Permit Application Status

PRCOM20254584


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20254584
Building Permit - Commercial
Issued
NEW COMMERCIAL
SMALLS SLIDERS - QUICK SERVICE RESTAURANT SERVING THE COMMUNITY WITH WALK UP PATIO DINING, AND DRIVE THRU. MODULAR BUILDING, SITE WORK WITH ELECTRICAL AND MECHANICAL CONNECTIONS.
10/22/2025
02/20/2026
07/01/2026
Locations
Contacts
JE FOSTER BUILDING CO, Address:108 Green Park Industrial Ct.   
Daniel Harper, JE Foster, Address:108 Green Park Industrial Ct, Phone:(314) 825-3615  
Hale's Mechanical LLC., Address:2109 Kara Court   
RODINA COMPANY INC, Address:1204 N 59TH ST, Phone:(913) 334-5336  
IPLUMBKC LLC, Address:34108 E TRUMAN RD, Phone:(833) 758-6252  
Hill Foley Rossi & Associates, Address:3680 Pleasant Hill Road, suite 200, Phone:(770) 622-9858  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Plan Review Approved with Conditions 12/22/2025 02/17/2026
Joe Frogge
Health Dept Inspection
Corrective Action Required
12/15/2025

For the Health Department review contact Amanda Burch with the Jackson County Public Works Department, Environmental Services Division, at (816) 797-7198. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is informational. 12/17/2025 - Acknowledged in letter.
Final Development Plan
Resolved
02/12/2026

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational. 12/17/2025 - Acknowledged in letter.
License Tax - Payment
Corrective Action Required
12/15/2025

A one-time impact fee in the form of an excise tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is informational. The fee will be $24,543.75. 12/17/2025 - Acknowledged in letter.
Gen - Plan submittals 2018 codes
Corrective Action Required
12/15/2025

All plans submitted for review on or after April 1, 2019 shall be designed to the requirements of the 2018 International Building Code, 2018 International Mechanical Code, 2018 International Plumbing Code, 2018 International Fuel Gas Code, 2018 International Fire Code, 2017 National Electric Code and the ICC/ANSI A117.1-2009 as amended and adopted by the City of Lee’s Summit. Action required: Provide updated Manufactured Housing & Modular Unit State approval documents. (current documents site 2015 code years) 12/17/2025 - Updates pending for modular building. Also, the code references now show 2021 cycle. We are still on the 2018. You can apply for a Code Modification Request should you choose to use the 2021. 1/2/26 - Per architect, plans have been resubmitted to the State. Approval pending.
IMC 403.3.1.1 Outdoor airflow - nail salon
Resolved
12/17/2025

2018 IMC 403.2 Outdoor air required. The minimum outdoor airflow rate shall be determined in accordance with Section 403.3. (see code for exception) Action required: Provide exhaust fan(s) at restrooms.
IMC 403.2 Outdoor air required
Resolved
12/17/2025

2018 IMC 403.2 Outdoor air required. The minimum outdoor airflow rate shall be determined in accordance with Section 403.3. (see code for exception) Action required: Revise drawings to show outside air calculations as well as method of delivery.
IPC 604.8 Water pressure reducing valve
Resolved
12/17/2025

2018 IPC 604.8 Water Pressure reducing valve or regulator. Where water pressure within a building exceeds 80 psi static, an approved water-pressure reducing valve conforming to ASSE 1003 or CSA B356 with strainer shall be installed to reduce the pressure in the building water distribution piping to not greater than 80 psi static. Action required: Provide pressure reducing valve at water entry. (Our Water Department requires PRV installation in all locations regardless of pressure)
waiting for state approval on building and contractors to be provided.TRACY DEISTER 12/22/2025 3:06 PM
Licensed Contractors Approved 12/22/2025 02/17/2026
Joe Frogge
LC - General Contractor
Resolved
02/17/2026

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and the name, email address & phone number for the on-site contact. 12/17/2025 - Acknowledged in letter.
LC - MEP Subs
Resolved
02/17/2026

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 12/17/2025 - Acknowledged in letter.
Final Development Plan Review Approved 01/12/2026 01/12/2026
Grant White
Fire Plan Review Approved 12/22/2025 12/22/2025
Craig Hill
Building Plan Review Rejected 11/05/2025 11/05/2025
Joe Frogge
Health Dept Inspection
Corrective Action Required
11/05/2025

For the Health Department review contact Amanda Burch with the Jackson County Public Works Department, Environmental Services Division, at (816) 797-7198. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is informational.
Final Development Plan
Corrective Action Required
11/05/2025

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational.
License Tax - Payment
Corrective Action Required
11/05/2025

A one-time impact fee in the form of an excise tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is informational. The fee will be $24,543.75.
Gen - Plan submittals 2018 codes
Corrective Action Required
11/05/2025

