Permit Application Status

PRCOM20253864


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20253864
Building Permit - Commercial
Issued
CITY OF LEES SUMMIT
PRIVATE SITE DEVELOPMENT
12 pickleball courts with shade canopies, sidewalk, and private water extension.
09/10/2025
09/25/2025
Locations
Contacts
  
  
QUESTEC MECHANICAL INC, Address:1390 E BOONE INDUSTRIAL DR, SUITE 260, Phone:(573) 875-0260  
Steve Casey, Phone:(816) 969-1500  
CITY OF LEES SUMMIT, Address:220 SE GREEN ST  
Olsson Engineering, Address:1814 Main St, Phone:(913) 522-5170  
PRECISION CONSTRUCTION & CONTRACTING LLC, Address:P O BOX 1000, Phone:(913) 634-8816  
Gameday Lighting, LLC, Address:2930 Terrace St  
QUESTEC MECHANICAL INC, Address:1390 E BOONE INDUSTRIAL DR, SUITE 260, Phone:(573) 875-0260  
  
  
  
  
  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review Approved 09/24/2025 09/24/2025
Sue Pyles, P.E.
Miscellaneous Correction
Corrective Action Required
09/22/2025

Please provide a stormwater memo that addresses the ability of the downstream drainage path to handle the increased runoff with no negative effects to the existing infrastructure along the path.
Building Plan Review Approved 09/24/2025 09/22/2025
Joe Frogge
Engineering Review Rejected 09/18/2025 09/18/2025
Sue Pyles, P.E.
Miscellaneous Correction
Corrective Action Required
09/18/2025

Please provide a stormwater memo that addresses the ability of the downstream drainage path to handle the increased runoff with no negative effects to the existing infrastructure along the path.
Building Plan Review Approved 09/17/2025
Joe Frogge
Gen - Plan submittal documents
Corrective Action Required
09/15/2025

Lee's Summit Code Of Ordinances 7-137. - Submittal Documents. Construction documents, special inspection and structural observation programs, and other data shall be submitted digitally with each application for a permit. A registered design professional licensed by the State of Missouri shall prepare the construction documents. Where special conditions exist, the Building Official is authorized to require additional construction documents to be prepared by a registered design professional licensed by the State of Missouri. Action required: All drawings in Civil set need to be sealed/signed.
Licensed Contractors Rejected 09/11/2025 09/15/2025
Joe Frogge
LC - General Contractor
Corrective Action Required
09/15/2025

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and the name, email address & phone number for the on-site contact. (Tarkett Sports/PCC Sports does not have a license with us)
LC - MEP Subs
Corrective Action Required
09/15/2025

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. (Gameday Lighting does not have a license with us)
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for New Other $2,071.47 $2,071.47 Paid 09/25/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Water Line - Construction Inspection Pending
Misc
Informational
11/24/2025
11-18-25 PS Contractor excavating for 1" water line 11-19-25 PS contractor continuing to excavate for water line 11-20-25 PS Partial inspection on water line from irrigation stub, water fountain and furture restroom expansion to backflow device, ok to cover partial water line inspection. 11-24-25 PS Contractor completed tap for 1" line at existing private 8" water line. Backflow in place, approved to backfill
Grading/Excavation/Fill Inspection Pending
Misc
Informational
12/22/2025
11-24-25 PS Crew on site grading site on south side of pickle ball courts 11-25-25 PS Crews on site continuing to grade and haul off spoils piles from site 12-5-25 PS Crews on site grading and removing soils piles from site 12-15-25 PS Crews performing site grading 12-22-25 PS Crews performing site grading
Final Inspection - Commercial Pending
Misc
Corrective Action Required
01/22/2026
- NO FINAL INSPECTION CALLED IN. - COMPLETE ALL ENGINEERING INSPECTIONS - NO INSPECTION OF ELECTRICAL OF BASES OF 3 LIGHT POLE AT SIDEWALK NEAR PARKING LOT. - upload third party inspection on torq specs of shade structure. - 3 Light pole bases North on sidewalk near parking lot. Not inspected and not on plans.
