Permit Application Status

PRCOM20246113


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20246113
Building Permit - Commercial
In Plan Review
DPLS P1 LLC
NEW MULTI-FAMILY
DISCOVERY PARK LOT 10 - 3 STORY APARTMENT BUILDING WITH PARKING BENEATH APARTMENTS - VA PARKING - IIB
11/21/2024
07/09/2025
Locations
Contacts
DPLS P1 LLC, Address:4220 PHILIPS FARM RD  
Intrinsic Development, L.L.C., Address:3622 Endeavor Ave., Ste. 101  
Earl Peterson - Intrinsic Development, Phone:(573) 970-8867  
  
  
  
ROSEMANN & ASSOCIATES, Address:1526 GRAND BLVD, Phone:(816) 472-1448  
UES dba GEOTECHNOLOGY LLC, Address:5055 ANTIOCH RD, Phone:(913) 438-1900  
Reviews
Review Type Outcome Est. Completion Date Completed
Special Inspections Review Approved 03/05/2025
Joe Frogge
Fire Plan Review Approved 01/30/2025 01/30/2025
Craig Hill
Construction documents for fire alarm systems
Corrective Action Required
01/23/2025

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Provide deferred submittal for alarm system.
Construction documents - Fire protection systems
Corrective Action Required
01/23/2025

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Provide deferred submittal for protection system.
Building Plan Review Rejected 01/30/2025 01/30/2025
Joe Frogge
Final Development Plan
Resolved
01/30/2025

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational.
Project cost
Corrective Action Required
01/23/2025

The project cost, which is used to establish the permit fee, has not been provided. Action required: Comment is informational. 1/30/2025 - Acknowledged in letter.
License Tax - Payment
Corrective Action Required
01/23/2025

A one-time impact fee in the form of a license tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is for informational purposes. The fee will be $24,186.24. 1/30/2025 - Acknowledged in letter.
IBC 1704.2 Special Inspections
Resolved
03/05/2025

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections. 1/30/2025 - Acknowledged in letter.
Elevator Equipment Permit
Corrective Action Required
01/23/2025

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is informational. 1/30/2025 - Acknowledged in letter.
Elevator Equipment Inspection
Corrective Action Required
01/23/2025

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Action required: Comment is informational. 1/30/2025 - Acknowledged in letter.
Elevator Certificate of Inspection
Corrective Action Required
01/23/2025

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is informational. 1/30/2025 - Acknowledged in letter.
IBC 1803.1 General - geotech
Resolved
01/30/2025

2018 IBC 1803.1 General. Geotechnical investigations shall be conducted in accordance with Section 1803.2 and reported in accordance with Section 1803.6. Where required by the building official or where geotechnical investigations involve in-situ testing, laboratory testing or engineering calculations, such investigations shall be conducted by a registered design professional. Action required: Letter from structural engineer cited on sheet S001 not found. Provide letter to verify use of 6,000psf piers.
IBC 1207.1 Minimum room widths
Resolved
01/30/2025

2018 IBC 1207.1 Minimum room widths. Habitable spaces, other than a kitchen, shall be not less than 7 feet in any plan dimension. Kitchens shall have a clear passageway of not less than 3 feet between counter fronts and appliances or counter fronts and walls. Action required: Modify Den in Hurley Corner units. (re: A1/A409)
Licensed Contractors Rejected 01/30/2025 01/30/2025
Joe Frogge
LC - MEP Subs
Corrective Action Required
01/23/2025

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 1/30/2025 - Acknowledged in letter.
Final Development Plan Review Approved 01/13/2025 01/13/2025
Daniel Fernandez
Fire Plan Review Rejected 01/10/2025 01/09/2025
Craig Hill
Construction documents for fire alarm systems
Corrective Action Required
01/08/2025

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Provide deferred submittal for alarm system.
Construction documents - Fire protection systems
Corrective Action Required
01/08/2025

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Provide deferred submittal for protection system.
Misc
Corrective Action Required
01/08/2025

Provide Single Station alarms in the small room of the "Conway III" appartments.
Portable fire extinguishers - conspicuous locations
Corrective Action Required
01/08/2025

