Permit Application Status

PRCOM20260496


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20260496
Building Permit - Commercial
In Plan Review
CITY OF LEES SUMMIT
NEW COMMERCIAL
HYPER ENERGY BAR - NEW RESTAURANT WITH DRIVE-THRU
02/05/2026
08/18/2026
Locations
Contacts
  
  
  
  
  
David Eskov Architecture, Address:21466 W 120th St, Phone:(913) 284-3660  
CITY OF LEES SUMMIT, Address:220 SE GREEN ST  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Plan Review Rejected 02/20/2026 02/19/2026
Joe Frogge
Final Development Plan
Corrective Action Required
02/19/2026

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational.
Health Dept Review
Corrective Action Required
02/19/2026

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 797-7162. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is informational.
Health Dept Inspection
Corrective Action Required
02/19/2026

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 797-7162. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is informational.
License Tax - Payment
Corrective Action Required
02/19/2026

A one-time impact fee in the form of an excise tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is informational. The fee will be $6,105.00
IPC 604.8 Water pressure reducing valve
Corrective Action Required
02/19/2026

2018 IPC 604.8 Water Pressure reducing valve or regulator. Where water pressure within a building exceeds 80 psi static, an approved water-pressure reducing valve conforming to ASSE 1003 or CSA B356 with strainer shall be installed to reduce the pressure in the building water distribution piping to not greater than 80 psi static. Action required: Provide pressure reducing valve at water entry. (Our Water Department requires PRV installation in all locations regardless of pressure)
Licensed Contractors Rejected 02/20/2026 02/19/2026
Joe Frogge
LC - General Contractor
Corrective Action Required
02/19/2026

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and the name, email address & phone number for the on-site contact.
LC - MEP Subs
Corrective Action Required
02/19/2026

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Approved 02/20/2026 02/18/2026
Craig Hill
Final Development Plan Review Pending 03/30/2026
Daniel Fernandez
Health Department Review Pending
Joe Frogge
Inspections

There are no inspections for this permit application.

Documents & Images
Date Uploaded File Type Document Name
02/05/2026 Application Form 595 HEBLS Commerical Bldg Permit App_260202
02/06/2026 Plans 595 HEBLS ARCH Permit SEALED_260203
02/06/2026 Engineer Report/Study 595 HEBLS COMCHECK-Bldg Env_260202
02/06/2026 Engineer Report/Study 595 HEBLS COMCHECK-Mech_260130
02/06/2026 Plans 595 HEBLS MECH Permit SEALED_260130
02/06/2026 Engineer Report/Study 595 HEBLS Struct Calcs_260202
02/06/2026 Plans 595 HEBLS STRUCT Permit SEALED_260202
02/19/2026 Letter License Tax Bill
02/19/2026 Letter DS P/R Corrections Document
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home