Permit Application Status

PRCOM20245687


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20245687
Building Permit - Commercial
Issued
I-470 & VIEW HIGH COMMUNITY IMPROVRMENT DISTRICT
NEW OTHER (COMMERCIAL)
Paragon Star Village - Multi-family - NEW PARKING GARAGE SERVING APARTMENTS
10/28/2024
11/27/2024
05/11/2025
Locations
Contacts
Kevin O'Brien - Epic Concrete Construction, Phone:(816) 898-3808  
Arrowhead Electric Inc, Address:1101 W Main St Suite B, Phone:(816) 656-0555  
SALADINO PLUMBING & HEATING COMPANY, Address:2210 TELEVISION PL, Phone:(816) 833-9900  
Finkle + Williams Architecture, Address:8787 Renner Blvd. Suite 100, Phone:(913) 498-1550  
I-470 & VIEW HIGH COMMUNITY IMPROVRMENT DISTRICT, Address:315 SE MAIN ST  
Olsson Engineering, Address:1301 Burlington, Suite 100, Phone:(816) 361-1177  
EPIC CONCRETE CONSTRUCTION, Address:12600 E 98TH ST, Phone:(816) 861-3300  
SALADINO PLUMBING & HEATING COMPANY, Address:2210 TELEVISION PL, Phone:(816) 833-9900  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 11/27/2024 11/27/2024
Andrea Sessler
LC - MEP Subs
Corrective Action Required
11/27/2024

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 11/21/2024 - Waiting on listing of EC.
Fire Plan Review Approved 11/25/2024 11/25/2024
Craig Hill
Portable fire extinguishers - general
Corrective Action Required
11/18/2024

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Portable fire extinguishers - conspicuous locations
Corrective Action Required
11/18/2024

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel.
Misc
Corrective Action Required
11/18/2024

All exits from the parking garage are to remain unlocked and be equipped with panic hardware. Electronic locking devices that require a card, fob, or any other device to unlock doors that are marked an exit are not authorized to be used and cannot be utilized in the garage area. Please provide documentation on door hardware as well as a letter from the owner acknowledging locking devices will not be installed or utilized.
Construction documents for fire alarm systems
Corrective Action Required
11/18/2024

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Provide deferred submittal for fire alarm system.
Construction documents - Fire protection systems
Corrective Action Required
11/18/2024

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Provide deferred submittal for protection system.
Building Plan Review Approved 11/25/2024 11/21/2024
Joe Frogge
IBC 1704.2 Special Inspections
Resolved
11/21/2024

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
NEC Article 250.66 Size of AC Grounding electrode conductor
Resolved
11/21/2024

2017 NEC Article 250.66 Size of Alternating-Current Grounding Electrode Conductor. The size of the grounding electrode conductor at the service, at each building or structure where supplied by a feeder(s) or branch circuit(s), or at a separately derived system of a grounded or ungrounded ac system shall not be less than given in Table 250.66, except as permitted in 250.66(A) through (C). Action required: Revise detail 3/E3.01G to show all electrode sizes.
IMC 403.2 Outdoor air required
Resolved
11/21/2024

2018 IMC 404.1 Enclosed parking garages. Mechanical ventilation systems for enclosed parking garages shall operate continuously or shall be automatically operated by means of carbon monoxide detectors applied in conjunction with nitrogen dioxide detectors. Such detectors shall be listed in accordance with UL 2075 and installed in accordance with their listing and the manufacturers’ instructions. Automatic operation shall cycle the ventilation system between the following two modes of operation: 1. Full-on at an airflow rate of not less than 0.75 cfm per square foot of the floor area served. 2. Standby at an airflow rate of not less than 0.05 cfm per square foot of the floor area served. Action required: Amend/add to designs to demonstrate compliance.
Special Inspections Review Approved 11/21/2024
Joe Frogge
Licensed Contractors Rejected 11/25/2024 11/21/2024
Joe Frogge
LC - General Contractor
Resolved
11/21/2024

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and the name, email address & phone number for the on-site contact.
LC - MEP Subs
Corrective Action Required
11/18/2024

