Permit Application Status

PRCOMCOM20243640


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOMCOM20243640
Building Permit - Commercial
Certificate of Occupancy
CHANGE OF TENANT
SERENITEA BOUTIQUE - CHANGE OF TENANT FOOD AND DRINK BOUTIQUE
07/16/2024
09/05/2024
02/04/2025
02/07/2025
Locations
Contacts
JOHN JARVIS, Address:11420 PUTNAM, Phone:(816) 200-3118  
MORGAN JACOBS, Address:11420 PUTNAM ST  
A REAL GEOTHERMAL GROUND SOURCE , Address:2110 LYNN RD   
MORNING STAR INDUSTRIES, Address:16905 E COGAN RD, Phone:(816) 985-7091  
Energy Tech Solutions, LLC, Address:605 SW US HWY 40, Phone:(816) 787-3500  
COLLINS WEBB ARCHITECTURE LLC, Address:307 SW MARKET ST, Unit B, Phone:(816) 249-2270  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 08/15/2024 08/30/2024
Joe Frogge
LC - General Contractor
Resolved
08/09/2024

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and the name, email address & phone number for the on-site contact.
LC - MEP Subs
Resolved
08/30/2024

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 8/9/2024 - A Real Geothermal is not licensed with us.
Fire Plan Review Approved 08/15/2024 08/15/2024
Craig Hill
Building Plan Review Approved with Conditions 08/15/2024 08/12/2024
Joe Frogge
Health Dept Review
Resolved
08/12/2024

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 797-7162. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is informational. 8/9/2024 - Acknowledged in letter.
Health Dept Inspection
Corrective Action Required
08/08/2024

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 797-7162. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is informational. 8/9/2024 - Acknowledged in letter.
IBC 1109.2 Toilet and bathing facilities - accessibility
Resolved
08/09/2024

2018 IBC 1109.2 Toilet and bathing facilities. Each toilet room and bathing room shall be accessible. Where a floor level is not required to be connected by an accessible route, the only toilet rooms or bathing rooms provided within the facility shall not be located on the inaccessible floor. Except as provided for in Sections 1109.2.2 and 1109.2.3, at least one of each type of fixture, element, control or dispenser in each accessible toilet room and bathing room shall be accessible. (See code section for possible exceptions.) Action required: In situations where there is an existing restroom that satisfies fixture count requirements for the occupancy we require that you bring the restroom up to as accessible as practical. While we won't require that you expand the size of the restroom, we do require that the door be compliant, the fixtures are at the min/max heights, faucets have appropriate hardware, and compliant grab bars be provided, etc.
ICC A117.1 404.2.3.2 Swinging Doors Maneuvering Clearance
Resolved
08/09/2024

ICC A117.1 Section 404.2.3.2 Swinging Doors and gates. Swinging doors and gates shall have maneuvering clearances complying with Table 404.2.3.2. Action required: Provide at least 18" clearance at latch side of door 103 into restroom.
IMC 507.3 Type II hoods where required
Resolved
08/09/2024

2018 IMC 507.3 Type II hoods. Type II hoods shall be installed above dishwashers and appliances that produce heat or moisture and do not produce grease or smoke as a result of the cooking process, except where the heat and moisture loads from such appliances are incorporated into the HVAC system design or into the design of a separate removal system. (see code section for more specific requirements) Action required: Provide Type II hoods over dishwasher and oven(s) or provide verification that they are listed ventless appliances and that MEP engineer's design compensates for the added heat and moisture.
IBC 1209.2 Finish materials
Resolved
08/09/2024

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) Action required: Specify compliant wall finish materials at mop sink. If paint is used it must be epoxy based. (also applicable at water closet if the wall surfaces become part of scope of work - some patching assumed given that additional grab bars will have to be installed)
IPC 802.1 Indirect/special waste
Corrective Action Required
08/08/2024

