Permit Application Status

PRRES20173806


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20173806
Building Permit - Residential
Certificate of Occupancy
PARK HOMES LLC
NEW SINGLE FAMILY
NEW HOUSE FINISHED AND UNFINISHED BASMENT COVERED DECK
11/21/2017
03/06/2018
06/19/2019
Locations
Contacts
PARK HOMES LLC, Address:644 NE LAKE POINTE DR  
PARK HOMES LLC, Address:4550 WARWICK BLVD APT 1204, Phone:(816) 564-2333  
BLUE VALLEY CONSTRUCTION GROUP, LLC, Address:P O BOX 241, Phone:(816) 867-5122  
MCGRATH ELECTRIC, Address:601 E MAIN ST, Phone:(816) 726-3265  
MILLER PLUMBING CO, Address:PO BOX 393 , Phone:(913) 851-1333  
Reviews
Review Type Outcome Est. Completion Date Completed
Residential Plan Review Approved 11/23/2017 03/06/2018
Development Center
22 Beam and column locations, sizes and material.
Corrective Action Required
12/13/2017

Beam and column locations, sizes and material.
23 Location of vertical supports for beams. (point loads)
Corrective Action Required
12/13/2017

Location of vertical supports for beams. (point loads)
24 Concrete reinforcement size and spacing.
Corrective Action Required
12/13/2017

Concrete reinforcement size and spacing.
25 Concrete thickness.
Corrective Action Required
12/13/2017

Concrete thickness.
26 Concrete minimum compressive strength.
Corrective Action Required
12/13/2017

Concrete minimum compressive strength. (IRC Section 402.2)
33 Identify braced wall locations and length of braced wall panel(s).
Corrective Action Required
12/13/2017

Identify braced wall locations and length of braced wall panel(s). (IRC Section R602.10)
Plot Plan Review Approved 11/23/2017 11/27/2017
Troy Thompson
Basement opening elevations
Corrective Action Required
11/22/2017

Minimum Building Opening Elevation (MBOE) and location on structure must be provided on the plot plan.
Basement egress
Corrective Action Required
11/22/2017

Basement egress location(s) and elevation of the lowest adjacent grade must be provided on the plot plan. -Can you please double check the elevations, there are 2 different elevation shots around 825.
Spot elevations
Corrective Action Required
11/22/2017

Spot elevations and/or drainage flow arrows shall be provided throughout the lot. -Can you please provide more information (elevations/contours) the NW rear corner of the structure has a negative slope to the door egress. Needs to show the water shed at least 2% away from the structure.
As-graded plot plan
Corrective Action Required
11/22/2017

