Summary
PRCOM20246038
Building Permit - Commercial
Final Completion
NLV MANSION LLC
REPAIR REPLACE UPGRADE
PRIVATE SANITARY SEWER REALIGNMENT
11/18/2024
12/06/2024
05/27/2025
Locations
Contacts
REDFORD CONSTRUCTION INC, Address:PO BOX 1065, Phone:(816) 540-2030  
RE Pannell - Redford Construction, Phone:(913) 290-6789  
Olsson Engineering, Address:1301 Burlington, Suite 100, Phone:(816) 361-1177  
Sunflower Development Group, LLC, Address:Attn: Mark Moberly, Phone:(816) 581-3997  
NLV MANSION LLC, Address:1125 GRAND BLVD STE 202  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 11/25/2024 12/03/2024
Joe Frogge
LC - General Contractor
Resolved
12/03/2024

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Provide the company name of the licensed general contractor and the name, email address & phone number for the on-site contact.
LC - MEP Subs
Resolved
12/03/2024

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Building Plan Review Approved 11/18/2024
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Repair/Replace/Upgrade $171.78 $171.78 Paid 12/03/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Site Visit Failed 5/6/2025 5/6/2025 05/06/2025
Misc
Corrective Action Required
05/06/2025
5-6-25 DP. This job was completed before I had any knowledge of it starting. They just repaired the sewer service from the Longview mansion and installed cleanouts. I doubt any tracer wire was added, and I can not confirm that aggregate was used.
Grading/Excavation/Fill Inspection Passed 5/23/2025 5/23/2025 05/23/2025
Misc
Informational
05/23/2025
5-23-25 DP. Redford replaced the sanitary sewer service to the Longview mansion. Grading was completed and area was hydroseeded.
Site Visit Complete 5/23/2025 5/23/2025 05/23/2025
Misc
Corrective Action Required
05/06/2025
5-6-25 DP. This job was completed before I had any knowledge of it starting. They just repaired the sewer service from the Longview mansion and installed cleanouts. I doubt any tracer wire was added, and I can not confirm that aggregate was used. 5-23-25 DP. Redford replaced the sanitary sewer service for the Longview mansion. They used tracer wire and the area has been hydroseeded.
Final Completion - Field Engineering Final Completion 5/27/2025 05/27/2025
Informational
05/27/2025
All work is complete.
Documents & Images
Date Uploaded File Type Document Name
11/18/2024 Application Form 24-11-18_Longview Mansion Private Sanitary Lateral_Scope of Work
11/18/2024 Plans 24-11-18_Longview Mansion Private Sanitary Lateral_Plans
11/25/2024 Approved Plans Approved sewer plans
12/03/2024 Receipt Receipt for transaction:2024-009256
12/06/2024 Letter DS Building Permit
04/25/2025 Letter Codes 140 Day Letter
05/06/2025 Letter INSPECTION SUMMARY
05/23/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home