Permit Application Status

PRLD20230737


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRLD20230737
Land Disturbance Permit
Issued
ORR STREET LOFTS LLC
Land Disturbance
DISCOVERY PARK LAND DISTURBANCE LAND DISTURBANCE WORK BEING COMPLETED UNDER THE MASS GRADING PERMIT - Mike Weisenborn 01/22/2024 9:04 AM
02/21/2023
Locations
Contacts
ORR STREET LOFTS LLC, Address:4240 PHILIPS FARM ROAD #109  
DISCOVERY PARK LEES SUMMIT LLC, Address:4220 PHILIPS FARM RD  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review - Land Approved 03/27/2023 03/20/2023
Gene Williams, P.E.
ESC Application and Plan Review Corrections 03/09/2023 03/02/2023
Gene Williams, P.E.
ESC Application and Plan Review Corrections 03/09/2023 03/02/2023
Gene Williams, P.E.
ESC Application and Plan Review Corrections 03/01/2023 03/02/2023
Gene Williams, P.E.
Miscellaneous Correction
Corrective Action Required
03/02/2023

A Stormwater Pollution Prevention Plan (SWPPP) shall be submitted and approved prior to approval of the Land Disturbance Plans.
Fees
Paid Fees Amount Paid Owing Date Paid
9110071-Land Disturbance Fee $1,400.00 $1,400.00 Paid 02/24/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Pending
Misc
Informational
04/18/2025
10-24-24 DP. Advanced Excavation is onsite still grinding rock south of Colbern Rd. They still have water hoses up on the grinders for dust control 11-20-24 DP. Advanced Excavation is still in that area just grinding rock. They have water hoses ran to the conveyers and are attempting to limit dust pollution. 4-18-25 DP. Rock grinding has been completed and this site is not currently active.
Erosion Control Inspection Failed 3/30/2023 3/30/2023 03/30/2023
Miscellaneous Correction
Corrective Action Required
03/30/2023
3-30-23 DP. Trees were being removed while disturbing the land. Erosion control is not in place and must be in place ASAP. No machine work is to be done until silt fence around the perimeter is in place and once trees are removed, remaining silt fence throughout the property will need to be installed before moving forward. You can continue to cut trees down with a chainsaw but needs to have a minimum of 3' of stump sticking up from grade. Everyone has been aware and I have had communication with the Foreman for Phillips Hardy, Thomas Hackler. I will need to approve the silt fence before resuming with machine work and site disturbance. - Devon Perry.
Erosion Control Inspection Partial 3/31/2023 3/31/2023 03/31/2023
Miscellaneous Correction
Corrective Action Required
03/30/2023
3-30-23 DP. Trees were being removed while disturbing the land. Erosion control is not in place and must be in place ASAP. No machine work is to be done until silt fence around the perimeter is in place and once trees are removed, remaining silt fence throughout the property will need to be installed before moving forward. You can continue to cut trees down with a chainsaw but needs to have a minimum of 3' of stump sticking up from grade. Everyone has been aware and I have had communication with the Foreman for Phillips Hardy, Thomas Hackler. I will need to approve the silt fence before resuming with machine work and site disturbance. - Devon Perry.
Misc
Informational
03/31/2023
3-31-23 DP. Crew started installing silt fence today on south lot
Site Visit Partial 4/6/2023 4/6/2023 04/06/2023
Misc
Informational
04/06/2023
4-6-23 DP. Crew is continuing to grind trees to mulch, and we talked about concerns where rock ditch checks are located and also where the construction entrance is located.
Erosion Control Inspection Partial 4/6/2023 4/6/2023 04/06/2023
Miscellaneous Correction
Corrective Action Required
03/31/2023
3-30-23 DP. Trees were being removed while disturbing the land. Erosion control is not in place and must be in place ASAP. No machine work is to be done until silt fence around the perimeter is in place and once trees are removed, remaining silt fence throughout the property will need to be installed before moving forward. You can continue to cut trees down with a chainsaw but needs to have a minimum of 3' of stump sticking up from grade. Everyone has been aware and I have had communication with the Foreman for Phillips Hardy, Thomas Hackler. I will need to approve the silt fence before resuming with machine work and site disturbance. - Devon Perry.
Misc
Informational
03/31/2023
3-31-23 DP. Crew started installing silt fence today on south lot 4-6-23 DP. Crew has most silt fence installed on south side of Colburn, they will install the rest once tree spoils are moved. They are currently working to install around property on north side of Colburn. I talked to Tom and his PM today about the construction fence that needs to be installed as a buffer barrier around the creeks. They are suppose to be working on it ASAP.
Site Visit Partial 4/18/2023 4/18/2023 04/18/2023
Misc
Informational
04/06/2023
4-6-23 DP. Crew is continuing to grind trees to mulch, and we talked about concerns where rock ditch checks are located and also where the construction entrance is located. 4-18-23 DP. Crew is still mulching trees on north and south side of Colburn.