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 11/21/2024 - Waiting on listing of EC.
Final Development Plan Review Approved 11/12/2024 11/12/2024
Mike Weisenborn
Fire Plan Review Rejected 11/12/2024 11/12/2024
Craig Hill
Portable fire extinguishers - general
Corrective Action Required
11/12/2024

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Portable fire extinguishers - conspicuous locations
Corrective Action Required
11/12/2024

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel.
Misc
Corrective Action Required
11/12/2024

All exits from the parking garage are to remain unlocked and be equipped with panic hardware. Electronic locking devices that require a card, fob, or any other device to unlock doors that are marked an exit are not authorized to be used and cannot be utilized in the garage area. Please provide documentation on door hardware as well as a letter from the owner acknowledging locking devices will not be installed or utilized.
Construction documents for fire alarm systems
Corrective Action Required
11/12/2024

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Provide deferred submittal for fire alarm system.
Construction documents - Fire protection systems
Corrective Action Required
11/12/2024

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Provide deferred submittal for protection system.
Building Plan Review Rejected 11/12/2024 11/07/2024
Joe Frogge
Final Development Plan
Resolved
11/12/2024

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational.
IBC 1704.2 Special Inspections
Corrective Action Required
11/07/2024

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
NEC Article 250.66 Size of AC Grounding electrode conductor
Corrective Action Required
11/07/2024

2017 NEC Article 250.66 Size of Alternating-Current Grounding Electrode Conductor. The size of the grounding electrode conductor at the service, at each building or structure where supplied by a feeder(s) or branch circuit(s), or at a separately derived system of a grounded or ungrounded ac system shall not be less than given in Table 250.66, except as permitted in 250.66(A) through (C). Action required: Revise detail 3/E3.01G to show all electrode sizes.
IMC 403.2 Outdoor air required
Corrective Action Required
11/12/2024

2018 IMC 404.1 Enclosed parking garages. Mechanical ventilation systems for enclosed parking garages shall operate continuously or shall be automatically operated by means of carbon monoxide detectors applied in conjunction with nitrogen dioxide detectors. Such detectors shall be listed in accordance with UL 2075 and installed in accordance with their listing and the manufacturers’ instructions. Automatic operation shall cycle the ventilation system between the following two modes of operation: 1. Full-on at an airflow rate of not less than 0.75 cfm per square foot of the floor area served. 2. Standby at an airflow rate of not less than 0.05 cfm per square foot of the floor area served. Action required: Amend/add to designs to demonstrate compliance.
Licensed Contractors Rejected 11/12/2024 11/07/2024
Joe Frogge
LC - General Contractor
Corrective Action Required
11/07/2024

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and the name, email address & phone number for the on-site contact.
LC - MEP Subs
Corrective Action Required
11/07/2024

