PRCOM20234930
Building Permit - Commercial
Final Completion
CITY OF LEES SUMMIT
ALTERATION COMMERCIAL
CITY HALL - RELOCATE DOOR AND BUILD WALL IN EXISTING HR DEPARTMENT
09/27/2023
10/10/2023
02/27/2024
Locations
Contacts
THE WILSON GROUP, Address:13510 OAK ST, Phone:(816) 537-0212  
Ron Johnson, Address:220 SE green st, Phone:(816) 969-1860  
THE CITY OF LEE'S SUMMIT, MISSOURI, Address:220 SE GREEN ST  
CITY OF LEES SUMMIT, Address:PO BOX 1600  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Plan Review Approved with Conditions 10/09/2023 10/09/2023
Jim Eden
Miscellaneous Correction
Corrective Action Required
10/09/2023

Adjust sprinkler coverage in the hallway or office if needed, and provide "as built" drawings.
Miscellaneous Correction
Corrective Action Required
10/09/2023

What is in the space to the east of the door that the door will be moved to?
Building Plan Review Approved with Conditions 10/09/2023 09/27/2023
Joe Frogge
IBC 603.1 Type of Construction - Allowable Materials
Corrective Action Required
09/27/2023

2018 IBC 603.1 Allowable Materials. Combustible materials shall be permitted in buildings of Type I or II construction in the following applications and in accordance with Sections 603.1.1 through 603.1.3: (see code for specific examples and exceptions) Action required: Walls to be built with non-combustible materials. To be field verified.
Licensed Contractors Approved 09/27/2023 09/27/2023
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Alteration to Commercial $50.00 $50.00 Paid 10/10/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Passed 02/27/2024
Above Ceiling Inspection Passed 02/27/2024
Final Inspection - Commercial Passed 02/27/2024
Documents & Images
Date Uploaded File Type Document Name
09/27/2023 Application Form Scope of Work Permit for HR wall project
09/27/2023 Drawing hr dept alteration
10/09/2023 Letter Fire Building Plan Review
10/10/2023 Approved Plans approved - hr dept alteration
10/10/2023 Receipt Receipt for transaction: 2023-007649
10/10/2023 Letter DS Building Permit
02/27/2024 Letter INSPECTION SUMMARY
02/27/2024 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home