Site Visit Partial 4/21/2023 4/21/2023 04/21/2023
Misc
Informational
04/18/2023
4-6-23 DP. Crew is continuing to grind trees to mulch, and we talked about concerns where rock ditch checks are located and also where the construction entrance is located. 4-18-23 DP. Crew is still mulching trees on north and south side of Colburn. 4-21-23 DP. Crew finished up removing trees except for the protected area, they will still have mulching to do, but is currently broke down.
Erosion Control Inspection Partial 5/2/2023 5/2/2023 05/02/2023
Miscellaneous Correction
Corrective Action Required
04/06/2023
3-30-23 DP. Trees were being removed while disturbing the land. Erosion control is not in place and must be in place ASAP. No machine work is to be done until silt fence around the perimeter is in place and once trees are removed, remaining silt fence throughout the property will need to be installed before moving forward. You can continue to cut trees down with a chainsaw but needs to have a minimum of 3' of stump sticking up from grade. Everyone has been aware and I have had communication with the Foreman for Phillips Hardy, Thomas Hackler. I will need to approve the silt fence before resuming with machine work and site disturbance. - Devon Perry.
Misc
Informational
04/06/2023
3-31-23 DP. Crew started installing silt fence today on south lot 4-6-23 DP. Crew has most silt fence installed on south side of Colburn, they will install the rest once tree spoils are moved. They are currently working to install around property on north side of Colburn. I talked to Tom and his PM today about the construction fence that needs to be installed as a buffer barrier around the creeks. They are suppose to be working on it ASAP. 5-2-23 DP. Silt Fence has continued to be installed and is currently in good working condition. However, the "buffer" construction fence that was required still has not been installed
Erosion Control Inspection Partial 6/5/2023 6/5/2023 06/06/2023
Miscellaneous Correction
Corrective Action Required
05/02/2023
3-30-23 DP. Trees were being removed while disturbing the land. Erosion control is not in place and must be in place ASAP. No machine work is to be done until silt fence around the perimeter is in place and once trees are removed, remaining silt fence throughout the property will need to be installed before moving forward. You can continue to cut trees down with a chainsaw but needs to have a minimum of 3' of stump sticking up from grade. Everyone has been aware and I have had communication with the Foreman for Phillips Hardy, Thomas Hackler. I will need to approve the silt fence before resuming with machine work and site disturbance. - Devon Perry.
Misc
Informational
05/02/2023
3-31-23 DP. Crew started installing silt fence today on south lot 4-6-23 DP. Crew has most silt fence installed on south side of Colburn, they will install the rest once tree spoils are moved. They are currently working to install around property on north side of Colburn. I talked to Tom and his PM today about the construction fence that needs to be installed as a buffer barrier around the creeks. They are suppose to be working on it ASAP. 5-2-23 DP. Silt Fence has continued to be installed and is currently in good working condition. However, the "buffer" construction fence that was required still has not been installed 6-6-23 DP. Currently no ESC issues. Clearing work is down, the "buffer" construction fence was never installed.
Erosion Control Inspection Passed 7/28/2023 7/28/2023 07/28/2023
Miscellaneous Correction
Corrective Action Required
06/06/2023
3-30-23 DP. Trees were being removed while disturbing the land. Erosion control is not in place and must be in place ASAP. No machine work is to be done until silt fence around the perimeter is in place and once trees are removed, remaining silt fence throughout the property will need to be installed before moving forward. You can continue to cut trees down with a chainsaw but needs to have a minimum of 3' of stump sticking up from grade. Everyone has been aware and I have had communication with the Foreman for Phillips Hardy, Thomas Hackler. I will need to approve the silt fence before resuming with machine work and site disturbance. - Devon Perry.
Misc
Informational
06/06/2023
3-31-23 DP. Crew started installing silt fence today on south lot 4-6-23 DP. Crew has most silt fence installed on south side of Colburn, they will install the rest once tree spoils are moved. They are currently working to install around property on north side of Colburn. I talked to Tom and his PM today about the construction fence that needs to be installed as a buffer barrier around the creeks. They are suppose to be working on it ASAP. 5-2-23 DP. Silt Fence has continued to be installed and is currently in good working condition. However, the "buffer" construction fence that was required still has not been installed 6-6-23 DP. Currently no ESC issues. Clearing work is down, the "buffer" construction fence was never installed. 7-28-23 DP. There has been no site work since May. ESC is still currently in good working order. Vegetation has also taken off very well, with no erosion problems as of now.
Site Visit Partial 10/24/2023 10/24/2023 10/24/2023
Misc
Informational
04/21/2023
4-6-23 DP. Crew is continuing to grind trees to mulch, and we talked about concerns where rock ditch checks are located and also where the construction entrance is located. 4-18-23 DP. Crew is still mulching trees on north and south side of Colburn. 4-21-23 DP. Crew finished up removing trees except for the protected area, they will still have mulching to do, but is currently broke down.
