Permit Application Status

PRCOM20245921


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20245921
Building Permit - Commercial
Issued
CITY OF LEES SUMMIT
ADDITION COMMERCIAL
LEE'S SUMMIT POLICE AND COURT FACILITY - ALTERATIONS AND ADDITION TO EXISTING POLICE AND COURT FACILITY - INCLUDES 3 CAR PORT CANOPIES
11/12/2024
01/28/2025
05/25/2025
Locations
Contacts
CITY OF LEES SUMMIT, Address:207 SW MARKET ST  
Keith Williams - Titan Built, Phone:(913) 439-8638  
Titan Built, LLC, Address:8207 Melrose Drive, #200  
METRO AIR CONDITIONING , Address:8151 MCCOY ST, Phone:(913) 888-3991  
S & S ELECTRICAL CONTRACTING LLC, Address:574 NW 1921 Rd, Phone:(816) 847-2433  
SALADINO PLUMBING & HEATING COMPANY, Address:2210 TELEVISION PL, Phone:(816) 833-9900  
Chris Krumrei, Hoefer Welker, Vice President, Project Architect, Phone:(913) 307-3700  
Reviews
Review Type Outcome Est. Completion Date Completed
Sprinkler Plan Review Released for Construction 04/25/2025 04/24/2025
Craig Hill
Licensed Contractors Approved 12/17/2024 01/15/2025
Joe Frogge
LC - General Contractor
Resolved
12/13/2024

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Provide the name, email address & phone number for the on-site contact.
LC - MEP Subs
Resolved
01/15/2025

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 12/13/2024 - Acknowledged in letter.
Building Plan Review Approved with Conditions 12/17/2024 01/15/2025
Joe Frogge
Final Development Plan
Resolved
01/15/2025

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational. 12/13/2024 - acknowledged in letter.
Misc
Corrective Action Required
12/10/2024

Inadequate information to complete review. Provide the following: - Complete pier designs for car canopies (including piers) 12/13/2024 - Deferred per request.
IMC 306.5 Equipment on roofs
Resolved
12/13/2024

2018 IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment requiring access or appliances are located on an elevated structure or the roof of a building such that personnel will have to climb higher than 16 feet above grade to access such equipment or appliances, an interior or exterior means of access shall be provided. Such access shall not require climbing over obstructions greater than 30 inches in height or walking on roofs having a slope greater than 4 units vertical in 12 units horizontal. Such access shall not require the use of portable ladders. Where access involves climbing over parapet walls, the height shall be measured to the top of the parapet wall. Permanent ladders installed to provide the required access shall comply with the following minimum design criteria: 1. The side railing shall extend above the parapet or roof edge not less than 30" (see code section for additional construction requirements) Action required: Provide permanent means of access to roof over new addition.
IBC 603.1 Type of Construction - Allowable Materials
Resolved
12/13/2024

2018 IBC 603.1 Allowable Materials. Combustible materials shall be permitted in buildings of Type I or II construction in the following applications and in accordance with Sections 603.1.1 through 603.1.3: (see code for specific examples and exceptions) Action required: Modify parapet detail G6 on A-321 to show that the wooden nailers are fire retardant treated.
IBC 1109.11 Seating at tables, counters and work surfaces - accessibility
Resolved
12/13/2024

2018 IBC 1109.11 Seating at tables, counters and work surfaces. Where seating or standing space at fixed or built-in tables, counters or work surfaces is provided in accessible spaces, at least 5 percent of the seating and standing spaces, but not less than one, shall be accessible. (see code for exception) Action required: Add dimensions to elevations on A-451 to show maximum 34" heights and any counter or work space required to be accessible.
NEC Article 210.63 Heating, air-conditioning and refrigeration outlet
Corrective Action Required
12/10/2024