Site Visit Pending
Misc
Informational
03/02/2026
9-26-25 PS Made site visit, contractor boring for fence posts at court perimeter 9-30-25 PS Contractor boring for fence posts at court perimeter 10-3-25 PS Contractor setting forms and tension cables for courts 10-6-25 PS Contractor setting tension cable for courts 10-8-25 PS Contractor pouring surface concrete at courts at time of inspection 10-13-25 PS Crew working on site cleanup and preparing for next court pour 10-28-25 PS Crews on site with Tarkett continue working on court construction. 10-30-25 PS Crew on site working on site grading around pickle ball courts 11-07-25 JS Crew on site poured two sections of concrete one between the courts and one in-front of the courts. 11-21-25 PS No activity on site today due to weather 1-28-26 PS Made site visit, no inspections for FEI today 1/30/26 PS Made site visit, no inspections for FEI today 2/9/26 PS Made site visit, no inspections for FEI today 3/2/26 PS Made site visit, electrical contractors non site working, no inspections for FEI
Erosion Control Inspection Pending
Misc
Informational
03/17/2026
10-8-25 PS Erosion control is within compliance and set per approved plans at time of inspection 11-12-25 PS Erosion control is within compliance at time of inspection. 11-20-25 PS Erosion control within compliance at time of inspection 12-5-25 PS Erosion control within compliance, ensure to monitor trucks leaving site with soils piles that mud doesn't track passed construction entrance 12-15-25 PS Erosion control within compliance at time of inspection 12-22-25 PS Erosion control within compliance at time of inspection 1-12-26 PS Erosion control within compliance at time of inspection 2-9-26 PS Erosion control within compliance at time of inspection
Underground Electrical Inspection - Commercial Pending
E300.5 Underground Installations
Corrective Action Required
03/18/2026
- NO INSPECTION OF ELECTRICAL OF BASES OF 3 LIGHT POLE AT SIDEWALK NEAR PARKING LOT.
Piers/Caissons Inspection - Commercial Pending
Miscellaneous Correction
Corrective Action Required
03/18/2026
- 3 Light pole bases North on sidewalk near parking lot. Not inspected and not on plans.
Miscellaneous Inspection Pending
Misc
Corrective Action Required
03/18/2026
- NO FINAL INSPECTION CALLED IN. - COMPLETE ALL ENGINEERING INSPECTIONS - NO INSPECTION OF ELECTRICAL OF BASES OF 3 LIGHT POLE AT SIDEWALK NEAR PARKING LOT. - upload third party inspection on torq specs of shade structure. - 3 Light pole bases North on sidewalk near parking lot. Not inspected and not on plans.
Sidewalk Inspection Pending
Misc
Informational
03/18/2026
11-12-25 PS partial pre pour for shared use sidewalk, forms in place and aggregate compacted with rebar placement 11-17-25 PS Contractor pouring sidewalk on north side of pickleball courts, partial pour 12-22-25 PS Remainder of sidewalk on north side has been poured 3/18/26 PS Sidewalk that runs east/west connecting parking lot to pickleball courts have been verified to meet requirements. See plans, missing sidewalk that runs north/south connecting new pickleball sidewalk to existing sidewalk at community center. Ensure a pre pour inspection is scheduled prior to pour of concrete.
Site Visit Partial 9/26/2025 9/26/2025 09/26/2025
Misc
Informational
09/26/2025
9-26-25 PS Made site visit, contractor boring for fence posts at court perimeter
Site Visit Partial 9/30/2025 9/30/2025 09/30/2025
Misc
Informational
09/26/2025
9-26-25 PS Made site visit, contractor boring for fence posts at court perimeter 9-30-25 PS Contractor boring for fence posts at court perimeter
Erosion Control Inspection Partial 9/30/2025 9/30/2025 09/30/2025
Misc
Informational
09/30/2025
9-30-25 PS Erosion control is within compliance and set per approved plans at time of inspection
Piers/Caissons Inspection - Commercial Partial 10/3/2025 10/3/2025 10/03/2025
Miscellaneous Correction
Corrective Action Required
10/03/2025
- Upload light pole base detail to permit.
Misc
Informational
10/03/2025
Piers Approved: 6 Pers for light poles in middle of South courts.