2018 IPC 802.1 Where required. Food-handling equipment, in other than dwelling units, clear-water waste, humidifiers, dish-washing machines and utensils, pots, pans and dishwashing sinks shall discharge though an indirect waste pipe as specified in Sections 802.1.1 through 802.1.8. Fixtures not required to be indirectly connected by this section and the exception to Section 301.6 shall be directly connected to the plumbing system in accordance with Chapter 7. Action required: Indirect connections required at 3-compartment sink. To be field verified.
Health Department Review Approved 08/12/2024
Joe Frogge
Fire Plan Review Approved 07/26/2024 07/29/2024
Craig Hill
Posting of occupant load
Corrective Action Required
07/29/2024

2018 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent.
Portable fire extinguishers - general
Corrective Action Required
07/29/2024

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Portable fire extinguishers - conspicuous locations
Corrective Action Required
07/29/2024

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel.
Building Plan Review Rejected 07/26/2024 07/22/2024
Joe Frogge
Health Dept Review
Corrective Action Required
07/22/2024

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 797-7162. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is informational.
Health Dept Inspection
Corrective Action Required
07/22/2024

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 797-7162. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is informational.
IBC 1109.2 Toilet and bathing facilities - accessibility
Corrective Action Required
07/22/2024

2018 IBC 1109.2 Toilet and bathing facilities. Each toilet room and bathing room shall be accessible. Where a floor level is not required to be connected by an accessible route, the only toilet rooms or bathing rooms provided within the facility shall not be located on the inaccessible floor. Except as provided for in Sections 1109.2.2 and 1109.2.3, at least one of each type of fixture, element, control or dispenser in each accessible toilet room and bathing room shall be accessible. (See code section for possible exceptions.) Action required: In situations where there is an existing restroom that satisfies fixture count requirements for the occupancy we require that you bring the restroom up to as accessible as practical. While we won't require that you expand the size of the restroom, we do require that the door be compliant, the fixtures are at the min/max heights, faucets have appropriate hardware, and compliant grab bars be provided, etc.
ICC A117.1 404.2.3.2 Swinging Doors Maneuvering Clearance
Corrective Action Required
07/22/2024

ICC A117.1 Section 404.2.3.2 Swinging Doors and gates. Swinging doors and gates shall have maneuvering clearances complying with Table 404.2.3.2. Action required: Provide at least 18" clearance at latch side of door 103 into restroom.
IMC 507.3 Type II hoods where required
Corrective Action Required
07/22/2024

2018 IMC 507.3 Type II hoods. Type II hoods shall be installed above dishwashers and appliances that produce heat or moisture and do not produce grease or smoke as a result of the cooking process, except where the heat and moisture loads from such appliances are incorporated into the HVAC system design or into the design of a separate removal system. (see code section for more specific requirements) Action required: Provide Type II hoods over dishwasher and oven(s) or provide verification that they are listed ventless appliances and that MEP engineer's design compensates for the added heat and moisture.
IBC 1209.2 Finish materials
Corrective Action Required
07/22/2024

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) Action required: Specify compliant wall finish materials at mop sink. If paint is used it must be epoxy based. (also applicable at water closet if the wall surfaces become part of scope of work - some patching assumed given that additional grab bars will have to be installed)
IPC 802.1 Indirect/special waste
Corrective Action Required
07/22/2024

2018 IPC 802.1 Where required. Food-handling equipment, in other than dwelling units, clear-water waste, humidifiers, dish-washing machines and utensils, pots, pans and dishwashing sinks shall discharge though an indirect waste pipe as specified in Sections 802.1.1 through 802.1.8. Fixtures not required to be indirectly connected by this section and the exception to Section 301.6 shall be directly connected to the plumbing system in accordance with Chapter 7. Action required: Indirect connections required at 3-compartment sink. To be field verified.
Licensed Contractors Rejected 07/26/2024 07/22/2024
Joe Frogge
LC - General Contractor
Corrective Action Required
07/22/2024

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and the name, email address & phone number for the on-site contact.
LC - MEP Subs
Corrective Action Required
07/22/2024

