Permit Application Status

PRCOM20245730


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20245730
Building Permit - Commercial
Certificate of Occupancy
MARION RIDGE SAFETY STORAGE LLC
NEW TENANT FINISH
1X PLASTICS - TENANT FINISH FOR STORAGE AND DISTRIBUTION OF PLASTIC MATERIALS
10/29/2024
11/20/2024
01/17/2025
Locations
Contacts
MARION RIDGE SAFETY STORAGE LLC, Address:1120 NW EAGLE RIDGE BLVD  
F & G MECHANICAL SERVICES INC, Address:17219 BEL RAY PLACE, Phone:(816) 322-0810  
VELOCITY ELECTRIC AND AUTOMATION LLC, Address:1704 SW RED FOX CIR, Phone:(816) 215-1514  
R2 PLUMBING LLC, Address:1705 A SE COUNTY RD AA, Phone:(816) 215-8098  
North Oak Safety Storage LLC, Address:1120 NW Eagle Ridge Blvd.  
CLAYTON@SAFETYMINISTORAGE.COM  
M DESIGN, Address:201 L STRETT, Phone:(816) 516-4861  
Reviews
Review Type Outcome Est. Completion Date Completed
Alarm Plan Review Released for Construction 01/02/2025 01/02/2025
Craig Hill
Alarm testing.
Corrective Action Required
01/02/2025

2018 IFC 904.4.2- Alarm testing. Notification appliances, connections to fire alarm systems, and connections to approved supervising stations shall be tested in accordance with this section and Section 907 to verify proper operation. Call (816)969-1300 24 hours in advance to schedule an alarm test.
Sprinkler Plan Review Released for Construction 11/20/2024 11/20/2024
Craig Hill
Fire Plan Review Approved with Conditions 11/19/2024 11/18/2024
Craig Hill
Construction documents for fire alarm systems
Corrective Action Required
11/12/2024

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Provide deferred submittal for fire alarm system.
Construction documents - Fire protection systems
Corrective Action Required
11/12/2024

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Provide deferred submittal for protection system.
Portable fire extinguishers - general
Corrective Action Required
11/12/2024

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Portable fire extinguishers - conspicuous locations
Corrective Action Required
11/12/2024

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel.
Building Plan Review Approved 11/19/2024 11/18/2024
Joe Frogge
IBC 1015.2 Where required - guard
Resolved
11/18/2024

2018 IBC 1015.2 Where required. (As amended by the City of Lee’s Summit) Guards shall be located along open-sided walking surfaces, including mezzanines, equipment platforms, aisles, stairs, ramps and landings that are located more than 30 inches measured vertically to the floor or grade below at any point within 36 inches horizontally to the edge of the open side. Guards shall be adequate in strength and attachment in accordance with Section 1607.8. Guards are required at retaining walls over 30” above grade when walking surfaces are within ten (10) feet of the high side of the retaining wall. (See code section for possible exceptions.) Action required: Provide guard rails at equipment platform.
NEC Article 210.63 Heating, air-conditioning and refrigeration outlet
Resolved
11/18/2024

2017 NEC Article 210.63 Heating, Air-Conditioning, and Refrigeration Equipment Outlet. A 125-volt, single-phase, 15- or 20-ampere-rated receptacle outlet shall be installed at an accessible location for the servicing of heating, air-conditioning, and refrigeration equipment. The receptacle shall be located on the same level and within 25 feet of the heating, air-conditioning, and refrigeration equipment. The receptacle outlet shall not be connected to the load side of the equipment disconnecting means. Action required: Provide receptacle on equipment platform within 25' of furnace.
Licensed Contractors Approved 11/19/2024 11/18/2024
Joe Frogge
LC - General Contractor
Resolved
11/18/2024

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and the name, email address & phone number for the on-site contact.
Fire Plan Review Approved with Conditions 11/08/2024 11/08/2024
Craig Hill
Construction documents for fire alarm systems
Corrective Action Required
11/08/2024

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Provide deferred submittal for fire alarm system.
Construction documents - Fire protection systems
Corrective Action Required
11/08/2024

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Provide deferred submittal for protection system.
Portable fire extinguishers - general
Corrective Action Required
11/08/2024

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Portable fire extinguishers - conspicuous locations
Corrective Action Required
11/08/2024

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel.
Building Plan Review Rejected 11/08/2024 11/05/2024
Joe Frogge
IBC 1015.2 Where required - guard
Corrective Action Required
11/05/2024

