Permit Application Status

PRCOM20245940


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20245940
Building Permit - Commercial
In Plan Review
DPLS P1 LLC
NEW COMMERCIAL
VILLAGE AT DISCOVERY PARK LOT #7 - NEW 3 STORY APARTMENT BUILDING WITH OPEN AIR PARKING AND COMMERCIAL SPACE FOR FUTURE TENANTS APARTMENTS - VA PARKING GARAGE - IIA
11/13/2024
05/25/2025
Locations
Contacts
DPLS P1 LLC, Address:4220 PHILIPS FARM RD  
Intrinsic Development, L.L.C., Address:3622 Endeavor Ave., Ste. 101  
Earl Peterson - Intrinsic Development, Phone:(573) 970-8867  
  
  
  
UES dba GEOTECHNOLOGY LLC, Address:5055 ANTIOCH RD, Phone:(913) 438-1900  
ROSEMANN & ASSOCIATES, Address:1526 GRAND BLVD, Phone:(816) 472-1448  
Reviews
Review Type Outcome Est. Completion Date Completed
Special Inspections Review Approved 01/21/2025
Joe Frogge
Final Development Plan Review Approved 12/24/2024 12/24/2024
Daniel Fernandez
Building Plan Review Approved with Conditions 12/11/2024 12/12/2024
Joe Frogge
License Tax - Payment
Corrective Action Required
12/04/2024

A one-time impact fee in the form of a license tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is for informational purposes. The fee will be $25,524.48 12/11/2024 - Acknowledged in letter.
IBC 1704.2 Special Inspections
Resolved
01/21/2025

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections. 12/11/2024 - Acknowledged in letter.
Elevator Equipment Permit
Corrective Action Required
12/04/2024

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is informational. 12/11/2024 - Acknowledged in letter.
Elevator Equipment Inspection
Corrective Action Required
12/04/2024

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Action required: Comment is informational. 12/11/2024 - Acknowledged in letter.
Elevator Certificate of Inspection
Corrective Action Required
12/04/2024

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is informational. 12/11/2024 - Acknowledged in letter.
IBC 706.1 Fire and Smoke Protection - General
Resolved
12/11/2024

2018 IBC 706.1 General. Fire walls shall be constructed in accordance with Sections 706.2 through 706.11. The extent and location of such fire walls shall provide a complete separation. Where a fire wall also separates occupancies that are required to be separated by a fire barrier wall, the most restrictive requirements of each separation shall apply. Action required: Per Table 707.3.10 separation between S-2/A-2 and R-2 above must be 2 hours. This will include any supporting construction.
IBC 1803.1 General - geotech
Resolved
12/11/2024

2018 IBC 1803.1 General. Geotechnical investigations shall be conducted in accordance with Section 1803.2 and reported in accordance with Section 1803.6. Where required by the building official or where geotechnical investigations involve in-situ testing, laboratory testing or engineering calculations, such investigations shall be conducted by a registered design professional. Action required: Clarification required. Design Criteria and Foundation notes on S001 reference a different geotech report and different foundation recommendations than that found in spec volume 1.
Engineered truss package
Corrective Action Required
12/04/2024

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide truss package or request deferral. 12/11/2024 - Deferred per request.
IPC 502.1 Water heater manufacturers installation instructions
Resolved
12/11/2024

2018 IPC 502.1 General. Water heaters shall be installed in accordance with the manufacturer’s installation instructions. Oil-fired water heaters shall conform to the requirements of this code and the International Mechanical Code. Electric water heaters shall conform to the requirements of this code and provisions of NFPA 70. Gas-fired water heaters shall conform to the requirements of the International Fuel Gas Code. Action required: Provide expansion tank at water heaters or provide verification that water heater installed will not require expansion tank in the manufacturer's written instructions.
IPC 604.8 Water pressure reducing valve
Resolved
12/11/2024

2018 IPC 604.8 Water Pressure reducing valve or regulator. Where water pressure within a building exceeds 80 psi static, an approved water-pressure reducing valve conforming to ASSE 1003 or CSA B356 with strainer shall be installed to reduce the pressure in the building water distribution piping to not greater than 80 psi static. Action required: Provide pressure reducing valve at water entry. (Our Water Department requires PRV installation in all locations regardless of pressure)
Licensed Contractors Rejected 12/11/2024 12/11/2024
Joe Frogge
LC - General Contractor
Resolved
12/11/2024

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and the name, email address & phone number for the on-site contact.
LC - MEP Subs
Corrective Action Required
12/04/2024

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Approved with Conditions 12/11/2024 12/11/2024
Craig Hill
Construction documents for fire alarm systems
Corrective Action Required
12/04/2024

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Provide deferred submittal for fire alarm system.
Construction documents - Fire protection systems
Corrective Action Required
12/04/2024

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Provide deferred submittal for protection system.
Portable fire extinguishers - general
Corrective Action Required
12/04/2024

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Information Only
Key boxes for non-standardized fire service elevator keys
Corrective Action Required
12/04/2024

2018 IFC 506.1.2 Key boxes for non-standardized fire service elevator keys. Key boxes provided for non-standardized fire service elevator keys shall comply with Section 506.1 and 506.2 or as approved by the fire code official.
Fire Plan Review Approved with Conditions 11/27/2024 11/26/2024
Craig Hill
Construction documents for fire alarm systems
Corrective Action Required
11/25/2024

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Provide deferred submittal for fire alarm system.
Construction documents - Fire protection systems
Corrective Action Required
11/25/2024

