| Review Type |
Outcome |
Est. Completion Date |
Completed |
|
ESC Application and Plan Review
|
No Comments
|
02/23/2022
|
02/23/2022
|
|
|
Loic Nguinguiri, E.I.
|
|
|
Miscellaneous Correction
Corrective Action Required
Though conducting an oil/gas well presence survey is acceptable, please refer to or use an accredited source instead such as the Missouri DNR geological survey database or the Edward Alton May’s 1995 environmental study. Make sure to also revise the information shown on sheet LD2.0.
|
|
|
Miscellaneous Correction
Corrective Action Required
On sheet LD2.0, revise the information shown to state whether the proposed method and process of tree clearing involve stump grinding or stump removal.
|
|
|
Miscellaneous Correction
Corrective Action Required
As shown in the ESC-03 detail, J-hooks are required within the ESC plan. Given the silt fence 100’ maximum runs for J-hooks, please locate the needed J-hooks on sheet LD4.0.
|
|
|
Miscellaneous Correction
Corrective Action Required
|
|
|
|
|
ESC Application and Plan Review
|
Corrections
|
02/14/2022
|
02/11/2022
|
|
|
Loic Nguinguiri, E.I.
|
|
|
Miscellaneous Correction
Corrective Action Required
Dena Mezger is an out of date contact for Public Works. Please delete the City’s ATTN names shown. Names aren’t needed for the City’s contact info.
|
|
|
Miscellaneous Correction
Corrective Action Required
Revise the contact information for the City’s Water and Wastewater services to 1200 SE Hamblen Road, Lee's Summit, MO 64081 - 816.969.1900. Revise the contact information for the City’s Police department to 10 NE Tudor Road, Lee's Summit, MO 64086 - 816.969.1700. Contact information for the Public Works director is also not needed.
|
|
|
Miscellaneous Correction
Corrective Action Required
Include a FEMA National Flood Hazard information note.
|
|
|
Miscellaneous Correction
Corrective Action Required
Show location of all oil/gas wells, or indicate none are present, and cite the source.
|
|
|
Miscellaneous Correction
Corrective Action Required
Include a note stating that “The contractor shall contact the City’s Development Services Engineering Inspection to schedule a pre-construction meeting with an inspector prior to any land disturbance work at (816) 969-1200”.
|
|
|
Miscellaneous Correction
Corrective Action Required
Revise general note 6 and ESC note 12 to (firstly) mention that “all construction shall conform to the City of Lee’s Summit’s Design and Construction manual”.
|
|
|
Miscellaneous Correction
Corrective Action Required
Revise “City Engineer” in ESC note 13 to “City’s field engineering inspector”.
|
|
|
Miscellaneous Correction
Corrective Action Required
Include general note(s) regarding the method and process of tree clearing.
|
|
|
Miscellaneous Correction
Corrective Action Required
Include diversion berm in the legend, shown on sheet LD4.0.
|
|
|
Miscellaneous Correction
Corrective Action Required
Add ESC measure, such as silt fence barrier, along the northern and southern open areas located along the perimeter of the disturbance area, on sheet LD4.0.
|
|
|
Miscellaneous Correction
Corrective Action Required
Make sure to revise the sheet(s) references shown in note A3.
|
|
|
Miscellaneous Correction
Corrective Action Required
Revise the description for seeding in the legend, on sheet LD4.2.
|
|
|
Miscellaneous Correction
Corrective Action Required
Include/discuss within the ESC staging chart, how and when the two (2) sediment traps would be converted to permanent detention basins.
|
|
|
Miscellaneous Correction
Corrective Action Required
Please acknowledge that the current LD set of plans was looked at for ESC purposes only.
|
|
|
Miscellaneous Correction
Corrective Action Required
Please clarify the short and long term scope(s) of work for Summit Innovation - Phase 2. Additional plans may be required prior to moving outside of the boundary.
|
|
|
|
|
Licensed Contractors
|
Approved
|
02/07/2022
|
02/07/2022
|
|
|
Mike Weisenborn
|
|
|
|