A as-graded plot plan per Section 7-160, Code of Ordinances, is required prior to occupancy. -Can you please show in a bubble "AS GRADED PLOT REQUIRED PRIOR TO SODDING"
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $887.93 $887.93 Paid 03/06/2018
Right of Way Permit Fee $75.00 $75.00 Paid 03/06/2018
8331507-Sewer Connection Fee $420.00 $420.00 Paid 03/06/2018
Water Tap Fee $3,343.00 $3,343.00 Paid 03/06/2018
Water Meter Fee $431.83 $431.83 Paid 03/06/2018
Not Ready Inspection Fee $50.00 $50.00 Paid 06/14/2019
Not Ready Inspection Fee $50.00 $50.00 Paid 06/14/2019
Not Ready Inspection Fee $50.00 $50.00 Paid 06/14/2019
Not Ready Inspection Fee $50.00 $50.00 Paid 06/14/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 5/2/2018 at 9:45 AM 05/02/2018
Underslab Plumbing Inspection - Residential Passed 6/12/2018 6/12/2018 at 10:35 AM 06/12/2018
Sewer Service Inspection - R Passed 6/20/2018 6/20/2018 at 2:25 PM 06/20/2018
Water Service Inspection - R Passed 6/21/2018 6/21/2018 at 9:55 AM 06/21/2018
Piers/Caissons Inspection - Residential Passed 8/13/2018 8/13/2018 08/13/2018
Gas Service Inspection - Residential Passed 8/13/2018 8/13/2018 at 9:00 AM 08/13/2018
Erosion Control Inspection Residential Failed 12/11/2018 12/11/2018
DCM5 ESC INSP DENIED
Corrective Action Required
12/11/2018
REQUESTED INSPECTION(S) DENIED DUE TO DEFICIENT EROSION CONTROL INSTALLATION.
Electrical Service Inspection Failed 12/11/2018 12/11/2018 12/11/2018
Misc
Corrective Action Required
12/11/2018
**INSPECTION DENIED DUE TO DEFICIENT EROSION CONTROL.
All Rough Inspection - Residential Failed 12/11/2018 12/11/2018 at 8:30 AM 12/11/2018
Misc
Corrective Action Required
12/11/2018
**INSPECTION DENIED DUE TO DEFICIENT EROSION CONTROL.
Electrical Service Inspection Failed 12/18/2018 12/18/2018 12/18/2018
Misc
Corrective Action Required
12/11/2018
-Cannot break the panel grounded bus bar. -Service not grounded to Ufer -Remove enamel at feeder EGC connection to service disconnect enclosure
All Rough Inspection - Residential Failed 12/18/2018 12/18/2018 at 1:05 PM 12/18/2018
Misc
Corrective Action Required
12/11/2018
FRAMING: -Install 2” washers for garage portal brace wall sill plates; block and nail seams -Nail corner studs per code -Brace ends of roof support lvl beam above living room from rotation -Install collar ties per code -Move roof support struts above master bathroom sink to bearing point above basement triple joist below -Toe nail all joists to wall top plates and sill plates -Install column support for I beam at rear basement bedroom closet wall per plan -Install Flashing at stoop MECHANICAL: -Secure fireplace to framing ELECTRICAL: -Provide wall receptacle spacing per code at rear basement window wall **OK TO INSULATE
Electrical Service Inspection Failed 12/31/2018 12/31/2018 12/31/2018
Misc
Corrective Action Required
12/18/2018
-Cannot break the panel grounded bus bar. -Service not grounded to Ufer -Remove enamel at feeder EGC connection to service disconnect enclosure **DEC-31-NOTHING WAS DONE. MOT READY INSPECTION FEE ASSESSED
All Rough Inspection - Residential Not Ready 12/31/2018 12/31/2018 at 9:45 AM 12/31/2018
Misc
Corrective Action Required
12/18/2018
FRAMING: -Install 2” washers for garage portal brace wall sill plates; block and nail seams -Nail corner studs per code -Brace ends of roof support lvl beam above living room from rotation -Install collar ties per code -Move roof support struts above master bathroom sink to bearing point above basement triple joist below -Toe nail all joists to wall top plates and sill plates -Install column support for I beam at rear basement bedroom closet wall per plan -Install Flashing at stoop MECHANICAL: -Secure fireplace to framing ELECTRICAL: -Provide wall receptacle spacing per code at rear basement window wall **OK TO INSULATE **DEC-31-NOTHING WAS DONE. MOT READY INSPECTION FEE ASSESSED
All Rough Inspection - Residential Failed 1/11/2019 1/11/2019 at 10:25 AM 01/11/2019
Misc
Corrective Action Required
12/31/2018
-Nail corner studs per code -Move roof support struts above master bathroom sink to bearing point above basement triple joist below **not a bearing wall
Electrical Service Inspection Failed 1/11/2019 1/11/2019 01/11/2019
Misc
Corrective Action Required
12/31/2018
-Cannot break the panel grounded bus bar. -Service not grounded to Ufer -(STEEL THAT IS CONNECTED DOES NOT HAVE 20 FEET UNDERGROUND IN SLAB, I CAN MOVE THE STEEL AND PULL IT OUT.) **DEC-31-NOTHING WAS DONE. MOT READY INSPECTION FEE ASSESSED
Electrical Service Inspection Not Ready 1/15/2019 1/15/2019 01/15/2019
Misc
Corrective Action Required
01/11/2019