Site Visit Partial 10/3/2025 10/3/2025 10/03/2025
Misc
Informational
09/30/2025
9-26-25 PS Made site visit, contractor boring for fence posts at court perimeter 9-30-25 PS Contractor boring for fence posts at court perimeter 10-3-25 PS Contractor setting forms and tension cables for courts
Site Visit Partial 10/6/2025 10/6/2025 10/06/2025
Misc
Informational
10/03/2025
9-26-25 PS Made site visit, contractor boring for fence posts at court perimeter 9-30-25 PS Contractor boring for fence posts at court perimeter 10-3-25 PS Contractor setting forms and tension cables for courts 10-6-25 PS Contractor setting tension cable for courts
Site Visit Partial 10/8/2025 10/8/2025 10/08/2025
Misc
Informational
10/06/2025
9-26-25 PS Made site visit, contractor boring for fence posts at court perimeter 9-30-25 PS Contractor boring for fence posts at court perimeter 10-3-25 PS Contractor setting forms and tension cables for courts 10-6-25 PS Contractor setting tension cable for courts 10-8-25 PS Contractor pouring surface concrete at courts at time of inspection
Erosion Control Inspection Partial 10/8/2025 10/8/2025 10/08/2025
Misc
Informational
09/30/2025
10-8-25 PS Erosion control is within compliance and set per approved plans at time of inspection
Site Visit Partial 10/13/2025 10/13/2025 10/13/2025
Misc
Informational
10/08/2025
9-26-25 PS Made site visit, contractor boring for fence posts at court perimeter 9-30-25 PS Contractor boring for fence posts at court perimeter 10-3-25 PS Contractor setting forms and tension cables for courts 10-6-25 PS Contractor setting tension cable for courts 10-8-25 PS Contractor pouring surface concrete at courts at time of inspection 10-13-25 PS Crew working on site cleanup and preparing for next court pour
Footing Inspection - Commercial Failed 10/21/2025 10/21/2025 10/21/2025
Misc
Corrective Action Required
10/21/2025
- Piers for shade structure to be 42” wide currently 36” - 4 Piers for the 2 small shade structures approved
Footing Inspection - Commercial Passed 10/21/2025 10/21/2025
Misc
Corrective Action Required
10/21/2025
- Piers for shade structure Approved - 4 Piers for the 2 small shade structures approved
Piers/Caissons Inspection - Commercial Partial 10/27/2025 10/27/2025 10/27/2025
Miscellaneous Correction
Corrective Action Required
10/03/2025
- Upload light pole base detail to permit.
Misc
Informational
10/03/2025
Piers Approved: 6 Pers for light poles in middle of South courts.
Misc
Corrective Action Required
10/27/2025
12 light pole bases, 4 around shade structure and 4 in west side and 4 on East side of court’s Approved
Site Visit Partial 10/28/2025 10/28/2025 10/28/2025
Misc
Informational
10/13/2025
9-26-25 PS Made site visit, contractor boring for fence posts at court perimeter 9-30-25 PS Contractor boring for fence posts at court perimeter 10-3-25 PS Contractor setting forms and tension cables for courts 10-6-25 PS Contractor setting tension cable for courts 10-8-25 PS Contractor pouring surface concrete at courts at time of inspection 10-13-25 PS Crew working on site cleanup and preparing for next court pour 10-28-25 PS Crews on site with Tarkett continue working on court construction.
Site Visit Partial 10/30/2025 10/30/2025 10/30/2025
Misc
Informational
10/28/2025
9-26-25 PS Made site visit, contractor boring for fence posts at court perimeter 9-30-25 PS Contractor boring for fence posts at court perimeter 10-3-25 PS Contractor setting forms and tension cables for courts 10-6-25 PS Contractor setting tension cable for courts 10-8-25 PS Contractor pouring surface concrete at courts at time of inspection 10-13-25 PS Crew working on site cleanup and preparing for next court pour 10-28-25 PS Crews on site with Tarkett continue working on court construction. 10-30-25 PS Crew on site working on site grading around pickle ball courts
Underslab Electrical Inspection - Commercial Partial 11/5/2025 11/5/2025 11/05/2025
Misc
Informational
11/05/2025
Approved areas - Conduit under walkway between courts
Underslab Electrical Inspection - Commercial Partial 11/7/2025 11/07/2025
Misc
Corrective Action Required
11/07/2025
Approved areas - Conduit under walkway between courts - Conduit under shade structure and out to North past sidewalk.
Site Visit Partial 11/7/2025 11/7/2025 11/07/2025
Misc
Informational
10/30/2025
9-26-25 PS Made site visit, contractor boring for fence posts at court perimeter 9-30-25 PS Contractor boring for fence posts at court perimeter 10-3-25 PS Contractor setting forms and tension cables for courts 10-6-25 PS Contractor setting tension cable for courts 10-8-25 PS Contractor pouring surface concrete at courts at time of inspection 10-13-25 PS Crew working on site cleanup and preparing for next court pour 10-28-25 PS Crews on site with Tarkett continue working on court construction. 10-30-25 PS Crew on site working on site grading around pickle ball courts 11-07-25 JS Crew on site poured two sections of concrete one between the courts and one in-front of the courts.