Misc
Informational
10/24/2023
10-24-23 James (super) with ESS is on site cutting dirt for their new construction entrance and also removing trees from the water way on the North side of Colburn.
Site Visit Partial 10/25/2023 10/25/2023 10/25/2023
Misc
Informational
10/24/2023
4-6-23 DP. Crew is continuing to grind trees to mulch, and we talked about concerns where rock ditch checks are located and also where the construction entrance is located. 4-18-23 DP. Crew is still mulching trees on north and south side of Colburn. 4-21-23 DP. Crew finished up removing trees except for the protected area, they will still have mulching to do, but is currently broke down.
Misc
Informational
10/24/2023
10-24-23 DP. James (super) with ESS is on site cutting dirt for their new construction entrance and also removing trees from the water way on the North side of Colburn. 10-25-23 DP. ESS is on site today. They are still working on removing the trees along the water way. It looks like they are also done with the dirt work that will allow them to move their construction entrance to a better location.
Erosion Control Inspection Partial 10/17/2024 10/17/2024 10/18/2024
Misc
Informational
10/18/2024
10-17-24 DP. Advanced Excavation is onsite and breaking and grinding rock on the South side of Colburn Rd. I was called by Kara with PW about rock dust control. They have a hydrant meter onsite and ran a second hose to help control the dusk. Yesterday afternoon I got a call from Joe with PW about more dust complaints. Norm with AE said they would have a water truck onsite today to water down the areas truck are driving.
Erosion Control Inspection Partial 10/21/2024 10/21/2024 10/21/2024
Misc
Informational
10/18/2024
10-17-24 DP. Advanced Excavation is onsite and breaking and grinding rock on the South side of Colburn Rd. I was called by Kara with PW about rock dust control. They have a hydrant meter onsite and ran a second hose to help control the dusk. Yesterday afternoon I got a call from Joe with PW about more dust complaints. Norm with AE said they would have a water truck onsite today to water down the areas truck are driving. 10-21-24 DP. Norm with AE was is onsite, him and his crew are just crushing rock. They have 7 hoses ran for dust control.
Erosion Control Inspection Partial 10/24/2024 10/24/2024 10/24/2024
Misc
Informational
10/24/2024
10-24-24 DP. Advanced Excavation is onsite still grinding rock south of Colbern Rd. They still have water hoses up on the grinders for dust control
Erosion Control Inspection Partial 11/20/2024 11/20/2024 11/20/2024
Misc
Informational
10/24/2024
10-24-24 DP. Advanced Excavation is onsite still grinding rock south of Colbern Rd. They still have water hoses up on the grinders for dust control 11-20-24 DP. Advanced Excavation is still in that area just grinding rock. They have water hoses ran to the conveyers and are attempting to limit dust pollution.
Erosion Control Inspection Partial 4/18/2025 4/18/2025 04/18/2025
Misc
Informational
11/20/2024
10-24-24 DP. Advanced Excavation is onsite still grinding rock south of Colbern Rd. They still have water hoses up on the grinders for dust control 11-20-24 DP. Advanced Excavation is still in that area just grinding rock. They have water hoses ran to the conveyers and are attempting to limit dust pollution. 4-18-25 DP. Rock grinding has been completed and this site is not currently active.
Documents & Images
Date Uploaded File Type Document Name
02/23/2023 23-02-21_Discovery_Park_Site_Disturbance_Application
02/23/2023 23-02-21_Discovery_Park_Site_Disturbance_Cost_Estimate
02/23/2023 23-02-21_Discovery_Park_Site_Disturbance_Plans
02/24/2023 Receipt Receipt for transaction:2023-001070
03/17/2023 23-03-17_Discovery_Park_SWPPP
03/17/2023 23-03-17_MORA23630_Discovery_Park_Zone_1-4
03/20/2023 APPROVED PLAN STAMPED
03/30/2023 Letter INSPECTION SUMMARY
03/31/2023 Letter INSPECTION SUMMARY
04/06/2023 Letter INSPECTION SUMMARY
04/06/2023 Letter INSPECTION SUMMARY
04/18/2023 Letter INSPECTION SUMMARY
04/21/2023 Letter INSPECTION SUMMARY
05/02/2023 Letter INSPECTION SUMMARY
06/06/2023 Letter INSPECTION SUMMARY
06/06/2023 Letter INSPECTION SUMMARY
07/28/2023 Letter INSPECTION SUMMARY
10/24/2023 Letter INSPECTION SUMMARY
10/25/2023 Letter INSPECTION SUMMARY
10/18/2024 Letter INSPECTION SUMMARY
10/21/2024 Letter INSPECTION SUMMARY
10/24/2024 Letter INSPECTION SUMMARY
11/20/2024 Letter INSPECTION SUMMARY
04/18/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home