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. Action Required: Provide extinguishers in the parging garage.
Miscellaneous Correction
Corrective Action Required
01/08/2025

Building Plan Review Rejected 01/10/2025 01/09/2025
Joe Frogge
Final Development Plan
Corrective Action Required
01/08/2025

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational.
Project cost
Corrective Action Required
01/08/2025

The project cost, which is used to establish the permit fee, has not been provided. Action required: Comment is informational.
License Tax - Payment
Corrective Action Required
01/08/2025

A one-time impact fee in the form of a license tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is for informational purposes. The fee will be $24,186.24.
IBC 1704.2 Special Inspections
Corrective Action Required
01/08/2025

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
Elevator Equipment Permit
Corrective Action Required
01/08/2025

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is informational.
Elevator Equipment Inspection
Corrective Action Required
01/08/2025

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Action required: Comment is informational.
Elevator Certificate of Inspection
Corrective Action Required
01/08/2025

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is informational.
IBC 1803.1 General - geotech
Corrective Action Required
01/08/2025

2018 IBC 1803.1 General. Geotechnical investigations shall be conducted in accordance with Section 1803.2 and reported in accordance with Section 1803.6. Where required by the building official or where geotechnical investigations involve in-situ testing, laboratory testing or engineering calculations, such investigations shall be conducted by a registered design professional. Action required: Letter from structural engineer cited on sheet S001 not found. Provide letter to verify use of 6,000psf piers.
IBC 1207.1 Minimum room widths
Corrective Action Required
01/09/2025

2018 IBC 1207.1 Minimum room widths. Habitable spaces, other than a kitchen, shall be not less than 7 feet in any plan dimension. Kitchens shall have a clear passageway of not less than 3 feet between counter fronts and appliances or counter fronts and walls. Action required: Modify Den in Hurley Corner units. (re: A1/A409)
Licensed Contractors Rejected 01/10/2025 01/08/2025
Joe Frogge
LC - MEP Subs
Corrective Action Required
01/08/2025

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Alarm Plan Review Pending
Craig Hill
Sprinkler Plan Review Pending
Craig Hill
Fees
Paid Fees Amount Paid Owing Date Paid
None $0.00 $0.00 $0.00
Outstanding Fees Amount Paid Owing Date Paid
91100C8-Sanitary Sewer Insp Fees $181.95 $0.00 $181.95 Not Paid
91100C9-Water Insp Fee $1,030.50 $0.00 $1,030.50 Not Paid
9110068-Storm Fee $1,725.90 $0.00 $1,725.90 Not Paid
9110081-Paved Surface Inspection Fee $17,793.18 $0.00 $17,793.18 Not Paid
9110071-Site Grading Fee $675.00 $0.00 $675.00 Not Paid
9110072-Water Test Fee $200.00 $0.00 $200.00 Not Paid
8331401-Water Tap Fee $52,970.00 $0.00 $52,970.00 Not Paid
8350015-Water Meter Fee $7,759.92 $0.00 $7,759.92 Not Paid
8331507-Sanitary Sewer Development Fee $30,482.00 $0.00 $30,482.00 Not Paid


$112,818.45    Add Fees to My Cart
Inspections

There are no inspections for this permit application.

Documents & Images
Date Uploaded File Type Document Name
12/16/2024 Application Form 140 NE Alura Way - Application
12/23/2024 Plans 24-1220_DPLS-Lot 10B_CITY SUBMITTAL_COMBINED
12/23/2024 Specifications 24-1220 DPLS_10B Specifications_Volume 1
12/23/2024 Specifications 24-1220 DPLS_10B Specifications_Volume 2
12/27/2024 Letter License Tax Bill
01/10/2025 Letter DS P/R Corrections Document
01/23/2025 Letter DPLS_Lot 10B_Round 1 Response
01/23/2025 Letter DPLS_Lot10B_narrative_Add #1
01/23/2025 Plans 25-0122_DPLS Lot 10B_ADD #1_COMBINED
02/04/2025 Plans 25-0204_DPLS_Lot10B_Combined Plans
02/04/2025 Approved Plans Approved Construction Plans
03/05/2025 Engineer Report/Study PRCOM20246113 Discovery Park Lot 10B
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home