2017 NEC Article 210.63 Heating, Air-Conditioning, and Refrigeration Equipment Outlet. A 125-volt, single-phase, 15- or 20-ampere-rated receptacle outlet shall be installed at an accessible location for the servicing of heating, air-conditioning, and refrigeration equipment. The receptacle shall be located on the same level and within 25 feet of the heating, air-conditioning, and refrigeration equipment. The receptacle outlet shall not be connected to the load side of the equipment disconnecting means. Action required: Provide receptacle(s) near new roof mounted equipment. 12/13/2024 - per architect this will be covered in hvac spec. To be field verified.
Final Development Plan Review Approved 01/15/2025 01/14/2025
Grant White
Fire Plan Review Approved with Conditions 12/17/2024 12/16/2024
Craig Hill
Construction documents for fire alarm systems
Corrective Action Required
12/10/2024

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Provide deferred submittal for alarm system.
Construction documents - Fire protection systems
Corrective Action Required
12/10/2024

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Provide deferred submittal for protection system.
Building Plan Review Rejected 11/26/2024 11/26/2024
Joe Frogge
Final Development Plan
Corrective Action Required
11/21/2024

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational.
Misc
Corrective Action Required
11/21/2024

Inadequate information to complete review. Provide the following: - Complete pier designs for car canopies (including piers) - Complete light pole base detail
IMC 306.5 Equipment on roofs
Corrective Action Required
11/22/2024

2018 IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment requiring access or appliances are located on an elevated structure or the roof of a building such that personnel will have to climb higher than 16 feet above grade to access such equipment or appliances, an interior or exterior means of access shall be provided. Such access shall not require climbing over obstructions greater than 30 inches in height or walking on roofs having a slope greater than 4 units vertical in 12 units horizontal. Such access shall not require the use of portable ladders. Where access involves climbing over parapet walls, the height shall be measured to the top of the parapet wall. Permanent ladders installed to provide the required access shall comply with the following minimum design criteria: 1. The side railing shall extend above the parapet or roof edge not less than 30" (see code section for additional construction requirements) Action required: Provide permanent means of access to roof over new addition.
IBC 603.1 Type of Construction - Allowable Materials
Corrective Action Required
11/22/2024

2018 IBC 603.1 Allowable Materials. Combustible materials shall be permitted in buildings of Type I or II construction in the following applications and in accordance with Sections 603.1.1 through 603.1.3: (see code for specific examples and exceptions) Action required: Modify parapet detail G6 on A-321 to show that the wooden nailers are fire retardant treated.
IBC 1109.11 Seating at tables, counters and work surfaces - accessibility
Corrective Action Required
11/22/2024

2018 IBC 1109.11 Seating at tables, counters and work surfaces. Where seating or standing space at fixed or built-in tables, counters or work surfaces is provided in accessible spaces, at least 5 percent of the seating and standing spaces, but not less than one, shall be accessible. (see code for exception) Action required: Add dimensions to elevations on A-451 to show maximum 34" heights and any counter or work space required to be accessible.
NEC Article 210.63 Heating, air-conditioning and refrigeration outlet
Corrective Action Required
11/22/2024

2017 NEC Article 210.63 Heating, Air-Conditioning, and Refrigeration Equipment Outlet. A 125-volt, single-phase, 15- or 20-ampere-rated receptacle outlet shall be installed at an accessible location for the servicing of heating, air-conditioning, and refrigeration equipment. The receptacle shall be located on the same level and within 25 feet of the heating, air-conditioning, and refrigeration equipment. The receptacle outlet shall not be connected to the load side of the equipment disconnecting means. Action required: Provide receptacle(s) near new roof mounted equipment.
Fire Plan Review Approved with Conditions 11/26/2024 11/26/2024
Craig Hill
Construction documents for fire alarm systems
Corrective Action Required
11/26/2024

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Provide deferred submittal for alarm system.
Construction documents - Fire protection systems
Corrective Action Required
11/26/2024

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Provide deferred submittal for protection system.
Licensed Contractors Rejected 11/26/2024 11/21/2024
Joe Frogge
LC - General Contractor
Corrective Action Required
12/13/2024

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Provide the name, email address & phone number for the on-site contact.
LC - MEP Subs
Corrective Action Required
11/21/2024

