
Misc
Partial Correction
05/01/2018
STOP WORK HAS BEEN LIFTED IN ORDER TO ALLOW THE STRUCTURE TO BE CONSTRUCTED TO A POINT THAT THE HOME IS WEATHER TIGHT AND SECURED.
All Rough Inspection - Residential Failed 6/8/2018 6/8/2018 at 10:00 AM 06/08/2018
Misc
Corrective Action Required
06/08/2018
- need straps at garage portal header -nail siding at garage portal 3” oc -fire stop at fir out for duct work in garage - fire stop at heat/ac chase in great room - fire stop at both ends of fir down above windows in great room - Install cooler ties as per plan - flume at furnace needs 6” clearance from combustibles - verify length of exhaust fan duct in basement bath.
Gas Service Inspection - Residential Passed 6/8/2018 6/8/2018 at 11:15 AM 06/08/2018
Gas Piping Inspection - Residential Passed 6/8/2018 6/8/2018 at 11:10 AM 06/08/2018
Electrical Service Inspection Passed 6/8/2018 6/8/2018 at 11:05 AM 06/08/2018
All Rough Inspection - Residential Passed 6/13/2018 6/13/2018 at 11:00 AM 06/13/2018
Misc
Corrective Action Required
06/08/2018
- need straps at garage portal header -nail siding at garage portal 3” oc -fire stop at fir out for duct work in garage - fire stop at heat/ac chase in great room - fire stop at both ends of fir down above windows in great room - Install cooler ties as per plan - flume at furnace needs 6” clearance from combustibles - verify length of exhaust fan duct in basement bath.
Water Service Inspection - R Passed 6/18/2018 (1:00) 6/18/2018 at 12:45 PM 06/18/2018
Driveway Inspection Partial 6/27/2018 06/27/2018
Sidewalk Inspection Partial 6/27/2018 06/27/2018
Driveway Inspection Passed 7/5/2018 at 11:00 AM 07/05/2018
Informational
07/05/2018
Tom Chandler 07/05/2018 11:13 AM Driveway has been completed and passed final inspection.
Sidewalk Inspection Failed 7/5/2018 at 11:15 AM 07/05/2018
PW-Sidewalk does not meet ADA requirements
Corrective Action Required
07/05/2018
The sidewalk does not meet ADA guidelines. Tom Chandler 07/05/2018 11:20 AM Sidewalk that was poured on the east side of the driveway meets the ADA requirements. The ADA transition, landing and ramps do not meet ADA requirements.
Sidewalk Inspection Partial 7/13/2018 7/13/2018 at 10:10 AM 07/13/2018
PW-Sidewalk does not meet ADA requirements
Corrective Action Required
07/05/2018
The sidewalk does not meet ADA guidelines. Tom Chandler 07/05/2018 11:20 AM Sidewalk that was poured on the east side of the driveway meets the ADA requirements. The ADA transition, landing and ramps do not meet ADA requirements.
PW-Misc
Informational
07/13/2018
Brice Lawson 07/13/2018 11:23 AM The sidewalk has been formed up east of the driveway approach to the east property line. The forms are set to achieve a cross slope less than 2%. The rock has been installed and compacted.
Sidewalk Inspection Partial 8/7/2018 at 2:45 PM 08/09/2018
PW-Sidewalk does not meet ADA requirements
Partial Correction
08/09/2018
The sidewalk does not meet ADA guidelines. Tom Chandler 07/05/2018 11:20 AM Sidewalk that was poured on the east side of the driveway meets the ADA requirements. The ADA transition, landing and ramps do not meet ADA requirements.
PW-Misc
Informational
07/13/2018
Brice Lawson 07/13/2018 11:23 AM The sidewalk has been formed up east of the driveway approach to the east property line. The forms are set to achieve a cross slope less than 2%. The rock has been installed and compacted.
PW-Misc
Informational
08/09/2018
Tom Chandler 08/09/2018 8:52 PM Removed panels that did not meet ADA requirements. Inspected forms and compacted aggregate for new panels to be installed.
PW-Misc
Informational
08/27/2018
Ronald Paynter 08/27/2018 4:17 PM Pre inspection of forms, aggregate, and slope meet specs. Talked with contractor about squaring of curb on back of turning space on ADA ramp
Sidewalk Inspection Partial 8/27/2018 8/27/2018 at 3:00 PM 08/27/2018
PW-Sidewalk does not meet ADA requirements
Partial Correction
08/09/2018
The sidewalk does not meet ADA guidelines. Tom Chandler 07/05/2018 11:20 AM Sidewalk that was poured on the east side of the driveway meets the ADA requirements. The ADA transition, landing and ramps do not meet ADA requirements.
PW-Misc
Informational
08/09/2018
Brice Lawson 07/13/2018 11:23 AM The sidewalk has been formed up east of the driveway approach to the east property line. The forms are set to achieve a cross slope less than 2%. The rock has been installed and compacted.
PW-Misc
Informational
08/09/2018
Tom Chandler 08/09/2018 8:52 PM Removed panels that did not meet ADA requirements. Inspected forms and compacted aggregate for new panels to be installed.