-Cannot break the panel grounded bus bar. **Get back to the panel manufacturer to see if you can break the UL listing of their panel -Service not grounded to Ufer **You shall NOT drill and insert a rebar into the floor and use it to ground your service -Remove enamel at feeder EGC connection to service disconnect enclosure **Can either remove all the enamel behind the lug for direct metal-metal bonding contact or install a screw that makes min. 2 threads of metal-metal contact with the disconnect enclosure. Wood screw is NOT an approved way to bond the metal enclosure. **DEC-31-NOTHING WAS DONE. NOT READY INSPECTION FEE ASSESSED **JAN-15-NOT READY INSPECTION FEE ASSESSED. EVERY SUBSEQUENT REINSPECTION WILL BE ASSESSED A RE-INSPECTION FEE
All Rough Inspection - Residential Failed 1/15/2019 1/15/2019 at 9:55 AM 01/15/2019
Misc
Corrective Action Required
01/11/2019
-Nail corner studs per code **Code requires nailing of corner studs with 16d nails at 12" on center or equivalent nailing. Check throughout the house -Move roof support struts above master bathroom sink to bearing point above basement triple joist below **not a bearing wall **DEC-31-NOTHING WAS DONE. NOT READY INSPECTION FEE ASSESSED **JAN-15-NOT READY INSPECTION FEE ASSESSED. EVERY SUBSEQUENT REINSPECTION WILL BE ASSESSED A RE-INSPECTION FEE
All Rough Inspection - Residential Partial 1/22/2019 1/22/2019 at 2:35 PM 01/22/2019
Misc
Partial Correction
01/22/2019
Rock at own risk. Electrical service still fails
Electrical Service Inspection Failed 4/3/2019 4/3/2019 at 10:20 AM 04/03/2019
Misc
Corrective Action Required
01/15/2019
-Cannot break the panel grounded bus bar. **Get back to the panel manufacturer to see if you can break the UL listing of their panel -Service not grounded to Ufer **You shall NOT drill and insert a rebar into the floor and use it to ground your service -Remove enamel at feeder EGC connection to service disconnect enclosure **Can either remove all the enamel behind the lug for direct metal-metal bonding contact or install a screw that makes min. 2 threads of metal-metal contact with the disconnect enclosure. Wood screw is NOT an approved way to bond the metal enclosure. **DEC-31-NOTHING WAS DONE. NOT READY INSPECTION FEE ASSESSED **JAN-15-NOT READY INSPECTION FEE ASSESSED. EVERY SUBSEQUENT REINSPECTION WILL BE ASSESSED A RE-INSPECTION FEE
Electrical Service Inspection Failed 4/10/2019 4/10/2019 at 1:55 PM 04/10/2019
Misc
Corrective Action Required
04/03/2019
-Cannot break the panel grounded bus bar. **Get back to the panel manufacturer to see if you can break the UL listing of their panel -Service not grounded to Ufer **The rebar used as concrete-encased grounding electrode must be min 20 ft long located within the footing or foundation in direct contact with earth. Rebar located in the floor slab does NOT meet the code. Read NEC 250.52(a)(3). In any case, grounding connection must be accessible or buried in concrete per 250.68. -Remove enamel at feeder EGC connection to service disconnect enclosure **Can either remove all the enamel behind the lug for direct metal-metal bonding contact or install a screw that makes min. 2 threads of metal-metal contact with the disconnect enclosure. Wood screw is NOT an approved way to bond the metal enclosure. **EGC (equipment grounding conductor) **DEC-31-NOTHING WAS DONE. NOT READY INSPECTION FEE ASSESSED **JAN-15-NOT READY INSPECTION FEE ASSESSED. EVERY SUBSEQUENT REINSPECTION WILL BE ASSESSED A RE-INSPECTION FEE **APRIL-10-RE-INSPECTION FEE ASSESSED
Electrical Service Inspection Passed 4/23/2019 4/23/2019 at 8:25 AM 04/23/2019
Misc
Resolved
04/23/2019
-Cannot break the panel grounded bus bar. **Get back to the panel manufacturer to see if you can break the UL listing of their panel -Service not grounded to Ufer **The rebar used as concrete-encased grounding electrode must be min 20 ft long located within the footing or foundation in direct contact with earth. Rebar located in the floor slab does NOT meet the code. Read NEC 250.52(a)(3). In any case, grounding connection must be accessible or buried in concrete per 250.68. -Remove enamel at feeder EGC connection to service disconnect enclosure **Can either remove all the enamel behind the lug for direct metal-metal bonding contact or install a screw that makes min. 2 threads of metal-metal contact with the disconnect enclosure. Wood screw is NOT an approved way to bond the metal enclosure. **EGC (equipment grounding conductor) **DEC-31-NOTHING WAS DONE. NOT READY INSPECTION FEE ASSESSED **JAN-15-NOT READY INSPECTION FEE ASSESSED. EVERY SUBSEQUENT REINSPECTION WILL BE ASSESSED A RE-INSPECTION FEE **APRIL-10-RE-INSPECTION FEE ASSESSED
Driveway Inspection Passed 4/22/2019 4/22/2019 04/29/2019
Misc
Informational
04/29/2019
Final nspection Passed.
Sidewalk Inspection Passed 4/22/2019 4/22/2019 04/29/2019