All plans submitted for review on or after April 1, 2019 shall be designed to the requirements of the 2018 International Building Code, 2018 International Mechanical Code, 2018 International Plumbing Code, 2018 International Fuel Gas Code, 2018 International Fire Code, 2017 National Electric Code and the ICC/ANSI A117.1-2009 as amended and adopted by the City of Lee’s Summit. Action required: Provide updated Manufactured Housing & Modular Unit State approval documents. (current documents site 2015 code years)
IMC 403.3.1.1 Outdoor airflow - nail salon
Resolved
12/22/2025

2018 IMC 403.2 Outdoor air required. The minimum outdoor airflow rate shall be determined in accordance with Section 403.3. (see code for exception) Action required: Provide exhaust fan(s) at restrooms.
IMC 403.2 Outdoor air required
Resolved
12/22/2025

2018 IMC 403.2 Outdoor air required. The minimum outdoor airflow rate shall be determined in accordance with Section 403.3. (see code for exception) Action required: Revise drawings to show outside air calculations as well as method of delivery.
IPC 604.8 Water pressure reducing valve
Resolved
12/22/2025

2018 IPC 604.8 Water Pressure reducing valve or regulator. Where water pressure within a building exceeds 80 psi static, an approved water-pressure reducing valve conforming to ASSE 1003 or CSA B356 with strainer shall be installed to reduce the pressure in the building water distribution piping to not greater than 80 psi static. Action required: Provide pressure reducing valve at water entry. (Our Water Department requires PRV installation in all locations regardless of pressure)
Licensed Contractors Rejected 11/05/2025 11/05/2025
Joe Frogge
LC - General Contractor
Corrective Action Required
11/05/2025

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and the name, email address & phone number for the on-site contact.
LC - MEP Subs
Corrective Action Required
11/05/2025

