Permit Application Status

PRCOM20246060


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20246060
Building Permit - Commercial
In Plan Review
DPLS P1 LLC
NEW SHELL BUILDING
SIGNATURE BUILDING - THE VILLAGE AT DISCOVERY LOT 1 - NEW COMMERCIAL SHELL
11/20/2024
06/04/2025
Locations
Contacts
DPLS P1 LLC, Address:4220 PHILIPS FARM RD  
Intrinsic Development, L.L.C., Address:3622 Endeavor Ave., Ste. 101  
JCHRISTILLES@ROSEMANN.COM  
  
  
  
UES dba GEOTECHNOLOGY LLC, Address:5055 ANTIOCH RD, Phone:(913) 438-1900  
ROSEMANN & ASSOCIATES, Address:1526 GRAND BLVD, Phone:(816) 472-1448  
Reviews
Review Type Outcome Est. Completion Date Completed
Final Development Plan Review Approved 01/03/2025 01/03/2025
Daniel Fernandez
Special Inspections Review Approved 12/27/2024
Joe Frogge
Fire Plan Review Approved 12/19/2024 12/17/2024
Craig Hill
Building Plan Review Rejected 12/19/2024 12/17/2024
Joe Frogge
Final Development Plan
Resolved
02/03/2025

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational. 12/16/2024 - Acknowledged in letter.
IBC 1704.2 Special Inspections
Resolved
12/27/2024

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections. 12/16/2024 - Acknowledged in letter.
Elevator Equipment Permit
Corrective Action Required
12/12/2024

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is informational. 12/16/2024 - Acknowledged in letter.
Elevator Equipment Inspection
Corrective Action Required
12/12/2024

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Action required: Comment is informational. 12/16/2024 - Acknowledged in letter.
Elevator Certificate of Inspection
Corrective Action Required
12/12/2024

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is informational. 12/16/2024 - Acknowledged in letter.
Gen - Plan submittals 2018 codes
Resolved
12/16/2024

All plans submitted for review on or after April 1, 2019 shall be designed to the requirements of the 2018 International Building Code, 2018 International Mechanical Code, 2018 International Plumbing Code, 2018 International Fuel Gas Code, 2018 International Fire Code, 2017 National Electric Code and the ICC/ANSI A117.1-2009 as amended and adopted by the City of Lee’s Summit. Action required: Amend P40 wall assembly to show correct code year.
Miscellaneous Correction
Resolved
12/16/2024

Inadequate information to complete review. Provide the following: - Wall and UL construction details for P62. (see sheet A-102) - UL wall assembly details for u423. - UL floor assembly details for F32 - Clarify fire rating at wall around Mech/Maint Room 2002. G-100 shows it surrounded by 1 hour partition but door isn't rated and wall grille doesn't have a fire damper.
IBC 716.2 Fire and Smoke Protection - fire door assemblies
Resolved
12/16/2024

2018 IBC 716.2.2 Performance requirements. Fire door assemblies shall be installed in the assemblies specified in Table 716.1(2) and shall comply with the fire protection rating specified. Action required: Amend door schedule on A-600 to show that door 2002 is rated for 45 minutes and show that doors S1-2 & S2-2 are both rated for 60 minutes.
Miscellaneous Correction
Resolved
12/16/2024

Roof hatch does not seem to be reflected in structural drawings. Action required: Clarify.
IMC 306.5 Equipment on roofs
Resolved
12/16/2024

2018 IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment requiring access or appliances are located on an elevated structure or the roof of a building such that personnel will have to climb higher than 16 feet above grade to access such equipment or appliances, an interior or exterior means of access shall be provided. Such access shall not require climbing over obstructions greater than 30 inches in height or walking on roofs having a slope greater than 4 units vertical in 12 units horizontal. Such access shall not require the use of portable ladders. Where access involves climbing over parapet walls, the height shall be measured to the top of the parapet wall. Permanent ladders installed to provide the required access shall comply with the following minimum design criteria: 1. The side railing shall extend above the parapet or roof edge not less than 30" (see code section for additional construction requirements) Action required: Provide permanent ladder at roof hatch.
NEC Article 250.66 Size of AC Grounding electrode conductor
Resolved
12/16/2024

2017 NEC Article 250.66 Size of Alternating-Current Grounding Electrode Conductor. The size of the grounding electrode conductor at the service, at each building or structure where supplied by a feeder(s) or branch circuit(s), or at a separately derived system of a grounded or ungrounded ac system shall not be less than given in Table 250.66, except as permitted in 250.66(A) through (C). Action required: Provide sizes for all grounding electrode conductors.
Licensed Contractors Rejected 12/19/2024 12/16/2024
Joe Frogge
LC - MEP Subs
Corrective Action Required
12/12/2024

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 12/16/2024 - Acknowledged in letter.
Fire Plan Review Approved 12/06/2024 12/03/2024
Craig Hill
Construction documents for fire alarm systems
Corrective Action Required
12/03/2024

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Provide deferred submittal for alarm system.
Construction documents - Fire protection systems
Corrective Action Required
12/03/2024

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Provide deferred submittal for protection system.
Building Plan Review Rejected 12/06/2024 12/03/2024
Joe Frogge
Final Development Plan
Corrective Action Required
12/03/2024

