Permit Application Status

PRCOM20233498


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20233498
Building Permit - Commercial
Certificate of Occupancy
209 211 SE DOUGLAS LLC
CHANGE OF TENANT
TENANT IMPROVEMENT RENOVATION TO EXISTING OFFICE TO UPGRADE FINISHES AND FIXTURES.
07/18/2023
09/18/2023
01/24/2024
05/10/2024
Locations
Contacts
ASTERISK INC, Address:6905 Blue Ridge Blvd, Phone:(816) 694-5700  
209 211 SE DOUGLAS LLC, Address:209 SW 3RD ST  
  
MARTIN MECHANICAL INC, Address:11632 GRANDVIEW RD, Phone:(816) 842-2900  
RWB Electric LLC, Address:12208 E 32nd St., Phone:(816) 808-6169  
MARTIN MECHANICAL INC, Address:11632 GRANDVIEW RD, Phone:(816) 842-2900  
COLLINS WEBB ARCHITECTURE LLC, Address:307 SW MARKET ST, Unit B, Phone:(816) 249-2270  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 08/16/2023 09/18/2023
Brandon Kalwei
LC - General Contractor
Corrective Action Required
08/09/2023

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent. 8/15/23 - acknowledged in letter
LC - MEP Subs
Corrective Action Required
08/09/2023

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 8/15/23 - acknowledged in letter
Building Plan Review Approved 08/16/2023 08/15/2023
Joe Frogge
Design loads
Resolved
08/15/2023

2018 IBC 1608.2 Ground Snow Loads. The ground snow loads to be used in determining the design snow loads for roofs shall be determined in accordance with ASCE 7 or Figure 1608.2 for the contiguous United States…… (see code for additional information) Action required: Revise information on sheet S101 to show correct snow load which is 20psf.
IBC 1010.1.2 Door swing - direction of swing egress travel
Resolved
08/15/2023

2018 IBC 1010.1.2 Door swing. Egress doors shall be of the pivoted or side-hinged swinging type. Exceptions: (See code for exceptions.) Action required: Sliding door not allowed in Conference Room 112 because occupant load is greater than 10. See Exception 9.
IBC 1109.11 Seating at tables, counters and work surfaces - accessibility
Resolved
08/15/2023

2018 IBC 1109.11 Seating at tables, counters and work surfaces. Where seating or standing space at fixed or built-in tables, counters or work surfaces is provided in accessible spaces, at least 5 percent of the seating and standing spaces, but not less than one, shall be accessible. (see code for exception) Action required: Modify plans to show that counter top and sink in front lobby will be maximum 34" high.
IBC 1015.6 Mechanical equipment, systems and devices - hvac within 10 feet of roof edge
Resolved
08/15/2023

2018 IBC 1015.6 Mechanical equipment, systems and devices. Guards shall be provided where various components that require service are located within 10 feet of a roof edge or open side of a walking surface and such edge or open side is located more than 30 inches above the floor, roof or grade below. The guard shall extend not less than 30 inches beyond each end of such components. The guard shall be constructed so as to prevent the passage of a sphere 21 inches in diameter. Action required: Provide guards at parapets or relocate roof mounted equipment to comply.
IMC 501.3.1 Location of exhaust outlets
Resolved
08/15/2023

2018 IMC 501.3.1 Location of exhaust outlets. The termination point of exhaust outlets and ducts discharging to the outdoors shall be located with the following minimum distances: (see code for items 1, 2, 4, & 5) 3. For all environmental air exhaust: 3 feet from property lines; 3 feet from operable openings into building for all occupancies other than Group U, and 10 feet from mechanical air intakes. Such exhaust shall not be considered hazardous or noxious. Action required: Exhaust fan and RTU intake are in close proximity to each other. Minimum 10' required. To be field verified.
Fire Plan Review Approved 08/16/2023 08/14/2023
Jim Eden
MISC
Resolved
08/14/2023

The Fire Protection notes state the building will be provided with a wet sprinkler system. I'ts assumed this will not occur.
Portable fire extinguishers - general
Resolved
08/14/2023

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Provide a minimum of one 2A,10B,C fire extinguisher. Verified at inspection. FYI- The State of Missouri does not have an adopted fire code.
Fire Plan Review Approved with Conditions 07/28/2023 07/28/2023
Jim Eden
MISC
Corrective Action Required
07/28/2023

The Fire Protection notes state the building will be provided with a wet sprinkler system. I'ts assumed this will not occur.
Portable fire extinguishers - general
Corrective Action Required
07/28/2023

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Provide a minimum of one 2A,10B,C fire extinguisher. Verified at inspection. FYI- The State of Missouri does not have an adopted fire code.
Building Plan Review Rejected 07/28/2023 07/26/2023
Joe Frogge
Design loads
Corrective Action Required
07/26/2023

2018 IBC 1608.2 Ground Snow Loads. The ground snow loads to be used in determining the design snow loads for roofs shall be determined in accordance with ASCE 7 or Figure 1608.2 for the contiguous United States…… (see code for additional information) Action required: Revise information on sheet S101 to show correct snow load which is 20psf.
Planning - Screening of rooftop equipment
Resolved
08/01/2023