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Provide deferred submittal for protection system.
Portable fire extinguishers - general
Corrective Action Required
11/25/2024

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Information Only
Key boxes for non-standardized fire service elevator keys
Corrective Action Required
11/26/2024

2018 IFC 506.1.2 Key boxes for non-standardized fire service elevator keys. Key boxes provided for non-standardized fire service elevator keys shall comply with Section 506.1 and 506.2 or as approved by the fire code official.
Building Plan Review Rejected 11/27/2024 11/26/2024
Joe Frogge
License Tax - Payment
Corrective Action Required
11/25/2024

A one-time impact fee in the form of a license tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is for informational purposes. The fee will be $
IBC 1704.2 Special Inspections
Corrective Action Required
11/25/2024

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
Elevator Equipment Permit
Corrective Action Required
11/25/2024

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is informational.
Elevator Equipment Inspection
Corrective Action Required
11/25/2024

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Action required: Comment is informational.
Elevator Certificate of Inspection
Corrective Action Required
11/25/2024

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is informational.
IBC 706.1 Fire and Smoke Protection - General
Corrective Action Required
11/25/2024

2018 IBC 706.1 General. Fire walls shall be constructed in accordance with Sections 706.2 through 706.11. The extent and location of such fire walls shall provide a complete separation. Where a fire wall also separates occupancies that are required to be separated by a fire barrier wall, the most restrictive requirements of each separation shall apply. Action required: Per Table 707.3.10 separation between S-2/A-2 and R-2 above must be 2 hours. This will include any supporting construction.
IBC 1803.1 General - geotech
Corrective Action Required
11/25/2024

2018 IBC 1803.1 General. Geotechnical investigations shall be conducted in accordance with Section 1803.2 and reported in accordance with Section 1803.6. Where required by the building official or where geotechnical investigations involve in-situ testing, laboratory testing or engineering calculations, such investigations shall be conducted by a registered design professional. Action required: Clarification required. Design Criteria and Foundation notes on S001 reference a different geotech report and different foundation recommendations than that found in spec volume 1.
Engineered truss package
Corrective Action Required
11/25/2024

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide truss package or request deferral.
IPC 502.1 Water heater manufacturers installation instructions
Corrective Action Required
11/26/2024

2018 IPC 502.1 General. Water heaters shall be installed in accordance with the manufacturer’s installation instructions. Oil-fired water heaters shall conform to the requirements of this code and the International Mechanical Code. Electric water heaters shall conform to the requirements of this code and provisions of NFPA 70. Gas-fired water heaters shall conform to the requirements of the International Fuel Gas Code. Action required: Provide expansion tank at water heaters or provide verification that water heater installed will not require expansion tank in the manufacturer's written instructions.
IPC 604.8 Water pressure reducing valve
Corrective Action Required
11/26/2024

2018 IPC 604.8 Water Pressure reducing valve or regulator. Where water pressure within a building exceeds 80 psi static, an approved water-pressure reducing valve conforming to ASSE 1003 or CSA B356 with strainer shall be installed to reduce the pressure in the building water distribution piping to not greater than 80 psi static. Action required: Provide pressure reducing valve at water entry. (Our Water Department requires PRV installation in all locations regardless of pressure)
Licensed Contractors Rejected 11/27/2024 11/25/2024
Joe Frogge
LC - General Contractor
Corrective Action Required
11/25/2024

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and the name, email address & phone number for the on-site contact.
LC - MEP Subs
Corrective Action Required
11/25/2024

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Alarm Plan Review Pending
Craig Hill
Sprinkler Plan Review Pending
Craig Hill
Fees
Paid Fees Amount Paid Owing Date Paid
None $0.00 $0.00 $0.00
Outstanding Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Commercial $29,600.00 $0.00 $29,600.00 Not Paid
7232302-Residential License Tax Fee $25,524.48 $0.00 $25,524.48 Not Paid
8331401-Water Tap Fee $26,485.00 $0.00 $26,485.00 Not Paid
8350015-Water Meter Fee $3,879.96 $0.00 $3,879.96 Not Paid
8331507-Sanitary Sewer Development Fee $15,241.00 $0.00 $15,241.00 Not Paid


$100,730.44    Add Fees to My Cart
Inspections

There are no inspections for this permit application.

Documents & Images
Date Uploaded File Type Document Name
11/13/2024 Application Form APPLICATION
11/14/2024 Plans 24-1111_DPLS_Lot7_City Submittal
11/14/2024 Specifications The Village at Discovery Lot 7 Spec -Volume 2
11/14/2024 Specifications The Village at Discovery Lot 7 Spec -Volume 1
11/14/2024 Letter License Tax Bill
11/26/2024 Letter DS P/R Corrections Document
12/04/2024 Letter DPLS_Lot 7_Round 1 Response Letter
12/04/2024 Plans 24-1204_DPLS Lot 7 -Add 1
12/11/2024 Plans old construction plans
01/09/2025 Letter 25_0109_DPLS Lot 7 - ADD 002 - Letter to City
01/10/2025 Plans 24-1220_DPLS Lot 7_ADD #2_Combined
01/10/2025 Letter 000007-STRUCTURAL CERTIFICATION PAGE
01/21/2025 Engineer Report/Study SI Letter
02/04/2025 Plans 25-0204_DPLS_Lot7_Combined Drawings
02/04/2025 Approved Plans Approved Construction Plans
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home