Erosion Control Inspection Partial 11/12/2025 11/12/2025 11/12/2025
Misc
Informational
10/08/2025
10-8-25 PS Erosion control is within compliance and set per approved plans at time of inspection 11-12-25 PS Erosion control is within compliance at time of inspection.
Sidewalk Inspection Partial 11/12/2025 11/12/2025 11/12/2025
Misc
Informational
11/12/2025
11-12-25 PS partial pre pour for shared use sidewalk, forms in place and aggregate compacted with rebar placement
Sidewalk Inspection Partial 11/17/2025 11/17/2025 11/17/2025
Misc
Informational
11/12/2025
11-12-25 PS partial pre pour for shared use sidewalk, forms in place and aggregate compacted with rebar placement 11-17-25 PS Contractor pouring sidewalk on north side of pickleball courts, partial pour
Water Line - Construction Inspection Partial 11/18/2025 11/18/2025 11/18/2025
Misc
Informational
11/18/2025
11-18-25 PS Contractor excavating for 1" water line
Water Line - Construction Inspection Partial 11/19/2025 11/19/2025 11/19/2025
Misc
Informational
11/18/2025
11-18-25 PS Contractor excavating for 1" water line 11-19-25 PS contractor continuing to excavate for water line
Water Line - Construction Inspection Partial 11/20/2025 11/20/2025 11/20/2025
Misc
Informational
11/19/2025
11-18-25 PS Contractor excavating for 1" water line 11-19-25 PS contractor continuing to excavate for water line 11-20-25 PS Partial inspection on water line from irrigation stub, water fountain and furture restroom expansion to backflow device, ok to cover partial water line inspection. Tie in to private main expected later today
Erosion Control Inspection Partial 11/20/2025 11/20/2025 11/20/2025
Misc
Informational
11/12/2025
10-8-25 PS Erosion control is within compliance and set per approved plans at time of inspection 11-12-25 PS Erosion control is within compliance at time of inspection. 11-20-25 PS Erosion control within compliance at time of inspection
Site Visit Partial 11/21/2025 11/21/2025 11/21/2025
Misc
Informational
11/07/2025
9-26-25 PS Made site visit, contractor boring for fence posts at court perimeter 9-30-25 PS Contractor boring for fence posts at court perimeter 10-3-25 PS Contractor setting forms and tension cables for courts 10-6-25 PS Contractor setting tension cable for courts 10-8-25 PS Contractor pouring surface concrete at courts at time of inspection 10-13-25 PS Crew working on site cleanup and preparing for next court pour 10-28-25 PS Crews on site with Tarkett continue working on court construction. 10-30-25 PS Crew on site working on site grading around pickle ball courts 11-07-25 JS Crew on site poured two sections of concrete one between the courts and one in-front of the courts. 11-21-25 PS No activity on site today due to weather
Water Line - Construction Inspection Partial 11/24/2025 11/24/2025 11/24/2025
Misc
Informational
11/20/2025
11-18-25 PS Contractor excavating for 1" water line 11-19-25 PS contractor continuing to excavate for water line 11-20-25 PS Partial inspection on water line from irrigation stub, water fountain and furture restroom expansion to backflow device, ok to cover partial water line inspection. 11-24-25 PS Contractor completed tap for 1" line at existing private 8" water line. Backflow in place, approved to backfill
Grading/Excavation/Fill Inspection Partial 11/24/2025 11/24/2025 11/24/2025
Misc
Informational
11/24/2025
11-24-25 PS Crew on site grading site on south side of pickle ball courts
Grading/Excavation/Fill Inspection Partial 11/25/2025 11/25/2025 11/25/2025
Misc
Informational
11/24/2025
11-24-25 PS Crew on site grading site on south side of pickle ball courts 11-25-25 PS Crews on site continuing to grade and haul off spoils piles from site
Grading/Excavation/Fill Inspection Partial 12/5/2025 12/5/2025 12/05/2025
Misc
Informational
11/25/2025
11-24-25 PS Crew on site grading site on south side of pickle ball courts 11-25-25 PS Crews on site continuing to grade and haul off spoils piles from site 12-5-25 PS Crews on site grading and removing soils piles from site
Erosion Control Inspection Partial 12/5/2025 12/5/2025 12/05/2025
Misc
Informational
11/20/2025
10-8-25 PS Erosion control is within compliance and set per approved plans at time of inspection 11-12-25 PS Erosion control is within compliance at time of inspection. 11-20-25 PS Erosion control within compliance at time of inspection 12-5-25 PS Erosion control within compliance, ensure to monitor trucks leaving site with soils piles that mud doesn't track passed construction entrance
Grading/Excavation/Fill Inspection Partial 12/15/2025 12/15/2025 12/15/2025
Misc
Informational
12/05/2025
11-24-25 PS Crew on site grading site on south side of pickle ball courts 11-25-25 PS Crews on site continuing to grade and haul off spoils piles from site 12-5-25 PS Crews on site grading and removing soils piles from site 12-15-25 PS Crews performing site grading
Erosion Control Inspection Partial 12/15/2025 12/15/2025 12/15/2025
Misc
Informational
12/05/2025
10-8-25 PS Erosion control is within compliance and set per approved plans at time of inspection 11-12-25 PS Erosion control is within compliance at time of inspection. 11-20-25 PS Erosion control within compliance at time of inspection 12-5-25 PS Erosion control within compliance, ensure to monitor trucks leaving site with soils piles that mud doesn't track passed construction entrance 12-15-25 PS Erosion control within compliance at time of inspection
Sidewalk Inspection Partial 12/22/2025 12/22/2025 12/22/2025
Misc
Informational
11/17/2025
11-12-25 PS partial pre pour for shared use sidewalk, forms in place and aggregate compacted with rebar placement 11-17-25 PS Contractor pouring sidewalk on north side of pickleball courts, partial pour 12-22-25 PS Remainder of sidewalk on north side has been poured
Grading/Excavation/Fill Inspection Partial 12/22/2025 12/22/2025 12/22/2025
Misc
Informational
12/15/2025
11-24-25 PS Crew on site grading site on south side of pickle ball courts 11-25-25 PS Crews on site continuing to grade and haul off spoils piles from site 12-5-25 PS Crews on site grading and removing soils piles from site 12-15-25 PS Crews performing site grading 12-22-25 PS Crews performing site grading
Erosion Control Inspection Partial 12/22/2025 12/22/2025 12/22/2025
Misc
Informational
12/15/2025
10-8-25 PS Erosion control is within compliance and set per approved plans at time of inspection 11-12-25 PS Erosion control is within compliance at time of inspection. 11-20-25 PS Erosion control within compliance at time of inspection 12-5-25 PS Erosion control within compliance, ensure to monitor trucks leaving site with soils piles that mud doesn't track passed construction entrance 12-15-25 PS Erosion control within compliance at time of inspection 12-22-25 PS Erosion control within compliance at time of inspection
Erosion Control Inspection Partial 1/12/2026 1/12/2026 01/12/2026
Misc
Informational
12/22/2025
10-8-25 PS Erosion control is within compliance and set per approved plans at time of inspection 11-12-25 PS Erosion control is within compliance at time of inspection. 11-20-25 PS Erosion control within compliance at time of inspection 12-5-25 PS Erosion control within compliance, ensure to monitor trucks leaving site with soils piles that mud doesn't track passed construction entrance 12-15-25 PS Erosion control within compliance at time of inspection 12-22-25 PS Erosion control within compliance at time of inspection 1-12-26 PS Erosion control within compliance at time of inspection
Final Inspection - Commercial Failed 1/22/2026 01/22/2026
Misc
Corrective Action Required
01/22/2026
Partial Inspection - upload third party inspection on torq specs of shade structure.
Piers/Caissons Inspection - Commercial Failed 1/22/2026 01/22/2026
Miscellaneous Correction
Corrective Action Required
10/27/2025
- Upload light pole base detail to permit.
Misc
Informational
10/27/2025
Piers Approved: 6 Pers for light poles in middle of South courts.
Misc
Corrective Action Required
10/27/2025
12 light pole bases, 4 around shade structure and 4 in west side and 4 on East side of court’s Approved
Miscellaneous Correction
Corrective Action Required
01/22/2026
- Light pole bases North on sidewalk not inspected and not on plans.