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Alarm Plan Review Pending
Craig Hill
Sprinkler Plan Review Pending
Craig Hill
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Other $45,000.00 $45,000.00 Paid 11/27/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Final Inspection - Commercial Pending
Rough Electrical Inspection - Commercial Pending
Electrical Service Inspection Pending
Piers/Caissons Inspection - Commercial Pending
Suspended Slab Inspection Pending
Footing Inspection - Commercial Pending
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
01/02/2025
Line G1 from GB.5 to GC -Line GC from G3 to G4; G2 to G3; G4 to G6 Line GB from G3 to G6 Line G6 25' each direction from GB Line G3 complete Pier pads at GC/G7, GA/G7, GB/G7, GA/G8, GB/G8, GC/G8
Foundation Inspection - Commercial Pending
Misc
Corrective Action Required
01/03/2025
Columns at G8/GA-G8/GC
Underslab Plumbing Inspection - Commercial Pending
Rough Plumbing Inspection - Commercial Pending
Sanitary Sewer Construction Inspection Pending
Misc
Informational
04/10/2025
04/10/25 Thursday JMJ (Pro Design Const.) Contractor installed an approximate total of 85' of 6" SDR-26 as per project plans today to exist sanitary on project. 40 plus feet on the West & additional 40 plus on the Eastside of garage. Approximately 25' of 6" sanitary will be encased in concrete on the Westside and 30' on the Eastside as per project plans. Cleanouts and stubs for lines were installed per project plans.( Inspector had to refer the contractor to the DCM design construction manual about required way encase pipping.)
Storm Sewer Construction Inspection Pending
Misc
Informational
04/14/2025
04/04/25 Friday JMJ ( Pro Design) 04/03/24 Thursday Contractor installed approximately 10ft of 24" RCP to storm box 5101 and 80ft of 18" RCP toward storm box 5701 also collars were poured for storm box 5101. Today 12ft of 18"RCP to box 5701 and set box 5701. 04/07/25 Monday JMJ ( Pro Design) Installed 113ft of 18" RCP to box 5702 and set storm box 5702. 04/08/25 Tuesday JMJ (Pro Design) Contractor installed 64ft of 18" RCP towards box 5703 & poured 7 yds of concrete for collars and inverts. 04/14/25 Monday JMJ (Pro Design) Contractor installed 70ft of 18" RCP to box 5705. Set storm box 5705 and poured invert.
Footing Inspection - Commercial Partial 12/18/2024 12/18/2024 12/18/2024
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
12/18/2024
Line G1 from GB.5 to GC
Footing Inspection - Commercial Partial 12/19/2024 12/19/2024 12/19/2024
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
12/18/2024
Line G1 from GB.5 to GC -Line GC from G3 to G4 Line G3 from GC to GB.5
Footing Inspection - Commercial Partial 12/20/2024 12/20/2024 12/20/2024
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
12/19/2024
Line G1 from GB.5 to GC -Line GC from G3 to G4; G2 to G3; G4 to G6 Line G3 from GC to GB.5
Footing Inspection - Commercial Partial 12/23/2024 12/23/2024 12/23/2024
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
12/20/2024
Line G1 from GB.5 to GC -Line GC from G3 to G4; G2 to G3; G4 to G6 Line GB from G3 to G5 Line G3 complete
Footing Inspection - Commercial Partial 12/24/2024 12/24/2024 12/24/2024
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
12/23/2024
Line G1 from GB.5 to GC -Line GC from G3 to G4; G2 to G3; G4 to G6 Line GB from G3 to G6 Line G6 25' each direction from GB Line G3 complete
Footing Inspection - Commercial Partial 12/30/2024 12/30/2024 12/30/2024
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
12/24/2024
Line G1 from GB.5 to GC -Line GC from G3 to G4; G2 to G3; G4 to G6 Line GB from G3 to G6 Line G6 25' each direction from GB Line G3 complete Pier pads at GC/G7, GA/G7
Footing Inspection - Commercial Partial 12/31/2024 12/31/2024 12/31/2024
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
12/30/2024
Line G1 from GB.5 to GC -Line GC from G3 to G4; G2 to G3; G4 to G6 Line GB from G3 to G6 Line G6 25' each direction from GB Line G3 complete Pier pads at GC/G7, GA/G7, GB/G7, GA/G8
Footing Inspection - Commercial Partial 1/2/2025 01/02/2025
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
12/31/2024
