Permit Application Status

PRCOM20231513


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20231513
Building Permit - Commercial
Certificate of Occupancy
SAINT LUKES EAST HOSPITAL
ALTERATION COMMERCIAL
Renovation of the existing nuc-med space to make room for larger equipment and two new read rooms
04/07/2023
06/26/2023
04/23/2024
10/17/2023
Locations
Contacts
SAINT LUKES EAST HOSPITAL, Address:901 E 104TH ST MAILSTOP 900N  
MCCARTHY BUILDING COMPANIES INC, Address:12851 MANCHESTER RD, Phone:(314) 646-4179  
ERIC DILL, Phone:(937) 471-0653  
RAND CONSTRUCTION COMPANY, Address:1428 W 9TH ST, Phone:(816) 421-4143  
SHAW ELECTRIC COMPANY, Address:3600 FULLER, Phone:(816) 921-0033  
RAND CONSTRUCTION COMPANY, Address:1428 W 9TH ST, Phone:(816) 421-4143  
ACI BOLAND ARCHITECTS, Address:1710 WYANDOTTE ST, Phone:(816) 595-9513  
Reviews
Review Type Outcome Est. Completion Date Completed
Alarm Plan Review Released for Construction 09/19/2023 09/19/2023
Jim Eden
Miscellaneous Correction
Corrective Action Required
09/19/2023

Revised plans revceived 9/5/2023.
Sprinkler Plan Review Released for Construction 08/11/2023 08/10/2023
Jim Eden
Construction documents - Fire protection systems
Corrective Action Required
08/10/2023

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Plans received 7/28/2023.
Installation acceptance testing
Corrective Action Required
08/10/2023

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Visual inspection at occupancy inspection.
Alarm Plan Review Released for Construction 08/10/2023 08/10/2023
Jim Eden
Construction documents for fire alarm systems
Corrective Action Required
08/10/2023

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Plns received 7/27/2023.
Installation acceptance testing
Corrective Action Required
08/10/2023

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Tested at occupancy inspection.
Licensed Contractors Approved 04/19/2023 06/08/2023
Joe Frogge
LC - General Contractor
Resolved
06/08/2023

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent.
LC - MEP Subs
Resolved
06/08/2023

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Approved with Conditions 04/19/2023 04/18/2023
Jim Eden
Construction documents - Fire protection systems
Corrective Action Required
04/18/2023

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide shop or as built drawings for review and approval. All sprinkler and alarm notification coverage will be verified at inspection.
Building Plan Review Approved 04/19/2023 04/10/2023
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Alteration to Commercial $2,560.00 $2,560.00 Paid 06/26/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Partial 7/27/2023 7/27/2023 07/27/2023
Misc
Informational
07/27/2023
*Phase One of Two: Read Room #1 – 1C137, Read Room #2 – 1C135, Corridor C138, Scan Room 1C136, and Control Room 1C130.
Above Ceiling Inspection Failed 8/18/2023 8/18/2023 08/18/2023
Misc
Corrective Action Required
08/18/2023
-Secure all electrical within 12" of boxes -Support all LV off of grid -Seal gaps and penetrations and complete rock at smoke walls -Label smoke walls
Above Ceiling Inspection Failed 08/18/2023
Misc
Corrective Action Required
08/18/2023
-Secure all electrical within 12" of boxes -Support all LV off of grid -Seal gaps and penetrations at smoke walls -Label smoke walls -Cover all Open holes in j boxes -Remove tile for inspection
Above Ceiling Inspection Partial 8/21/2023 8/21/2023 08/21/2023
Misc
Corrective Action Required
08/18/2023
*Phase One of Two: Read Room #1 – 1C137, Read Room #2 – 1C135, Corridor C138, Scan Room 1C136, and Control Room 1C130.
Above Ceiling Inspection Partial 9/8/2023 9/8/2023 09/08/2023
Misc
Corrective Action Required
08/21/2023
*Phase One of Two: Read Room #1 – 1C137, Read Room #2 – 1C135, Corridor C138, Scan Room 1C136, and Control Room 1C130.
In-wall Inspection Partial 9/18/2023 9/18/2023 09/18/2023
Misc
Informational
07/27/2023
*Phase One of Two: Read Room #1 – 1C137, Read Room #2 – 1C135, Corridor C138, Scan Room 1C136, and Control Room 1C130 **Phase Two: Recovery room 1c101
Above Ceiling Inspection Passed 10/2/2023 10/2/2023 10/02/2023
Misc
Resolved
10/02/2023
*Phase One of Two: Read Room #1 – 1C137, Read Room #2 – 1C135, Corridor C138, Scan Room 1C136, and Control Room 1C130.
Alarm Test Passed 10/13/2023 10/13/2023
In-wall Inspection Passed 10/17/2023
Misc
Resolved
10/17/2023
*Phase One of Two: Read Room #1 – 1C137, Read Room #2 – 1C135, Corridor C138, Scan Room 1C136, and Control Room 1C130 **Phase Two: Recovery room 1c101
Occupancy Inspection - Codes Commercial Full C of O 10/17/2023 10/17/2023 10/17/2023
Occupancy Inspection - Fire Passed 10/17/2023 10/17/2023 10/17/2023
Documents & Images
Date Uploaded File Type Document Name
04/07/2023 Application Form Comm Permit Application - SLE NUC MED 23-0407
04/07/2023 Plans Siemens vendor package 2204910R0
04/07/2023 Specifications SLE NUC MED SPEC 23-0407
04/07/2023 Plans SLE NUC-MED PLANS 23-0407
04/18/2023 Approved Plans approved - SLE NUC-MED PLANS 23-0407
06/26/2023 Receipt Receipt for transaction: 2023-004851
06/26/2023 Letter DS Building Permit
07/27/2023 283100 Fire Alarm Shop Drawings - MCC Reviewed
07/27/2023 Letter INSPECTION SUMMARY
07/28/2023 SLE SPECT CT - Fire Sprinkler Drawings SK1046 - PE STAMPED
08/10/2023 283100 Fire Alarm Shop Drawings - MCC Reviewed APPROVED
08/10/2023 Letter Fire (Alarm) Plan Review Notice
08/10/2023 Letter Fire (Sprinkler) Plan Review
08/10/2023 SLE SPECT CT - Fire Sprinkler Drawings SK1046 - PE STAMPED APPROVED
08/18/2023 Letter INSPECTION SUMMARY
08/18/2023 Letter INSPECTION SUMMARY
08/21/2023 Letter INSPECTION SUMMARY
08/28/2023 SLE SPECT CT - RESPONSE LETTER
09/05/2023 Updated Fire Alarm Drawings - Sep
09/08/2023 Letter INSPECTION SUMMARY
09/18/2023 Letter INSPECTION SUMMARY
09/19/2023 Letter Fire (Alarm) Plan Review Notice
09/19/2023 Updated Fire Alarm Drawings - Sep APPROVED
10/02/2023 Letter INSPECTION SUMMARY
10/17/2023 Letter Codes Final Certificate of Occupancy
10/17/2023 Letter Field Certificate of Occupancy
10/17/2023 Letter INSPECTION SUMMARY
10/17/2023 Letter INSPECTION SUMMARY
10/17/2023 Letter Fire (Sprinkler) Plan Review
10/17/2023 Letter Fire (Sprinkler) Plan Review
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home