Permit Application Status

PRCOM20261033


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20261033
Building Permit - Commercial
Issued
CITY OF LEES SUMMIT
ALTERATION COMMERCIAL
LEE'S SUMMIT POLICE DEPARTMENT - REMODEL OF THE DISPATCH SPACE INTO REAL TIME CRIME CENTER. ADD OFFICE TO POLICE RECORDS
03/12/2026
03/24/2026
Locations
Contacts
CITY OF LEES SUMMIT, Address:207 SW MARKET ST  
Titan Built, LLC, Address:8207 Melrose Drive, #200, Phone:(913) 782-6700  
METRO AIR CONDITIONING , Address:8151 MCCOY ST, Phone:(913) 888-3991  
S & S ELECTRICAL CONTRACTING LLC, Address:574 NW 1921 RD, Phone:(816) 847-2433  
SALADINO PLUMBING & HEATING COMPANY, Address:2210 TELEVISION PL, Phone:(816) 833-9900  
Luke Westbrook - Titan Built, Address:8207 Melrose Drive, Phone:(316) 765-2869  
HOEFER WELKER, Address:4622 PENNSULVANIA AVE, SUITE 1400, Phone:(913) 307-3837  
Keith Williams - Titan Built, Phone:(913) 439-8638  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 03/24/2026 03/24/2026
Joe Frogge
LC - General Contractor
Resolved
03/24/2026

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and the name, email address & phone number for the on-site contact.
Fire Plan Review Approved with Conditions 03/24/2026 03/24/2026
Craig Hill
Construction documents for fire alarm systems
Corrective Action Required
03/24/2026

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Provide deferred submittal for fire alarm system.
Construction documents - Fire protection systems
Corrective Action Required
03/24/2026

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Provide deferred submittal for fire protection system.
Building Plan Review Approved 03/24/2026 03/23/2026
Joe Frogge
Alarm Plan Review Pending
Craig Hill
Sprinkler Plan Review Pending
Craig Hill
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for Alteration to Commercial $596.00 $596.00 Paid 03/24/2026
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Pending
Above Ceiling Inspection Pending
Rough Electrical Inspection - Commercial Pending
Underslab Plumbing Inspection - Commercial Pending
Rough Plumbing Inspection - Commercial Pending
Documents & Images
Date Uploaded File Type Document Name
03/12/2026 Application Form APPLICATION
03/17/2026 Plans LSPD-RTCC Permit Set
03/24/2026 Approved Plans Approved construction plans
03/24/2026 Letter DS Building Permit
03/24/2026 Receipt Receipt for transaction: 2026-001775
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home