Line G1 from GB.5 to GC -Line GC from G3 to G4; G2 to G3; G4 to G6 Line GB from G3 to G6 Line G6 25' each direction from GB Line G3 complete Pier pads at GC/G7, GA/G7, GB/G7, GA/G8, GB/G8, GC/G8
Foundation Inspection - Commercial Partial 1/3/2025 1/3/2025 01/03/2025
Misc
Corrective Action Required
01/03/2025
Columns at G8/GA-G8/GC
Storm Sewer Construction Inspection Partial 4/4/2025 4/4/2025 04/04/2025
Misc
Informational
04/04/2025
04/04/25 Friday JMJ ( Pro Design) 04/03/24 Thursday Contractor installed approximately 10ft of 24" RCP to storm box 5101 and 80ft of 18" RCP toward storm box 5701 also collars were poured for storm box 5101. Today 12ft of 18"RCP to box 5701 and set box 5701.
Storm Sewer Construction Inspection Partial 4/8/2025 4/8/2025 04/08/2025
Misc
Informational
04/04/2025
04/04/25 Friday JMJ ( Pro Design) 04/03/24 Thursday Contractor installed approximately 10ft of 24" RCP to storm box 5101 and 80ft of 18" RCP toward storm box 5701 also collars were poured for storm box 5101. Today 12ft of 18"RCP to box 5701 and set box 5701. 04/08/25 Friday JMJ ( Pro Design) Installed 113ft of 18" RCP to box 5702 and set storm box 5702.
Storm Sewer Construction Inspection Partial 04/09/2025
Misc
Informational
04/08/2025
04/04/25 Friday JMJ ( Pro Design) 04/03/24 Thursday Contractor installed approximately 10ft of 24" RCP to storm box 5101 and 80ft of 18" RCP toward storm box 5701 also collars were poured for storm box 5101. Today 12ft of 18"RCP to box 5701 and set box 5701. 04/07/25 Monday JMJ ( Pro Design) Installed 113ft of 18" RCP to box 5702 and set storm box 5702. 04/08/25 Tuesday JMJ (Pro Design) Contractor installed64ft of 18" RCP towards box 5703 & poured 7 yds of concrete for collars and inverts.
Sanitary Sewer Construction Inspection Partial 04/10/2025
Misc
Informational
04/10/2025
04/10/25 Thursday JMJ (Pro Design Const.) Contractor installed an approximate total of 85' of 6" SDR-26 as per project plans today to exist sanitary on project. 40 plus feet on the West & additional 40 plus on the Eastside of garage. Approximately 25' of 6" sanitary will be encased in concrete on the Westside and 30' on the Eastside as per project plans. Cleanouts and stubs for lines were installed per project plans.( Inspector had to refer the contractor to the DCM design construction manual about required way encase pipping.)
Storm Sewer Construction Inspection Partial 04/14/2025
Misc
Informational
04/09/2025
04/04/25 Friday JMJ ( Pro Design) 04/03/24 Thursday Contractor installed approximately 10ft of 24" RCP to storm box 5101 and 80ft of 18" RCP toward storm box 5701 also collars were poured for storm box 5101. Today 12ft of 18"RCP to box 5701 and set box 5701. 04/07/25 Monday JMJ ( Pro Design) Installed 113ft of 18" RCP to box 5702 and set storm box 5702. 04/08/25 Tuesday JMJ (Pro Design) Contractor installed 64ft of 18" RCP towards box 5703 & poured 7 yds of concrete for collars and inverts. 04/14/25 Monday JMJ (Pro Design) Contractor installed 70ft of 18" RCP to box 5705. Set storm box 5705 and poured invert.
Documents & Images
Date Uploaded File Type Document Name
10/28/2024 Application Form Commercial Permit Application PS North Village Garage_2024
10/28/2024 Plans 24-1018 Paragon Star Garage_Permit
11/12/2024 Letter DS P/R Corrections Document
11/18/2024 Letter 24-1114 Paragon Star Garage_Permit Response
11/18/2024 Plans 24-1018 Paragon Star Garage_Permit_ASI 1
11/21/2024 Engineer Report/Study Special Insp Letter
11/25/2024 Approved Plans Approved construction plans
11/27/2024 Receipt Receipt for transaction:2024-009217
11/27/2024 Letter DS Building Permit
12/18/2024 Letter INSPECTION SUMMARY
12/19/2024 Letter INSPECTION SUMMARY
12/20/2024 Letter INSPECTION SUMMARY
12/23/2024 Letter INSPECTION SUMMARY
12/24/2024 Letter INSPECTION SUMMARY
12/30/2024 Letter INSPECTION SUMMARY
12/31/2024 Letter INSPECTION SUMMARY
01/02/2025 Letter INSPECTION SUMMARY
01/03/2025 Letter INSPECTION SUMMARY
04/04/2025 Letter INSPECTION SUMMARY
04/08/2025 Letter INSPECTION SUMMARY
04/08/2025 Letter INSPECTION SUMMARY
04/09/2025 Letter INSPECTION SUMMARY
04/10/2025 Letter INSPECTION SUMMARY
04/14/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home