Unified Development Ordinance Article 8, Section 8.180.E Roof mounted equipment – All roof-mounted equipment shall be screened entirely from view by using parapet walls at the same height as the mechanical units. For additions to existing buildings that do not meet this standard, individual screens will be permitted, with the design subject to approval by the Director. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened from all 4 sides per referenced UDO section. 8/1/23- Per Shannon M. there is a project in progress to build a facade on this building that will act as screening
IBC 1010.1.2 Door swing - direction of swing egress travel
Corrective Action Required
07/26/2023

2018 IBC 1010.1.2 Door swing. Egress doors shall be of the pivoted or side-hinged swinging type. Exceptions: (See code for exceptions.) Action required: Sliding door not allowed in Conference Room 112 because occupant load is greater than 10. See Exception 9.
IBC 1109.11 Seating at tables, counters and work surfaces - accessibility
Corrective Action Required
07/26/2023

2018 IBC 1109.11 Seating at tables, counters and work surfaces. Where seating or standing space at fixed or built-in tables, counters or work surfaces is provided in accessible spaces, at least 5 percent of the seating and standing spaces, but not less than one, shall be accessible. (see code for exception) Action required: Modify plans to show that counter top and sink in front lobby will be maximum 34" high.
IBC 1015.6 Mechanical equipment, systems and devices - hvac within 10 feet of roof edge
Corrective Action Required
07/26/2023

2018 IBC 1015.6 Mechanical equipment, systems and devices. Guards shall be provided where various components that require service are located within 10 feet of a roof edge or open side of a walking surface and such edge or open side is located more than 30 inches above the floor, roof or grade below. The guard shall extend not less than 30 inches beyond each end of such components. The guard shall be constructed so as to prevent the passage of a sphere 21 inches in diameter. Action required: Provide guards at parapets or relocate roof mounted equipment to comply.
IMC 501.3.1 Location of exhaust outlets
Corrective Action Required
07/26/2023

2018 IMC 501.3.1 Location of exhaust outlets. The termination point of exhaust outlets and ducts discharging to the outdoors shall be located with the following minimum distances: (see code for items 1, 2, 4, & 5) 3. For all environmental air exhaust: 3 feet from property lines; 3 feet from operable openings into building for all occupancies other than Group U, and 10 feet from mechanical air intakes. Such exhaust shall not be considered hazardous or noxious. Action required: Exhaust fan and RTU intake are in close proximity to each other. Minimum 10' required. To be field verified.
Licensed Contractors Rejected 07/28/2023 07/26/2023
Joe Frogge
LC - General Contractor
Corrective Action Required
07/26/2023

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent.
LC - MEP Subs
Corrective Action Required
07/26/2023