2018 IBC 1015.2 Where required. (As amended by the City of Lee’s Summit) Guards shall be located along open-sided walking surfaces, including mezzanines, equipment platforms, aisles, stairs, ramps and landings that are located more than 30 inches measured vertically to the floor or grade below at any point within 36 inches horizontally to the edge of the open side. Guards shall be adequate in strength and attachment in accordance with Section 1607.8. Guards are required at retaining walls over 30” above grade when walking surfaces are within ten (10) feet of the high side of the retaining wall. (See code section for possible exceptions.) Action required: Provide guard rails at equipment platform.
NEC Article 210.63 Heating, air-conditioning and refrigeration outlet
Corrective Action Required
11/05/2024

2017 NEC Article 210.63 Heating, Air-Conditioning, and Refrigeration Equipment Outlet. A 125-volt, single-phase, 15- or 20-ampere-rated receptacle outlet shall be installed at an accessible location for the servicing of heating, air-conditioning, and refrigeration equipment. The receptacle shall be located on the same level and within 25 feet of the heating, air-conditioning, and refrigeration equipment. The receptacle outlet shall not be connected to the load side of the equipment disconnecting means. Action required: Provide receptacle on equipment platform within 25' of furnace.
Licensed Contractors Rejected 11/08/2024 11/05/2024
Joe Frogge
LC - General Contractor
Corrective Action Required
11/05/2024

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and the name, email address & phone number for the on-site contact.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Tenent Finish $320.00 $320.00 Paid 11/26/2024
7232302-Industrial/Warehouse License Tax Fee $2,200.00 $2,200.00 Paid 11/26/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Passed 11/21/2024 11/21/2024 11/21/2024
Rated Assembly Inspection Partial 12/3/2024 12/3/2024 12/03/2024
Misc
Informational
12/03/2024
Pre-rock OK
Rated Assembly Inspection Passed 12/6/2024 12/6/2024 12/06/2024
Misc
Resolved
12/06/2024
Pre-rock OK
In-wall Inspection Passed 12/9/2024 12/9/2024 12/09/2024
Gas Service Inspection - Commercial Passed 12/11/2024 12/11/2024 12/11/2024
Above Ceiling Inspection Failed 12/24/2024 12/24/2024 12/24/2024
Misc
Corrective Action Required
12/24/2024
-Protect penetrations of the fire rated wall
Above Ceiling Inspection Passed 12/27/2024 12/27/2024 12/27/2024
Misc
Resolved
12/27/2024
-Protect penetrations of the fire rated wall
Electrical Service Inspection Passed 12/27/2024 12/27/2024 12/27/2024
Alarm Test Passed 01/14/2025
Verify Final Inspection (Final) Complete 1/17/2025 1/17/2025 01/15/2025
Occupancy Inspection - Codes Commercial Full C of O 1/17/2025 1/17/2025 at 12:00 AM 01/17/2025
Occupancy Inspection - Fire Passed 1/17/2025 1/17/2025 01/18/2025
Documents & Images
Date Uploaded File Type Document Name
10/29/2024 Application Form APPLICATION
10/30/2024 Plans 24_10_25 1X Plastics Permit Submittal A -MEP
10/30/2024 Email clarification of use
11/05/2024 Letter License Tax Bill
11/06/2024 Drawing 1x Plastics - Sprinklers
11/08/2024 Letter DS P/R Corrections Document
11/11/2024 Letter 24_11_08 Plan Review Response Letter PRCOM20245730 letter
11/11/2024 Letter DS P_R Corrections Document review
11/11/2024 Drawing E201 ELECTRICAL POWER PLAN - Revised 11_08_24 a1 plasticts
11/20/2024 Approved Plans Approved building plans
11/20/2024 Receipt Receipt for transaction:2024-009070
11/20/2024 Letter DS Building Permit
11/20/2024 1x Plastics RFC
11/20/2024 Letter Fire (Sprinkler) Plan Review
11/21/2024 Letter INSPECTION SUMMARY
11/26/2024 Receipt Receipt for transaction:2024-009167
12/03/2024 Letter INSPECTION SUMMARY
12/05/2024 Letter 24_12_04 Plumbing Gas Plan Revision PRCOM20245730 Narrative Letter
12/05/2024 Drawing P202 PLUMBING WATER PLAN Revised 24_12_04
12/05/2024 Approved Plans Approved P202 revision
12/06/2024 Letter INSPECTION SUMMARY
12/09/2024 Letter INSPECTION SUMMARY
12/11/2024 Letter INSPECTION SUMMARY
12/19/2024 1X Plastics Fire Alarm
12/19/2024 Fire Alarm Data Sheets
12/24/2024 Letter INSPECTION SUMMARY
12/27/2024 Letter INSPECTION SUMMARY
12/27/2024 Letter INSPECTION SUMMARY
01/02/2025 1X Plastics Fire Alarm RFC
01/02/2025 Letter Fire (Alarm) Plan Review Notice
01/17/2025 Letter Codes Final Certificate of Occupancy
01/17/2025 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home