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Alarm Plan Review Pending
Craig Hill
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Addition to Commercial $14,000.00 $14,000.00 Paid 01/28/2025
$7,177.50
7232302-Commercial License Tax Fee $3,588.75 $3,588.75 Paid 11/14/2024
$3,588.75
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Piers/Caissons Inspection - Commercial Pending
Underslab Plumbing Inspection - Commercial Pending
Water Service Inspection Pending
Electrical Service Inspection Pending
Gas Service Inspection - Commercial Pending
Rated Assembly Inspection Pending
Erosion Control Inspection Pending
Misc
Informational
03/06/2025
03/06/25 JMJ Erosion Control Appears to be effective.
In-wall Inspection Pending
Misc
Informational
04/08/2025
Areas approved: -Hard lids at basement training facilities interview rooms 272 and 280 -Training facility office 359 -Future 361
Sprinkler - Hydrostatic Test Pending
Sprinkler - Flow Test Pending
Occupancy Inspection - Codes Commercial Pending
Misc
Informational
04/28/2025
Partial final only. OK to occupy the following areas: -Interview rooms L272 and L280
Above Ceiling Inspection Pending
Misc
Corrective Action Required
04/28/2025
The following areas approved: -272, 280, 359, 361
Occupancy Inspection - Fire Pending 4/28/2025 4/28/2025
Erosion Control Inspection Residential Partial 3/6/2025 3/6/2025 03/06/2025
Misc
Informational
03/06/2025
03/06/25 JMJ Erosion Control Appears to be effective.
In-wall Inspection Partial 4/1/2025 4/1/2025 04/01/2025
Misc
Informational
04/01/2025
Areas approved: -Hard lids at basement training facilities interview rooms -Existing Training facility
In-wall Inspection Partial 4/8/2025 4/8/2025 04/08/2025
Misc
Informational
04/01/2025
Areas approved: -Hard lids at basement training facilities interview rooms 272 and 280 -Training facility office 359 -Future 361
Above Ceiling Inspection Partial 4/11/2025 4/11/2025 04/11/2025
Misc
Corrective Action Required
04/11/2025
-(2) Interview rooms in training facility approved
Footing Inspection - Commercial Partial 4/22/2025 4/22/2025 04/22/2025
Misc
Informational
04/22/2025
Vehicle bay addition complete except line D
Footing Inspection - Commercial Passed 4/23/2025 4/23/2025 04/23/2025
Misc
Resolved
04/23/2025
Vehicle bay addition complete except line D
Occupancy Inspection - Codes Commercial Failed 4/28/2025 4/28/2025 04/28/2025
Misc
Informational
04/28/2025
Partial final only. OK to occupy the following areas: -Interview rooms L272 and L280
Above Ceiling Inspection Partial 4/28/2025 4/28/2025 04/28/2025
Misc
Corrective Action Required
04/11/2025
The following areas approved: -272, 280, 359, 361
Documents & Images
Date Uploaded File Type Document Name
11/12/2024 Application Form APPLICATION
11/13/2024 Plans _241107_LSJOC-PD Renovations Package 2
11/14/2024 Letter License Tax Bill
11/26/2024 Letter DS P/R Corrections Document
12/10/2024 Letter LSPDR_ADD01 Narrative_For Reference_2024-12-10
12/10/2024 Letter LSPDR_ADD02 Narrative_For Reference_2024-12-10
12/10/2024 Plans LSPDR_Construction Set_REV 1_2024-12-10
12/10/2024 Letter LSPDR PERMIT COMMENT RESPONSE_2024-12-02
12/12/2024 Drawing 1403_LSPDR M-601 - MECHANICAL SCHEDULES
12/12/2024 Drawing 1503_LSPDR E-401 - ENLARGED ELECTRICAL PLANS
12/16/2024 Approved Plans Approved construction plans
01/28/2025 Receipt Receipt for transaction: 2025-000517
01/28/2025 Letter DS Building Permit
03/06/2025 Letter INSPECTION SUMMARY
04/01/2025 Letter INSPECTION SUMMARY
04/08/2025 Letter INSPECTION SUMMARY
04/11/2025 Letter INSPECTION SUMMARY
04/11/2025 Plans FIRE PLANS 2
04/11/2025 Plans FIRE PLANS
04/22/2025 Letter INSPECTION SUMMARY
04/23/2025 Letter INSPECTION SUMMARY
04/24/2025 Letter Fire (Sprinkler) Plan Review
04/28/2025 Letter INSPECTION SUMMARY
04/28/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home