Misc
Informational
04/29/2019
Final Inspection Passed.
All Rough Inspection - Residential Passed 4/3/2019 06/12/2019
Misc
Resolved
06/11/2019
Rock at own risk. Electrical service still fails
Occupancy Inspection - Codes Residential Failed 6/12/2019 6/12/2019 at 10:25 AM 06/12/2019
Corrective Action Required
06/12/2019
**DEC-31-NOTHING WAS DONE. NOT READY INSPECTION FEE ASSESSED **JAN-15-RE-INSPECTION FEE ASSESSED. **APRIL-10-RE-INSPECTION FEE ASSESSED -This lot requires as-graded plot plan prior to sodding. -Roof drainage system, splashblocks -Lawn irrigation permit is required -Raise water meter to final grade level. Make sure the meter-lid distance is per city standrard (14"-18") -Sewer tracer box and wire must be installed at grade level -Seal exterior wall oenetrations; seal exterior lights -Install receptacle near AC -Front entry luminaire not security-compliant. Luminaire shall be such that the bulb cannot be removed without the use of tool -Fasten support brackets to deck posts -Lag deck ledger board through spacers -Complete under-deck gas line to outdoor appliance -Deck stair, landing, and handrail not completed -Self closing garage door -Complete house plumbing throughout -Install bedroom ceiling light -Complete electrical and install oven -Open can light not allowed in clothes closets -Install guardrail spindles; install handrail to basement -Install light bulbs in basement -Cover unfinished basement insulation or remove paper facing -Secure water service line at mid-wall height; install water pressure reducer; -Complete installing water heater -Provide a breaker lock for out-of-sight water heater -Install security strike plate for exterior doors; screw the embedded brace into studs -Complete electrical to wet bar refrigerator -Install panel cover; label breakers; install afci breakers for circuits serving bedrooms -Grounding connection to ufer must be accessible
Plot Plan Inspection Passed 6/14/2019 06/14/2019
Erosion Control Inspection Residential Passed 06/14/2019
DCM5 ESC INSP DENIED
Resolved
06/12/2019
REQUESTED INSPECTION(S) DENIED DUE TO DEFICIENT EROSION CONTROL INSTALLATION.
Occupancy Inspection - Codes Residential Temporary C of O 6/17/2019 6/17/2019 at 2:20 PM 06/14/2019
Misc
Corrective Action Required
06/14/2019
-4 Re-inspection fees payment due -Splashblocks -Locate the sewer tracer wire and install the sewer tracer box at grade level -Front entry luminaire not security-compliant. Luminaire shall be such that the bulb cannot be removed without the use of tool -Lag deck ledger board through spacers. The lag screws must go through the ledger board and spacers into the band rim board -Deck stair, landing, and handrail not completed -Extend the kitchen island loop vent above the sink bottom -Install breaker lock for the oven -Install single plug receptacle for the humidifier -Install security strike plate for exterior doors; screw the embedded brace into studs
Occupancy Inspection - Codes Residential Full C of O 6/19/2019 6/19/2019 at 10:10 AM 06/19/2019
Misc
Resolved
06/19/2019
-Locate the sewer tracer wire and install the sewer tracer box at grade level -Front entry luminaire not security-compliant. Luminaire shall be such that the bulb cannot be removed without the use of tool -Lag deck ledger board through spacers. The lag screws must go through the ledger board and spacers into the band rim board -Deck stair, landing, and handrail not completed -Extend the kitchen island loop vent above the sink bottom -Install breaker lock for the oven -Install single plug receptacle for the humidifier -Install security strike plate for exterior doors; screw the embedded brace into studs
Documents & Images
Date Uploaded File Type Document Name
11/22/2017 Letter Codes Residential Plan Review
12/13/2017 Letter Codes Residential Plan Review
03/06/2018 Receipt Receipt for transaction: 2018-000806
03/06/2018 Letter Codes Building Permit
03/09/2018 Plot Plan DOC030818-019
05/02/2018 Letter Inspection Summary
06/12/2018 Letter Inspection Summary
06/20/2018 Letter Inspection Summary
06/21/2018 Letter Inspection Summary
08/13/2018 Letter Inspection Summary
12/11/2018 Letter INSPECTION SUMMARY
04/03/2019 Letter INSPECTION SUMMARY
04/10/2019 Letter INSPECTION SUMMARY
04/23/2019 Letter INSPECTION SUMMARY
04/29/2019 Letter INSPECTION SUMMARY
04/29/2019 Letter INSPECTION SUMMARY
06/12/2019 Letter INSPECTION SUMMARY
06/12/2019 Letter INSPECTION SUMMARY
06/14/2019 Letter INSPECTION SUMMARY
06/14/2019 Letter INSPECTION SUMMARY
06/14/2019 Letter Codes Temporary Certificate of Occupancy
06/14/2019 Receipt Receipt for transaction: 2019-003711
06/19/2019 Letter Codes Final Certificate of Occupancy
06/19/2019 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents