Summary
PRCOM20251411
Building Permit - Commercial
Issued
NEW MULTI-FAMILY
THE REUNION AT BLACKWELL - BUILDING 28, TYPE C 4-PLEX PLAN REVIEW COMPLETED UNDER PRCOM20250089
04/09/2025
06/30/2025
Locations
Contacts
Avital Homes, LLC, Address:7500 W 151st Street, #23100, Phone:(816) 914-7128  
RED DOG ELECTRIC SERVICES, Address:PO BOX 1, Phone:(913) 208-4816  
APEX HEATING & AIR CONDITIONING INC, Address:1202 NW EAGLE RIDGE BLVD, Phone:(816) 228-2739  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
COLLINS WEBB ARCHITECTURE LLC, Address:307 SW MARKET ST, Unit A, Phone:(816) 249-2270  
Doug Jenson - Avital Homes, Phone:(816) 266-0685  
Reviews
Review Type Outcome Est. Completion Date Completed
Final Development Plan Review Approved 04/14/2025 03/31/2025
Mike Weisenborn
Building Plan Review Approved with Conditions 04/14/2025 03/31/2025
Mike Weisenborn
Miscellaneous Correction
Resolved
06/20/2025

Foundation and underlsab plumbing only released at this time. Substantial completion on the santiary and water before private connections can be made. Full access and live hydrants required prior to release of vertical construction.
Licensed Contractors Approved 04/14/2025 03/31/2025
Mike Weisenborn
Fees
Paid Fees Amount Paid Owing Date Paid
Water Tap Fee $10,595.00 $10,595.00 Paid 06/30/2025
Water Meter Fee $1,066.76 $1,066.76 Paid 06/30/2025
Sanitary Sewer Development Fee $6,101.00 $6,101.00 Paid 06/30/2025
Residential Excise Tax Fee $2,480.64 $2,480.64 Paid 06/30/2025
Valuation Fee for New 3 or 4 Family $4,451.71 $4,451.71 Paid 06/30/2025
Outstanding Fees Amount Paid Owing Date Paid
Not Ready Inspection Fee $75.00 $0.00 $75.00 Not Paid
Not Ready Inspection Fee $75.00 $0.00 $75.00 Not Paid


$150.00    Add Fees to My Cart
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Piers/Caissons Inspection - Commercial Pending
Water Service Inspection Pending
Above Ceiling Inspection Pending
Erosion Control Inspection Residential Pending
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
10/10/2025
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Misc
Corrective Action Required
10/10/2025
Erosion control not in compliance -dirt and rock in street -silt fence downed around lot -lot access shall be maintained to allow parking and unloading that prevents tracking of mud and materials onto street
Rated Assembly Inspection Pending
All Rough Inspection - Commercial Pending
Misc
Corrective Action Required
03/31/2026
All -Address siding at grade issue 615 617 619 621 -repair floor under shower/tub walls to provide full bearing (both bathrooms) -support supply vent duct up off of bath vent in primary bedroom (not done)
Footing Inspection - Commercial Partial 10/3/2025 10/3/2025 10/03/2025
Misc
Informational
10/03/2025
Footing okay to pour
Footing Inspection - Commercial Failed 10/10/2025 10/10/2025 10/10/2025
Misc
Informational
10/03/2025
Footing okay to pour
Misc
Corrective Action Required
10/10/2025
Inspection denied, see erosion control inspection
Erosion Control Inspection Residential Failed 10/10/2025 10/10/2025 10/10/2025
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
10/10/2025
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Misc
Corrective Action Required
10/10/2025
Erosion control not in compliance -dirt and rock in street -silt fence downed around lot -lot access shall be maintained to allow parking and unloading that prevents tracking of mud and materials onto street
Footing Inspection - Commercial Partial 10/14/2025 10/14/2025 10/14/2025
Misc
Informational
10/10/2025
Footing okay to pour Stem wall okay
Misc
Resolved
10/14/2025
Inspection denied, see erosion control inspection
Sewer Service Inspection Passed 10/31/2025 10/31/2025
Misc
Informational
10/31/2025
10-30-25 Dustin A, 6 inch sewer service is installed with tracer wire and clean out
Underslab Plumbing Inspection - Commercial Passed 11/12/2025 11/12/2025 11/12/2025
Underslab Electrical Inspection - Commercial Passed 11/12/2025 11/12/2025 11/12/2025
Footing Inspection - Commercial Passed 11/24/2025 11/24/2025 11/24/2025
Misc
Resolved
11/24/2025
Footing okay to pour Stem wall okay
Rated Assembly Inspection Partial 1/26/2026 1/26/2026 01/26/2026
Informational
01/26/2026
-Nail pattern passed inspection
All Rough Inspection - Commercial Not Ready 3/19/2026 3/19/2026 03/19/2026
Misc
Corrective Action Required
03/19/2026
Inspection stopped framer still working on trusses NOT A COMPLETE INSPECTION 615 -support bath vents -provide plumbing protection 2” above bottom plate entry bath -seal top plate penetration at electrical panel -nail double truss together to plans above great room to front bedroom -separation all 10’ fireblocking to be contentious floor to ceiling (see primary bedroom) -pluming for primary bedroom vanity needs to be moved to furred out wall not to be in separation wall Inspection stopped
Electrical Service Inspection Passed 3/23/2026 3/23/2026 03/23/2026
All Rough Inspection - Commercial Failed 3/25/2026 3/25/2026 03/25/2026
Misc
Corrective Action Required
03/19/2026
All -Address siding from grade -securement of all NM in attic space shall not be greater than 4 1/2’ -support all hvac return and supply ducts in attic off all wiring and plumbing 615 617 -fire block separation wall at ceiling height difference 617/619 -fireblock wall space to ceiling space at rear wall primary bedroom -putty packs must cover entire box 617/ 619 great room -support dwv in attic space near dryer vent -address over board & notched studs in laundry room for dwv 619 -dwv at laundry bottom plate(wall needs moved or furred out and protection for dwv) -fire block wall space to ceiling space at rear primary bedroom -remove trash and debris from separation wall all behind vanities 619/621 621 -seal top plate penetration rear garage wall -repair floor under shower/tub walls to provide full bearing (both bathrooms) -support return air duct up off of dwv near primary bedroom entry in attic space -support supply vent duct up off of NM wires in attic space near rear door -fireblock top of furr out pantry wall to ceiling space -seal top plate penetrations in entry bathroom -missing nut for rear hold down device under double truss
All Rough Inspection - Commercial Failed 3/27/2026 3/27/2026 03/27/2026
Misc
Corrective Action Required
03/25/2026
All -Address siding at grade issue 615 617 619 -laundry space at fur out, need to reset electrical box 621 -repair floor under shower/tub walls to provide full bearing (both bathrooms) -support supply vent duct up off of bath vent in primary bedroom
All Rough Inspection - Commercial Not Ready 3/31/2026 3/31/2026 03/31/2026
Misc
Corrective Action Required
03/27/2026
All -Address siding at grade issue 615 617 619 621 -repair floor under shower/tub walls to provide full bearing (both bathrooms) -support supply vent duct up off of bath vent in primary bedroom (not done)
Documents & Images
Date Uploaded File Type Document Name
06/30/2025 Receipt Receipt for transaction:2025-005063
06/30/2025 Letter DS Building Permit
03/31/2025 Approved Plans Approved plans V1
03/06/2025 Approved Plans Approved plans V2
10/03/2025 Letter INSPECTION SUMMARY
10/10/2025 Letter INSPECTION SUMMARY
10/10/2025 Letter INSPECTION SUMMARY
10/14/2025 Letter INSPECTION SUMMARY
10/17/2025 Approved Plans Approved Bldg C Trusses
10/17/2025 Approved Plans Building C truss Seals All C buildngs_STAND REVIEWED
10/31/2025 Letter INSPECTION SUMMARY
11/05/2025 Approved Plans Approved G111
11/12/2025 Letter INSPECTION SUMMARY
11/12/2025 Letter INSPECTION SUMMARY
11/12/2025 Approved Plans Approved Truss repair
11/17/2025 Approved Plans Truss repair doc
11/24/2025 Letter INSPECTION SUMMARY
11/24/2025 Letter INSPECTION SUMMARY
12/08/2025 Approved Plans Approved E200 revision
01/26/2026 Letter INSPECTION SUMMARY
02/09/2026 Approved Plans REUNION GRADING PLA
03/19/2026 Letter INSPECTION SUMMARY
03/23/2026 Letter INSPECTION SUMMARY
03/25/2026 Letter INSPECTION SUMMARY
03/27/2026 Letter INSPECTION SUMMARY
03/31/2026 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.