Site Visit Partial 1/28/2026 1/28/2026 01/28/2026
Misc
Informational
11/21/2025
9-26-25 PS Made site visit, contractor boring for fence posts at court perimeter 9-30-25 PS Contractor boring for fence posts at court perimeter 10-3-25 PS Contractor setting forms and tension cables for courts 10-6-25 PS Contractor setting tension cable for courts 10-8-25 PS Contractor pouring surface concrete at courts at time of inspection 10-13-25 PS Crew working on site cleanup and preparing for next court pour 10-28-25 PS Crews on site with Tarkett continue working on court construction. 10-30-25 PS Crew on site working on site grading around pickle ball courts 11-07-25 JS Crew on site poured two sections of concrete one between the courts and one in-front of the courts. 11-21-25 PS No activity on site today due to weather 1-28-26 PS Made site visit, no inspections for FEI today
Site Visit Partial 1/30/2026 1/30/2026 01/30/2026
Misc
Informational
01/28/2026
9-26-25 PS Made site visit, contractor boring for fence posts at court perimeter 9-30-25 PS Contractor boring for fence posts at court perimeter 10-3-25 PS Contractor setting forms and tension cables for courts 10-6-25 PS Contractor setting tension cable for courts 10-8-25 PS Contractor pouring surface concrete at courts at time of inspection 10-13-25 PS Crew working on site cleanup and preparing for next court pour 10-28-25 PS Crews on site with Tarkett continue working on court construction. 10-30-25 PS Crew on site working on site grading around pickle ball courts 11-07-25 JS Crew on site poured two sections of concrete one between the courts and one in-front of the courts. 11-21-25 PS No activity on site today due to weather 1-28-26 PS Made site visit, no inspections for FEI today 1/30/26 PS Made site visit, no inspections for FEI today
Underslab Electrical Inspection - Commercial Passed 2/5/2026 02/05/2026
Misc
Resolved
02/05/2026
Approved areas - Conduit under walkway between courts
Site Visit Partial 2/9/2026 2/9/2026 02/09/2026
Misc
Informational
01/30/2026
9-26-25 PS Made site visit, contractor boring for fence posts at court perimeter 9-30-25 PS Contractor boring for fence posts at court perimeter 10-3-25 PS Contractor setting forms and tension cables for courts 10-6-25 PS Contractor setting tension cable for courts 10-8-25 PS Contractor pouring surface concrete at courts at time of inspection 10-13-25 PS Crew working on site cleanup and preparing for next court pour 10-28-25 PS Crews on site with Tarkett continue working on court construction. 10-30-25 PS Crew on site working on site grading around pickle ball courts 11-07-25 JS Crew on site poured two sections of concrete one between the courts and one in-front of the courts. 11-21-25 PS No activity on site today due to weather 1-28-26 PS Made site visit, no inspections for FEI today 1/30/26 PS Made site visit, no inspections for FEI today 2/9/26 PS Made site visit, no inspections for FEI today
Erosion Control Inspection Partial 2/9/2026 2/9/2026 02/09/2026
Misc
Informational
01/12/2026
10-8-25 PS Erosion control is within compliance and set per approved plans at time of inspection 11-12-25 PS Erosion control is within compliance at time of inspection. 11-20-25 PS Erosion control within compliance at time of inspection 12-5-25 PS Erosion control within compliance, ensure to monitor trucks leaving site with soils piles that mud doesn't track passed construction entrance 12-15-25 PS Erosion control within compliance at time of inspection 12-22-25 PS Erosion control within compliance at time of inspection 1-12-26 PS Erosion control within compliance at time of inspection 2-9-26 PS Erosion control within compliance at time of inspection
Electrical Service Inspection Passed 2/25/2026 2/25/2026 02/25/2026
Site Visit Partial 3/2/2026 3/2/2026 03/02/2026
Misc
Informational
02/09/2026
9-26-25 PS Made site visit, contractor boring for fence posts at court perimeter 9-30-25 PS Contractor boring for fence posts at court perimeter 10-3-25 PS Contractor setting forms and tension cables for courts 10-6-25 PS Contractor setting tension cable for courts 10-8-25 PS Contractor pouring surface concrete at courts at time of inspection 10-13-25 PS Crew working on site cleanup and preparing for next court pour 10-28-25 PS Crews on site with Tarkett continue working on court construction. 10-30-25 PS Crew on site working on site grading around pickle ball courts 11-07-25 JS Crew on site poured two sections of concrete one between the courts and one in-front of the courts. 11-21-25 PS No activity on site today due to weather 1-28-26 PS Made site visit, no inspections for FEI today 1/30/26 PS Made site visit, no inspections for FEI today 2/9/26 PS Made site visit, no inspections for FEI today 3/2/26 PS Made site visit, electrical contractors non site working, no inspections for FEI
Erosion Control Inspection Partial 3/17/2026 3/17/2026 03/17/2026
Misc
Informational
02/09/2026
10-8-25 PS Erosion control is within compliance and set per approved plans at time of inspection 11-12-25 PS Erosion control is within compliance at time of inspection. 11-20-25 PS Erosion control within compliance at time of inspection 12-5-25 PS Erosion control within compliance, ensure to monitor trucks leaving site with soils piles that mud doesn't track passed construction entrance 12-15-25 PS Erosion control within compliance at time of inspection 12-22-25 PS Erosion control within compliance at time of inspection 1-12-26 PS Erosion control within compliance at time of inspection 2-9-26 PS Erosion control within compliance at time of inspection
Rough Electrical Inspection - Commercial Passed 3/18/2026 03/18/2026
Underground Electrical Inspection - Commercial Failed 3/18/2026 03/18/2026
E300.5 Underground Installations
Corrective Action Required
03/18/2026
- NO INSPECTION OF ELECTRICAL OF BASES OF 3 LIGHT POLE AT SIDEWALK NEAR PARKING LOT.
