Summary
PRPWFC20150938
Public Works Infrastructure Permit - Commercial
Final Acceptance
CITY OF LEES SUMMIT
DEVELOPMENT COMPLETE
Hangar R FDP
05/01/2015
05/07/2015
04/08/2016
Locations
Contacts
Not shown for privacy reasons.
Not shown for privacy reasons.
CITY OF LEES SUMMIT, Address:PO BOX 1600  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
91100C9-Water Insp Fee $91.50 $91.50 Paid 05/01/2015
9110072-Water Test Fee $200.00 $200.00 Paid 05/01/2015
9110081-Paved Surface Inspection Fee $754.20 $754.20 Paid 05/01/2015
9110071-Site Grading Fee $123.90 $123.90 Paid 05/01/2015
Outstanding Fees Amount Paid Owing Date Paid


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Hydrant Inspection Passed 7/21/2015 at 12:00 AM 07/22/2015
Fire Line - Flush Passed 10/14/2015
Water Line - Construction Inspection Passed 10/14/2015
Erosion Control Inspection Partial 10/14/2015
Sanitary Sewer Construction Inspection Passed 10/14/2015
Storm Sewer Construction Inspection Passed 10/14/2015
ESC - (Vegetation/Ground Cover) Passed 04/08/2016
Erosion Control Inspection Passed 04/08/2016
Documents & Images
Date Uploaded File Type Document Name
05/01/2015 Receipt Receipt for transaction: 2015-000735
07/15/2015 Letter PW-Permit
09/10/2015 HANGAR R
10/14/2015 Letter PW-Certificate of Substantial Completion Multiple Lot
10/14/2015 Letter PW-Punch List
10/14/2015 Hangar R Certificate of Substantial Completion
10/14/2015 Hangar R Punch List
04/08/2016 Letter PW-Final Acceptance Commercial
04/08/2016 Hangar R Final
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home