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational.
IBC 1704.2 Special Inspections
Corrective Action Required
12/03/2024

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
Elevator Equipment Permit
Corrective Action Required
12/03/2024

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is informational.
Elevator Equipment Inspection
Corrective Action Required
12/03/2024

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Action required: Comment is informational.
Elevator Certificate of Inspection
Corrective Action Required
12/03/2024

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is informational.
Gen - Plan submittals 2018 codes
Corrective Action Required
12/03/2024

All plans submitted for review on or after April 1, 2019 shall be designed to the requirements of the 2018 International Building Code, 2018 International Mechanical Code, 2018 International Plumbing Code, 2018 International Fuel Gas Code, 2018 International Fire Code, 2017 National Electric Code and the ICC/ANSI A117.1-2009 as amended and adopted by the City of Lee’s Summit. Action required: Amend P40 wall assembly to show correct code year.
Miscellaneous Correction
Corrective Action Required
12/03/2024

Inadequate information to complete review. Provide the following: - Wall and UL construction details for P62. (see sheet A-102) - UL wall assembly details for u423. - UL floor assembly details for F32 - Clarify fire rating at wall around Mech/Maint Room 2002. G-100 shows it surrounded by 1 hour partition but door isn't rated and wall grille doesn't have a fire damper.
IBC 716.2 Fire and Smoke Protection - fire door assemblies
Corrective Action Required
12/03/2024

2018 IBC 716.2.2 Performance requirements. Fire door assemblies shall be installed in the assemblies specified in Table 716.1(2) and shall comply with the fire protection rating specified. Action required: Amend door schedule on A-600 to show that door 2002 is rated for 45 minutes and show that doors S1-2 & S2-2 are both rated for 60 minutes.
Miscellaneous Correction
Corrective Action Required
12/03/2024

Roof hatch does not seem to be reflected in structural drawings. Action required: Clarify.
IMC 306.5 Equipment on roofs
Corrective Action Required
12/03/2024

2018 IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment requiring access or appliances are located on an elevated structure or the roof of a building such that personnel will have to climb higher than 16 feet above grade to access such equipment or appliances, an interior or exterior means of access shall be provided. Such access shall not require climbing over obstructions greater than 30 inches in height or walking on roofs having a slope greater than 4 units vertical in 12 units horizontal. Such access shall not require the use of portable ladders. Where access involves climbing over parapet walls, the height shall be measured to the top of the parapet wall. Permanent ladders installed to provide the required access shall comply with the following minimum design criteria: 1. The side railing shall extend above the parapet or roof edge not less than 30" (see code section for additional construction requirements) Action required: Provide permanent ladder at roof hatch.
NEC Article 250.66 Size of AC Grounding electrode conductor
Corrective Action Required
12/03/2024

2017 NEC Article 250.66 Size of Alternating-Current Grounding Electrode Conductor. The size of the grounding electrode conductor at the service, at each building or structure where supplied by a feeder(s) or branch circuit(s), or at a separately derived system of a grounded or ungrounded ac system shall not be less than given in Table 250.66, except as permitted in 250.66(A) through (C). Action required: Provide sizes for all grounding electrode conductors.
Licensed Contractors Rejected 12/06/2024 12/03/2024
Joe Frogge
LC - MEP Subs
Corrective Action Required
12/03/2024

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Alarm Plan Review Pending
Craig Hill
Sprinkler Plan Review Pending
Craig Hill
Fees
Paid Fees Amount Paid Owing Date Paid
None $0.00 $0.00 $0.00
Outstanding Fees Amount Paid Owing Date Paid
91100C8-Sanitary Sewer Insp Fees $210.00 $0.00 $210.00 Not Paid
91100C9-Water Insp Fee $810.30 $0.00 $810.30 Not Paid
9110068-Storm Fee $1,371.60 $0.00 $1,371.60 Not Paid
9110081-Paved Surface Inspection Fee $12,992.06 $0.00 $12,992.06 Not Paid
9110071-Site Grading Fee $1,480.80 $0.00 $1,480.80 Not Paid
9110072-Water Test Fee $200.00 $0.00 $200.00 Not Paid
8331401-Water Tap Fee $52,970.00 $0.00 $52,970.00 Not Paid
8350015-Water Meter Fee $7,759.92 $0.00 $7,759.92 Not Paid
8331507-Sanitary Sewer Development Fee $30,482.00 $0.00 $30,482.00 Not Paid


$108,276.68    Add Fees to My Cart
Inspections

There are no inspections for this permit application.

Documents & Images
Date Uploaded File Type Document Name
11/21/2024 Plans 24-1121-DPLS - Lot 1_City Submittal
11/21/2024 Application Form 24-1121 - DPLS_Lot 1_Commercial Permit Application
11/21/2024 Specifications 24-1120 The Village at Discovery -Lot 1 Specs
12/06/2024 Letter DS P/R Corrections Document
12/12/2024 Plans 24-1212_DPLS Lot 1_City Comments Response_Add #1_Combined
12/12/2024 Letter DPLS_Lot 1_Round 1 Response
12/18/2024 Approved Plans Approved construction plans
12/27/2024 Engineer Report/Study Special Inspections Letter
02/07/2025 Engineer Report/Study SI Letter #1 12-28-2024
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home