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Change of Tenant $240.00 $240.00 Paid 08/30/2024
$14,429.25
7232302-Commercial License Tax Fee $4,809.75 $4,809.75 Paid 07/17/2024
$4,809.75
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Passed 9/23/2024 9/23/2024 09/23/2024
In-wall Inspection Failed 10/9/2024 10/9/2024 10/09/2024
Misc
Corrective Action Required
10/09/2024
-Provide City approved stamped plans for inspections -Complete all in wall MEPs
In-wall Inspection Partial 10/14/2024 10/14/2024 10/14/2024
Misc
Corrective Action Required
10/09/2024
In-wall Inspection Passed 10/14/2024 10/14/2024 10/14/2024
Misc
Informational
10/14/2024
Submit revised plan showing ejector pump at front sink **In wall ok to cover
Rough Electrical Inspection - Commercial Partial 11/8/2024 11/8/2024 11/08/2024
Misc
Corrective Action Required
11/08/2024
- Remove wires from grid. ( will inspect at above ceiling ) Rough electrical in walls approved - electrical panel removal from East wall pending
Electrical Service Inspection Passed 11/8/2024 11/08/2024
Above Ceiling Inspection Failed 1/9/2025 1/9/2025 01/09/2025
Misc
Corrective Action Required
01/09/2025
-Support all mc off of grid -Provide support wires at opposite corners of all 2x4 lights -Connect bath exhaust -Install knockout cover at j box above prep
Above Ceiling Inspection Passed 1/21/2025 1/21/2025 01/21/2025
Misc
Resolved
01/21/2025
-Support all mc off of grid -Provide support wires at opposite corners of all 2x4 lights -Connect bath exhaust -Install knockout cover at j box above prep
Rough Electrical Inspection - Commercial Passed 1/21/2025 1/21/2025 01/21/2025
Misc
Resolved
01/21/2025
- Remove wires from grid. ( will inspect at above ceiling ) Rough electrical in walls approved - electrical panel removal from East wall pending
Occupancy Inspection - Codes Commercial Failed 2/6/2025 2/6/2025 02/06/2025
Misc
Corrective Action Required
02/06/2025
-Mount fire extinguisher -Provide GFCI protection at mechanical, by sink in kitchen and at coffee maker
Occupancy Inspection - Fire Passed 2/6/2025 2/6/2025 02/06/2025
Occupancy Inspection - Codes Commercial Full C of O 2/7/2025 2/7/2025 02/07/2025
Misc
Resolved
02/07/2025
-Mount fire extinguisher -Provide GFCI protection at mechanical, by sink in kitchen and at coffee maker
Documents & Images
Date Uploaded File Type Document Name
07/18/2024 Code Mod Request 240718_SereniTea Boutique_Code Modificataion Request
07/18/2024 Application Form 240718_SereniTea Boutique_Commercial Permit Application
07/18/2024 Plans 240718_SereniTea Boutique_Overall Permit Set
07/18/2024 Letter License Tax Bill
08/08/2024 Letter 240808_SereniTea Boutique_City Comment Response
08/08/2024 Plans 240808_SereniTea Boutique_Overall Permit Set_Revised
08/08/2024 Letter DS P/R Corrections Document
08/12/2024 Letter Health Dept approval
08/19/2024 Approved Plans Approved permit set
08/30/2024 Receipt Receipt for transaction:2024-007380
09/05/2024 Letter DS Building Permit
09/23/2024 Letter INSPECTION SUMMARY
10/09/2024 Letter INSPECTION SUMMARY
10/14/2024 Letter INSPECTION SUMMARY
10/14/2024 Letter INSPECTION SUMMARY
11/08/2024 Letter INSPECTION SUMMARY
11/08/2024 Letter INSPECTION SUMMARY
01/09/2025 Letter INSPECTION SUMMARY
01/21/2025 Letter INSPECTION SUMMARY
01/21/2025 Letter INSPECTION SUMMARY
02/06/2025 Health Department
02/06/2025 Letter INSPECTION SUMMARY
02/07/2025 Letter Codes Final Certificate of Occupancy
02/07/2025 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home