Piers/Caissons Inspection - Commercial Failed 3/18/2026 03/18/2026
Miscellaneous Correction
Resolved
03/18/2026
- Upload light pole base detail to permit.
Misc
Resolved
03/18/2026
Piers Approved: 6 Pers for light poles in middle of South courts.
Misc
Resolved
03/18/2026
12 light pole bases, 4 around shade structure and 4 in west side and 4 on East side of court’s Approved
Miscellaneous Correction
Corrective Action Required
01/22/2026
- 3 Light pole bases North on sidewalk near parking lot. Not inspected and not on plans.
Miscellaneous Inspection Failed 3/18/2026 03/18/2026
Misc
Corrective Action Required
03/18/2026
- NO FINAL INSPECTION CALLED IN. - COMPLETE ALL ENGINEERING INSPECTIONS - NO INSPECTION OF ELECTRICAL OF BASES OF 3 LIGHT POLE AT SIDEWALK NEAR PARKING LOT. - upload third party inspection on torq specs of shade structure. - 3 Light pole bases North on sidewalk near parking lot. Not inspected and not on plans.
Sidewalk Inspection Partial 3/18/2026 3/18/2026 03/18/2026
Misc
Informational
12/22/2025
11-12-25 PS partial pre pour for shared use sidewalk, forms in place and aggregate compacted with rebar placement 11-17-25 PS Contractor pouring sidewalk on north side of pickleball courts, partial pour 12-22-25 PS Remainder of sidewalk on north side has been poured 3/18/26 PS Sidewalk that runs east/west connecting parking lot to pickleball courts have been verified to meet requirements. See plans, missing sidewalk that runs north/south connecting new pickleball sidewalk to existing sidewalk at community center. Ensure a pre pour inspection is scheduled prior to pour of concrete.
Documents & Images
Date Uploaded File Type Document Name
09/10/2025 Activity Document Project Schedule_PRCOM20253864
09/10/2025 Engineers Estimate Cost Estimate_PRCOM20253864
09/10/2025 Specifications Project Manual_PRCOM20253864
09/10/2025 Plans Construction Plans_PRCOM20253864
12/19/2024 Letter Pre-Application Meeting Summary
09/12/2025 Plans Shade structure sealed sheet 1_PRCOM20253864
09/12/2025 Plans Shade structure sealed sheet 2_PRCOM20253864
09/12/2025 Engineer Report/Study Shade structure calcs 1_PRCOM20253864
09/12/2025 Engineer Report/Study Shade structure calcs 2_PRCOM20253864
09/12/2025 Scope of Work Scope of Work_QuesTec_PRCOM20253864
09/12/2025 Application Form Commercial Permit Application_QuesTec_PRCOM20253864
09/12/2025 Application Form Commerical Permit Application_Full project_PRCOM20253864
09/15/2025 Approved Plans Approved hex canopy plan
09/15/2025 Approved Plans Approved rect canopy plan
09/18/2025 Letter IPR Rejection
09/22/2025 Engineer Report/Study Micro Storm Study_Longview Pickleball Complex
09/22/2025 LC License Certificate3
09/22/2025 Plans Construction Plans_Rev 0_PRCOM20253864
09/23/2025 Letter DS Building Permit
09/25/2025 Receipt Receipt for transaction: 2025-007349
09/26/2025 Letter INSPECTION SUMMARY
09/30/2025 Letter INSPECTION SUMMARY
09/30/2025 Letter INSPECTION SUMMARY
10/03/2025 Letter INSPECTION SUMMARY