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Change of Tenant $800.00 $800.00 Paid 09/18/2023
$6,616.50
7232302-Commercial License Tax Fee $3,308.25 $3,308.25 Paid 07/19/2023
$3,308.25
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 03/22/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Electrical Inspection - Commercial Passed 10/20/2023 10/20/2023
Misc
Resolved
10/20/2023
Underslab Plumbing Inspection - Commercial Failed 10/20/2023 10/20/2023
Misc
Corrective Action Required
10/20/2023
-Perform pressure test on dwv system
Underslab Electrical Inspection - Commercial Passed 10/20/2023 10/20/2023
Misc
Resolved
10/20/2023
Underslab Plumbing Inspection - Commercial Passed 10/24/2023 10/24/2023 10/24/2023
Misc
Resolved
10/24/2023
-Perform pressure test on dwv system
Above Ceiling Inspection Failed 10/27/2023 10/27/2023 10/27/2023
Misc
Corrective Action Required
10/27/2023
10/27/23 **Inspection for product covering exposed insulation at ceiling joists only -Provide documentation for product being used-must meet ASTM 84 or UL 723 and have flame spread index not more than 25 and smoke developed index no more than 450
In-wall Inspection Partial 1/5/2024 1/5/2024 01/05/2024
Misc
Corrective Action Required
01/05/2024
Partial only: 107, 109, 110, 111, 112 ok to cover
Gas Service Inspection - Commercial Failed 1/8/2024 1/8/2024 01/08/2024
G406.4.1 Test pressure
Corrective Action Required
01/08/2024
INSPECTION, TESTING AND PURGING. AMENDED 7-608. The test pressure to be used shall be not less than one and one-half times the proposed maximum working pressure, but not less than 10 psig (68.9 kPa) irrespective of design pressure. For welded piping, and for piping carrying gas at pressures in excess of fourteen (14) inches water column pressure, the test pressure shall not be less than 60 psig. Where the test pressure exceeds 125 psig (862 kPa), the test pressure shall not exceed a value that produces a hoop stress in the piping greater than 50 percent of the specified minimum yield strength of the pipe.
Gas Service Inspection - Commercial Passed 1/11/2024 1/11/2024 01/11/2024
G406.4.1 Test pressure
Resolved
01/11/2024
INSPECTION, TESTING AND PURGING. AMENDED 7-608. The test pressure to be used shall be not less than one and one-half times the proposed maximum working pressure, but not less than 10 psig (68.9 kPa) irrespective of design pressure. For welded piping, and for piping carrying gas at pressures in excess of fourteen (14) inches water column pressure, the test pressure shall not be less than 60 psig. Where the test pressure exceeds 125 psig (862 kPa), the test pressure shall not exceed a value that produces a hoop stress in the piping greater than 50 percent of the specified minimum yield strength of the pipe.
Electrical Service Inspection Passed 1/31/2024 1/31/2024 01/31/2024
In-wall Inspection Passed 02/05/2024
Misc
Resolved
02/05/2024
Partial only: 107, 109, 110, 111, 112 ok to cover
Above Ceiling Inspection Passed 2/5/2024 2/5/2024 02/05/2024
Misc
Resolved
02/05/2024
10/27/23 **Inspection for product covering exposed insulation at ceiling joists only -Provide documentation for product being used-must meet ASTM 84 or UL 723 and have flame spread index not more than 25 and smoke developed index no more than 450
Miscellaneous Inspection Failed 3/4/2024 03/04/2024
Misc
Corrective Action Required
03/04/2024
complaint of trash and debris blowing off site from full dumpster. I left Tom a message MARK HARDING 03/04/2024 11:59 AM
Miscellaneous Inspection Passed 03/15/2024
Misc
Resolved
03/15/2024
complaint of trash and debris blowing off site from full dumpster. I left Tom a message MARK HARDING 03/04/2024 11:59 AM
Occupancy Inspection - Codes Commercial Failed 3/15/2024 3/15/2024 03/15/2024
Misc
Corrective Action Required
03/15/2024
**Not ready for occupancy, list may be incomplete -Complete all corrections for LSFD -Provide knee clearance at sink for ADA -Install spark rings at all tile wall receptacles -Provide hammer arrestors at dishwasher -Complete electrical throughout -GFCIs not tested due to lack of power -Provide panel schedule -GFCI protection at mop sink receptacle -Lower urinials to accessible height -Provide accessible restroom signage -Install toilet at north restroom' -Install handrail at back exit -Paint gas lines with corrosion resistant paint -Seal wall to floor line at restrooms -Provide ladder for roof access at next inspection
Occupancy Inspection - Codes Commercial Ready for Temp CO 3/22/2024 3/22/2024 03/22/2024
Misc
Corrective Action Required
03/15/2024
Complete all corrections for LSFD
Occupancy Inspection - Fire Temporary C of O 3/22/2024 3/22/2024 03/22/2024
Occupancy Inspection - Codes Commercial Full C of O 5/10/2024 5/10/2024 05/10/2024
Misc
Resolved
05/10/2024
Complete all corrections for LSFD
Occupancy Inspection - Fire Passed 5/10/2024 5/10/2024 05/10/2024
Documents & Images
Date Uploaded File Type Document Name
07/18/2023 Application Form 23033_LEOK Office Reno_LS_Commercial Permit Application_230718_Signed
07/19/2023 Plans 23033_LEOK Office Renovation_Permit Set_230718
07/28/2023 Letter DS P/R Corrections Document
08/08/2023 Letter 23033_LEOK Office Renovation_City Reponse Narrative_230808
08/08/2023 Plans 23033_LEOK Office Renovation_Delta1-Permit Set_230808
08/08/2023 Letter 23033_LEOK Office Renovation_Revision Narrative_230808
08/15/2023 Plans 23033_LEOK Office Renovation_Delta1_230808_combined_all
08/15/2023 Approved Plans approved - 23033_LEOK Office Renovation_Delta1_230808_combined_all
09/18/2023 Receipt Receipt for transaction: 2023-007140
09/18/2023 Letter DS Building Permit
10/20/2023 Letter INSPECTION SUMMARY
10/20/2023 Letter INSPECTION SUMMARY
10/20/2023 Letter INSPECTION SUMMARY
10/20/2023 Letter INSPECTION SUMMARY
10/20/2023 Letter INSPECTION SUMMARY
10/24/2023 Letter INSPECTION SUMMARY
10/27/2023 Letter INSPECTION SUMMARY
10/27/2023 insulation information
11/21/2023 Low-Gloss fire retardant paint information
01/05/2024 Letter INSPECTION SUMMARY
01/08/2024 Letter INSPECTION SUMMARY
01/11/2024 Letter INSPECTION SUMMARY
01/31/2024 Letter INSPECTION SUMMARY
02/05/2024 Letter INSPECTION SUMMARY
02/05/2024 Letter INSPECTION SUMMARY
03/04/2024 Letter INSPECTION SUMMARY
03/15/2024 Letter INSPECTION SUMMARY
03/15/2024 Letter INSPECTION SUMMARY
03/22/2024 Certificate/License Codes Temporary Certificate of Occupancy
03/22/2024 Receipt Receipt for transaction: 2024-001824
04/10/2024 Application Form TCOExtension Request Form
05/10/2024 Letter Codes Final Certificate of Occupancy
05/10/2024 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home