PW-Misc
Informational
08/27/2018
Ronald Paynter 08/27/2018 4:21 PM Pre inspection of forms, aggregate, and slope meet specs. Talked with contractor about squaring off curb on back of turning space for the ADA ramp
Driveway Inspection Partial 8/27/2018 at 3:10 PM 08/27/2018
Informational
08/27/2018
Ronald Paynter 08/27/2018 4:25 PM Pre inspection of forms and aggregate meet specs
Driveway Inspection Passed 9/7/2018 at 10:25 AM 09/06/2018
Informational
09/06/2018
Ronald Paynter 09/06/2018 1:38 PM Driveway meets spec
Sidewalk Inspection Passed 9/7/2018 at 10:30 AM 09/06/2018
PW-Sidewalk does not meet ADA requirements
Partial Correction
08/27/2018
The sidewalk does not meet ADA guidelines. Tom Chandler 07/05/2018 11:20 AM Sidewalk that was poured on the east side of the driveway meets the ADA requirements. The ADA transition, landing and ramps do not meet ADA requirements.
PW-Misc
Informational
08/27/2018
Brice Lawson 07/13/2018 11:23 AM The sidewalk has been formed up east of the driveway approach to the east property line. The forms are set to achieve a cross slope less than 2%. The rock has been installed and compacted.
PW-Misc
Informational
08/27/2018
Tom Chandler 08/09/2018 8:52 PM Removed panels that did not meet ADA requirements. Inspected forms and compacted aggregate for new panels to be installed.
PW-Misc
Informational
08/27/2018
Ronald Paynter 08/27/2018 4:21 PM Pre inspection of forms, aggregate, and slope meet specs. Talked with contractor about squaring off curb on back of turning space for the ADA ramp
PW-Misc
Informational
09/06/2018
Ronald Paynter 09/06/2018 1:40 PM Sidewalk and ADA ramp meets spec
Occupancy Inspection - Codes Residential Failed 9/13/2018 9/13/2018 at 11:15 AM 09/13/2018
Misc
Corrective Action Required
09/13/2018
• missing outlet cover left of fire place • Label smokes • Hvac heat flue within 6” of combustible surface • Hot water heater flue within 6 “ of combustible surface • Final grade • Sod • Smoke alarm in utility room should be a combo • Cover for attic access in laundry rm • Cover for fluorescent light fixture in laundry rm •
Occupancy Inspection - Codes Residential Not Ready 10/17/2018 10/17/2018 at 7:45 AM 10/17/2018
Misc
Corrective Action Required
09/13/2018
locked no code doors locked •missing outlet cover left of fire place •Label smokes •Hvac heat flue within 6” of combustible surface •Hot water heater flue within 6 “ of combustible surface •Final grade •Sod •Smoke alarm in utility room should be a combo •Cover for attic access in laundry rm
Occupancy Inspection - Codes Residential Failed 10/19/2018 10/19/2018 at 2:00 PM 10/19/2018
Misc
Corrective Action Required
10/17/2018
locked no code doors locked •missing outlet cover left of fire place •Hvac heat flue within 6” of combustible surface •Hot water heater flue within 6 “ of combustible surface
Plot Plan Inspection Passed 11/7/2018 at 9:45 AM 11/07/2018
Occupancy Inspection - Codes Residential Full C of O 11/7/2018 11/7/2018 at 10:01 AM 11/07/2018
Misc
Resolved
11/07/2018
locked no code doors locked •missing outlet cover left of fire place •Hvac heat flue within 6” of combustible surface •Hot water heater flue within 6 “ of combustible surface
Documents & Images
Date Uploaded File Type Document Name
03/09/2018 Letter Codes Residential Plan Review
03/22/2018 Receipt Receipt for transaction: 2018-001058
03/22/2018 Letter Codes Building Permit
03/23/2018 Plot Plan DOC032218-019
03/30/2018 Letter Inspection Summary
04/13/2018 Letter Inspection Summary
04/17/2018 Letter Inspection Summary
04/19/2018 Letter Inspection Summary
04/19/2018 Letter Inspection Summary
04/30/2018 Letter Stop Work Order
05/01/2018 Letter Inspection Summary
06/08/2018 Letter Inspection Summary
06/13/2018 Letter Inspection Summary
06/18/2018 Letter Inspection Summary
07/05/2018 Letter DE-Daily Inspection Summary
07/13/2018 Letter DE-Daily Inspection Summary
07/16/2018 Concrete Ticket For Sidewalk In ROW
08/09/2018 Letter DE-Daily Inspection Summary
08/27/2018 Letter DE-Daily Inspection Summary
08/27/2018 Letter DE-Daily Inspection Summary
08/28/2018 DOC082818-08282018132420
09/06/2018 Letter DE-Daily Inspection Summary
09/06/2018 Letter DE-Daily Inspection Summary
09/13/2018 Letter Inspection Summary
10/17/2018 Letter Inspection Summary
10/19/2018 Letter Inspection Summary
11/07/2018 Letter Inspection Summary
11/07/2018 Letter Field Certificate of Occupancy
12/05/2018 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home