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Approved 11/05/2025 11/05/2025
Craig Hill
Health Department Review Approved 11/05/2025 10/30/2025
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for New Commercial $6,000.00 $6,000.00 Paid 02/19/2026
Commercial Excise Tax Fee $24,543.75 $24,543.75 Paid 02/19/2026
Parks Impact Fee Non-Residential - Zone 4 $160.00 $160.00 Paid 02/19/2026
Sanitary Sewer Insp Fees $1,301.28 $1,301.28 Paid 02/11/2026
Water Insp Fee $105.00 $105.00 Paid 02/11/2026
Storm Sewer Inspection Fee $1,210.95 $1,210.95 Paid 02/11/2026
Paved Surface Inspection Fee $7,416.33 $7,416.33 Paid 02/11/2026
Site Grading Fee $4,064.94 $4,064.94 Paid 02/11/2026
Right of Way Permit Fee $85.00 $85.00 Paid 02/11/2026
Water Meter Fee $1,113.00 $1,113.00 Paid 02/11/2026
Water Tap Fee $10,880.00 $10,880.00 Paid 02/11/2026
Sanitary Sewer Development Fee $6,403.00 $6,403.00 Paid 02/11/2026
Water Test Fee $200.00 $200.00 Paid 02/11/2026
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Pending
Water Service Inspection Pending
Grading/Excavation/Fill Inspection Pending
Sewer Service Inspection Pending
Pavement-Proof Roll Pending
Pavement-Surface Pending
Install Street and Stop Signs Pending
Pavement-Aggregate Base Pending
Pavement-Curb Construction Pending
Pavement-Stabilized Subgrade Pending
Storm Sewer Construction Inspection Pending
Underslab Plumbing Inspection - Commercial Pending
Electrical Service Inspection Pending
Gas Service Inspection - Commercial Pending
In-wall Inspection Pending
Hood/Duct Inspection Pending
Alternate Protection Systems Inspection Pending
Grading/Excavation/Fill Inspection Pending
Water Line - Construction Inspection Pending
Sanitary Sewer Construction Inspection Pending
Sanitary Sewer - Mandrel Pending
Sanitary Sewer - Vacuum Pending
Pavement-Proof Roll Pending
Install Street and Stop Signs Pending
Pavement-Aggregate Base Pending
Pavement-Curb Construction Pending
Pavement-Stabilized Subgrade Pending
Storm Sewer Construction Inspection Pending
Erosion Control Inspection Pending
Footing Inspection - Commercial Pending
Misc
Informational
03/10/2026
Following areas inspected -(6) west most footing pads Concrete encased electrode in middle S pad
Site Visit Pending
Misc
Corrective Action Required
03/18/2026
2-2-26 Dustin A, No work being done on site for dev 2-6-26 Dustin A, No work being done on site for dev, Erosion control going down. 2-23-26 Dustin A, Dirt work 2-25-26 Dustin A, Dirt work 3/4/26 PS Made site visit, no inspections for FEI today 3-11-26 Dustin A, Working on framing for footings 3-17-26 Dustin A, Footing work 3-18-26 Dustin A, No work for Dev prepping for containers
Piers/Caissons Inspection - Commercial Pending 3/19/2026 3/19/2026
Above Ceiling Inspection Pending 5/21/2026
Site Visit Partial 02/02/2026
Misc
Corrective Action Required
02/02/2026
2-2-26 Dustin A, No work being done on site for dev
Site Visit Partial 02/06/2026
Misc
Corrective Action Required
02/02/2026
2-2-26 Dustin A, No work being done on site for dev 2-6-26 Dustin A, No work being done on site for dev, Erosion control going down
Site Visit Partial 02/23/2026
Misc
Corrective Action Required
02/06/2026
2-2-26 Dustin A, No work being done on site for dev 2-6-26 Dustin A, No work being done on site for dev, Erosion control going down. 2-23-26 Dustin A, Dirt work
Site Visit Partial 02/26/2026
Misc
Corrective Action Required
02/23/2026
2-2-26 Dustin A, No work being done on site for dev 2-6-26 Dustin A, No work being done on site for dev, Erosion control going down. 2-23-26 Dustin A, Dirt work 2-25-26 Dustin A, Dirt work
Site Visit Partial 3/4/2026 3/4/2026 03/04/2026
Misc
Corrective Action Required
02/26/2026
2-2-26 Dustin A, No work being done on site for dev 2-6-26 Dustin A, No work being done on site for dev, Erosion control going down. 2-23-26 Dustin A, Dirt work 2-25-26 Dustin A, Dirt work 3/4/26 PS Made site visit, no inspections for FEI today
Footing Inspection - Commercial Partial 3/9/2026 3/9/2026 03/09/2026
Misc
Informational
03/09/2026
Following areas inspected -(6) west most footing pads Concrete encased electrode in middle S pad
Footing Inspection - Commercial Partial 3/10/2026 3/10/2026 03/10/2026
Misc
Corrective Action Required
03/10/2026
Following areas inspected -(6) west most footing pads Concrete encased electrode in middle S pad -remaining 5 pads (1) double
Site Visit Partial 3/11/2026 3/11/2026 03/11/2026
Misc
Corrective Action Required
03/04/2026
2-2-26 Dustin A, No work being done on site for dev 2-6-26 Dustin A, No work being done on site for dev, Erosion control going down. 2-23-26 Dustin A, Dirt work 2-25-26 Dustin A, Dirt work 3/4/26 PS Made site visit, no inspections for FEI today 3-11-26 Dustin A, Working on framing for footings
Site Visit Partial 03/17/2026
Misc
Corrective Action Required
03/11/2026
2-2-26 Dustin A, No work being done on site for dev 2-6-26 Dustin A, No work being done on site for dev, Erosion control going down. 2-23-26 Dustin A, Dirt work 2-25-26 Dustin A, Dirt work 3/4/26 PS Made site visit, no inspections for FEI today 3-11-26 Dustin A, Working on framing for footings 3-17-26 Dustin A, Footing work
Site Visit Partial 03/18/2026
Misc
Corrective Action Required
03/17/2026
2-2-26 Dustin A, No work being done on site for dev 2-6-26 Dustin A, No work being done on site for dev, Erosion control going down. 2-23-26 Dustin A, Dirt work 2-25-26 Dustin A, Dirt work 3/4/26 PS Made site visit, no inspections for FEI today 3-11-26 Dustin A, Working on framing for footings 3-17-26 Dustin A, Footing work 3-18-26 Dustin A, No work for Dev prepping for containers
Documents & Images
Date Uploaded File Type Document Name
10/22/2025 Application Form APPLICATION
10/23/2025 Engineer Report/Study 20_25_2003 Special Inspections Packet
10/23/2025 Plans 40_- 0 - SMALLS - PLAN - LEE'S SUMMIT, MO
10/23/2025 Plans Smalls Sliders_Lee's Summit_Full Set wo Modular Building
10/23/2025 Letter License Tax Bill
10/30/2025 3rd Party Permit/Approval Jackson Cty Health
11/05/2025 Letter DS P/R Corrections Document
12/15/2025 Plans Smalls - Modular Plan - Lee's Summit, MO - 12_11_25
12/15/2025 Letter 20251212 Lee's Summit - Permit Response w specs
01/14/2026 Approved Plans Approved FDP_Smalls Sliders_PL2025287_1.14.2025
02/02/2026 Letter INSPECTION SUMMARY
02/06/2026 Letter INSPECTION SUMMARY
02/11/2026 Receipt Receipt for transaction:2026-000791
02/12/2026 Plans Smalls - Modular Plan - Lee's Summit, Missouri - Rev 1 (2_11_26)
02/12/2026 Approved Plans Approved construction plans
02/19/2026 Receipt Receipt for transaction:2026-000985
02/20/2026 Letter DS Building Permit
02/20/2026 Letter DS Building Permit
02/23/2026 Letter INSPECTION SUMMARY
02/26/2026 Letter INSPECTION SUMMARY
03/04/2026 Letter INSPECTION SUMMARY
03/09/2026 Letter DS P/R Corrections Document
03/09/2026 Letter INSPECTION SUMMARY
03/10/2026 Letter INSPECTION SUMMARY
03/11/2026 Letter INSPECTION SUMMARY
03/17/2026 Letter INSPECTION SUMMARY
03/18/2026 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home