10/03/2025 Letter INSPECTION SUMMARY
10/03/2025 Letter INSPECTION SUMMARY
10/06/2025 Letter INSPECTION SUMMARY
10/06/2025 Letter INSPECTION SUMMARY
10/06/2025 Letter INSPECTION SUMMARY
10/08/2025 Letter INSPECTION SUMMARY
10/08/2025 Letter INSPECTION SUMMARY
10/08/2025 Letter INSPECTION SUMMARY
10/13/2025 Letter INSPECTION SUMMARY
10/13/2025 Letter INSPECTION SUMMARY
10/13/2025 Letter INSPECTION SUMMARY
10/13/2025 Letter INSPECTION SUMMARY
10/13/2025 Letter INSPECTION SUMMARY
10/13/2025 Letter INSPECTION SUMMARY
10/21/2025 Letter INSPECTION SUMMARY
10/21/2025 Letter IPR Rejection
10/21/2025 Letter INSPECTION SUMMARY
10/21/2025 Letter INSPECTION SUMMARY
10/21/2025 Letter INSPECTION SUMMARY
10/21/2025 Letter INSPECTION SUMMARY
10/27/2025 Letter INSPECTION SUMMARY
10/27/2025 Letter INSPECTION SUMMARY
10/27/2025 Letter INSPECTION SUMMARY
10/27/2025 Letter INSPECTION SUMMARY
10/27/2025 Letter INSPECTION SUMMARY
10/28/2025 Letter INSPECTION SUMMARY
10/28/2025 Letter INSPECTION SUMMARY
10/28/2025 C500 PRIVATE WATER SERVICE LINE EXTENSION PLAN
10/30/2025 Letter INSPECTION SUMMARY
10/30/2025 Letter INSPECTION SUMMARY
10/30/2025 Letter INSPECTION SUMMARY
11/03/2025 Approved Plans Approved private water line extension plan_PRCOM20253864
11/05/2025 Letter INSPECTION SUMMARY
11/05/2025 Letter INSPECTION SUMMARY
11/05/2025 Letter INSPECTION SUMMARY
11/05/2025 Letter INSPECTION SUMMARY
11/05/2025 Letter INSPECTION SUMMARY
11/07/2025 Letter INSPECTION SUMMARY
11/07/2025 Letter INSPECTION SUMMARY
11/12/2025 Letter INSPECTION SUMMARY
11/12/2025 Letter INSPECTION SUMMARY
11/17/2025 Letter INSPECTION SUMMARY
11/17/2025 Letter INSPECTION SUMMARY
11/17/2025 Letter INSPECTION SUMMARY
11/18/2025 Letter INSPECTION SUMMARY
11/18/2025 Letter INSPECTION SUMMARY
11/19/2025 Letter INSPECTION SUMMARY
11/20/2025 Letter INSPECTION SUMMARY
11/20/2025 Letter INSPECTION SUMMARY
11/20/2025 Letter INSPECTION SUMMARY
11/21/2025 Letter INSPECTION SUMMARY
11/24/2025 Letter INSPECTION SUMMARY
11/24/2025 Letter INSPECTION SUMMARY
11/25/2025 Letter INSPECTION SUMMARY
11/25/2025 Letter INSPECTION SUMMARY
12/05/2025 Letter INSPECTION SUMMARY
12/05/2025 Letter INSPECTION SUMMARY
12/05/2025 Letter INSPECTION SUMMARY
12/15/2025 Letter INSPECTION SUMMARY
12/15/2025 Letter INSPECTION SUMMARY
12/22/2025 Letter INSPECTION SUMMARY
12/22/2025 Letter INSPECTION SUMMARY
12/22/2025 Letter INSPECTION SUMMARY
01/12/2026 Letter INSPECTION SUMMARY
01/22/2026 Letter INSPECTION SUMMARY
01/22/2026 Letter INSPECTION SUMMARY
01/28/2026 Letter INSPECTION SUMMARY
01/30/2026 Letter INSPECTION SUMMARY
02/05/2026 Letter INSPECTION SUMMARY
02/09/2026 Letter INSPECTION SUMMARY
02/09/2026 Letter INSPECTION SUMMARY
02/25/2026 Letter INSPECTION SUMMARY
03/02/2026 Letter INSPECTION SUMMARY
03/17/2026 Letter INSPECTION SUMMARY
03/18/2026 Letter INSPECTION SUMMARY
03/18/2026 Letter INSPECTION SUMMARY
03/18/2026 Letter INSPECTION SUMMARY
03/18/2026 Letter INSPECTION SUMMARY
03/18/2026 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home