Permit Application Status

PRCOM20241167


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20241167
Building Permit - Commercial
Voided
NEW TENANT FINISH
ARO INTERNATIONAL - TENANT FINISH FOR NEW OFFICE **cancelled per applicant - see email
03/13/2024
09/21/2024
09/18/2024
Locations
Contacts
Robinett Constructiion & Moore, Address:2504 NW ACORN DR  
  
CARUTHERS ELECTRICAL LLC, Address:30905 E TRUMAN RD, Phone:(816) 508-9050  
  
  
  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Plan Review Rejected 03/25/2024 03/24/2024
Jim Eden
Address numbers required
Corrective Action Required
03/24/2024

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). All doors to the space shall be posted with th correct address ans suite number.
Portable fire extinguishers - general
Corrective Action Required
03/24/2024

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Miscellaneous Correction
Corrective Action Required
03/24/2024

Provide a complete Code Analysis for project and reference the correct fire and building codes for Lee's Summit
Miscellaneous Correction
Corrective Action Required
03/24/2024

Show exit and emergency lighting.
Building Plan Review Rejected 03/25/2024 03/22/2024
Joe Frogge
License Tax - Payment
Corrective Action Required
03/22/2024

A one-time impact fee in the form of a license tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is for informational purposes. The fee will be $2,953.50
Gen - Plan submittal documents
Corrective Action Required
03/22/2024

Lee's Summit Code Of Ordinances 7-137. - Submittal Documents. Construction documents, special inspection and structural observation programs, and other data shall be submitted with each application for a permit. A registered design professional licensed by the State of Missouri shall prepare the construction documents. Where special conditions exist, the Building Official is authorized to require additional construction documents to be prepared by a registered design professional licensed by the State of Missouri. Action required: Resubmit all plans with seal/signature of architect and/or engineer.
Code analysis required
Corrective Action Required
03/22/2024

A code analysis shall be provided which includes but is not limited to occupancy type, occupant load, construction type, actual area, height and floors, allowable area, height and floors, and the codes to which the project is designed. Amend/correct building data as follows: - Construction type is 2B. - Occupant load is 12. (1800/150)
Gen - Plan submittals 2018 codes
Corrective Action Required
03/22/2024

All plans submitted for review on or after April 1, 2019 shall be designed to the requirements of the 2018 International Building Code, 2018 International Mechanical Code, 2018 International Plumbing Code, 2018 International Fuel Gas Code, 2018 International Fire Code, 2017 National Electric Code and the ICC/ANSI A117.1-2009 as amended and adopted by the City of Lee’s Summit. Action required: Amend code data to show correct code years. (Sheets A-0 & P-1)
IBC 603.1 Type of Construction - Allowable Materials
Corrective Action Required
03/22/2024

2018 IBC 603.1 Allowable Materials. Combustible materials shall be permitted in buildings of Type I or II construction in the following applications and in accordance with Sections 603.1.1 through 603.1.3: (see code for specific examples and exceptions) Action required: Wood is not allowed for wall construction in type 2B building. Amend designs to comply.
IPC 403.1 Minimum number of fixtures
Corrective Action Required
03/22/2024

2018 IPC 403.1 Minimum number of fixtures. Plumbing fixtures shall be provided in the minimum number shown in Table 403.1, based on the actual use of the building or space. Uses not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Action required: Provide mop sink.
IBC 1209.2 Finish materials
Corrective Action Required
03/22/2024

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) Action required: Specify compliant wall finishes at water closets and mop sink. If paint is used it must be epoxy based.
ICC A117.1 604.5.1 Fixed side wall grab bars
Corrective Action Required
03/22/2024

ICC A117.1 604.5.1 Fixed side wall grab bars. Fixed side-wall grab bars shall include a horizontal bar complying with Section 604.5.1.1 and a vertical grab bar complying with Section 604.5.12. The vertical grab bar at water closets primarily for children’s use shall comply with Section 609.4.2. ICC A117.1 604.5.1.1 Horizontal grab bar. A horizontal grab bar 42 inches minimum in length shall be located 12 inches maximum from the rear wall and extending 54 inches minimum from the rear wall. ICC A117.1 604.5.1.2 Vertical grab bar. A vertical grab bar 18 inches minimum in length shall be mounted with the bottom of the bar located 39 inches minimum and 41 inches maximum above the floor, and with the center line of the bar located 39 inches minimum and 41 inches maximum from the rear wall. Action required: Provide vertical grab bar at accessible water closet.
IBC 1109.11 Seating at tables, counters and work surfaces - accessibility
Corrective Action Required
03/22/2024

2018 IBC 1109.11 Seating at tables, counters and work surfaces. Where seating or standing space at fixed or built-in tables, counters or work surfaces is provided in accessible spaces, at least 5 percent of the seating and standing spaces, but not less than one, shall be accessible. (see code for exception) Action required: Modify drawings to demonstrate compliance. (Max. 34" high at counter tops)
IPC 305.4 Freezing - protection of potable water
Corrective Action Required
03/22/2024

Protection of Potable Water System 2018 IPC 305.4 Freezing. Water, soil, and waste pipes shall not be installed outside of a building, in attics or crawl spaces, concealed in outside walls, or in any other place subjected to freezing temperatures unless adequate provision is made to protect such pipes from freezing by insulation or heat or both. Exterior water supply system piping shall be installed not less than 6” below the frost line (42” below grade) and not less than 12 inches below grade. Action required: Provide heating to restrooms.
Misc
Corrective Action Required
04/03/2024

Drawings show a rear exit stair that does not exist.
Licensed Contractors Rejected 03/25/2024 03/22/2024
Joe Frogge
LC - General Contractor
Corrective Action Required
03/22/2024

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Provide an email address & phone number for the on-site contact which is where inspection reports will be sent.
LC - MEP Subs
Corrective Action Required
03/22/2024

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. (Thomas Comfort Systems is not licensed with us)
Inspections

There are no inspections for this permit application.

Documents & Images
Date Uploaded File Type Document Name
03/13/2024 Application Form APPLICATION
03/13/2024 Plans 430 SW LONGVIEW-MEP
03/18/2024 Plans 430 SW Longview ste 200 Plan set
03/18/2024 Letter License Tax Bill
03/25/2024 Letter DS P/R Corrections Document
09/18/2024 Email Re_ ARO International - PRCOM20241167
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home