Summary
PRCOM20230845
Building Permit - Commercial
Final Completion
ALTERATION COMMERCIAL
NEW HVAC FOR FUTURE TENANTS ** - invite planner to final to verify screening
02/28/2023
03/17/2023
09/11/2023
05/23/2023
Locations
Contacts
Monarch Build, LLC, Address:8100 Newton Street Ste 300, Phone:(913) 942-2400  
HENRY MILLER MECHANICAL LLC, Address:6609 ROYAL ST, SUITE 104, Phone:(816) 883-8818  
TEAGUE ELECTRIC CONSTRUCTION INC, Address:12425 W 92ND ST, Phone:(913) 529-4600  
david.adams@monarch.build  
AEC Architectural Engineering Consortium, Address:10233 Millstone dr, #4112, Phone:(816) 916-4675  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Plan Review Approved with Conditions 03/22/2023 03/15/2023
Joe Frogge
Planning - Screening of rooftop equipment
Corrective Action Required
03/15/2023

Unified Development Ordinance Article 8, Section 8.180.E Roof mounted equipment – All roof-mounted equipment shall be screened entirely from view by using parapet walls at the same height as the mechanical units. For additions to existing buildings that do not meet this standard, individual screens will be permitted, with the design subject to approval by the Director. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened from all 4 sides per referenced UDO section. 3/8/23 - not addressed 3/14/23 - Existing parapets are adequate per architect. To be field verified.
IMC 306.5 Equipment on roofs
Corrective Action Required
03/15/2023

2018 IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment requiring access or appliances are located on an elevated structure or the roof of a building such that personnel will have to climb higher than 16 feet above grade to access such equipment or appliances, an interior or exterior means of access shall be provided. Such access shall not require climbing over obstructions greater than 30 inches in height or walking on roofs having a slope greater than 4 units vertical in 12 units horizontal. Such access shall not require the use of portable ladders. Where access involves climbing over parapet walls, the height shall be measured to the top of the parapet wall. Permanent ladders installed to provide the required access shall comply with the following minimum design criteria: 1. The side railing shall extend above the parapet or roof edge not less than 30" (see code section for additional construction requirements) Action required: Provide permanent access each roof section that has hvac equipment. 3/8/23 - not addressed 3/14/23 - Provided at shell per architect. To be field verified.
IBC 1015.6 Mechanical equipment, systems and devices - hvac within 10 feet of roof edge
Resolved
03/15/2023

2018 IBC 1015.6 Mechanical equipment, systems and devices. Guards shall be provided where various components that require service are located within 10 feet of a roof edge or open side of a walking surface and such edge or open side is located more than 30 inches above the floor, roof or grade below. The guard shall extend not less than 30 inches beyond each end of such components. The guard shall be constructed so as to prevent the passage of a sphere 21 inches in diameter. Action required: Provide guards at parapets or provide verification that existing parapets are adequate. 3/8/23 - not addressed. 3/14/23 - RTU's still shown within 10' of roof edge and noted that 30" protection is adequate when minimum 42" guards are required.
Miscellaneous Correction
Corrective Action Required
03/15/2023

Some of these walls and/or horizontal assemblies are fire rated and will require firestopping at penetrations. Action required: Comment is informational. To be field verified.
Licensed Contractors Approved 03/15/2023 03/15/2023
Joe Frogge
Building Plan Review Rejected 03/21/2023 03/14/2023
Joe Frogge
Planning - Screening of rooftop equipment
Corrective Action Required
03/14/2023

Unified Development Ordinance Article 8, Section 8.180.E Roof mounted equipment – All roof-mounted equipment shall be screened entirely from view by using parapet walls at the same height as the mechanical units. For additions to existing buildings that do not meet this standard, individual screens will be permitted, with the design subject to approval by the Director. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened from all 4 sides per referenced UDO section. 3/8/23 - not addressed 3/14/23 - Existing parapets are adequate per architect. To be field verified.
IMC 306.5 Equipment on roofs
Corrective Action Required
03/14/2023

2018 IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment requiring access or appliances are located on an elevated structure or the roof of a building such that personnel will have to climb higher than 16 feet above grade to access such equipment or appliances, an interior or exterior means of access shall be provided. Such access shall not require climbing over obstructions greater than 30 inches in height or walking on roofs having a slope greater than 4 units vertical in 12 units horizontal. Such access shall not require the use of portable ladders. Where access involves climbing over parapet walls, the height shall be measured to the top of the parapet wall. Permanent ladders installed to provide the required access shall comply with the following minimum design criteria: 1. The side railing shall extend above the parapet or roof edge not less than 30" (see code section for additional construction requirements) Action required: Provide permanent access each roof section that has hvac equipment. 3/8/23 - not addressed 3/14/23 - Provided at shell per architect. To be field verified.
Misc
Resolved
03/14/2023

Provide roof curb details. 3/8/23 - not addressed
IBC 1015.6 Mechanical equipment, systems and devices - hvac within 10 feet of roof edge
Corrective Action Required
03/14/2023

2018 IBC 1015.6 Mechanical equipment, systems and devices. Guards shall be provided where various components that require service are located within 10 feet of a roof edge or open side of a walking surface and such edge or open side is located more than 30 inches above the floor, roof or grade below. The guard shall extend not less than 30 inches beyond each end of such components. The guard shall be constructed so as to prevent the passage of a sphere 21 inches in diameter. Action required: Provide guards at parapets or provide verification that existing parapets are adequate. 3/8/23 - not addressed. 3/14/23 - RTU's still shown within 10' of roof edge and noted that 30" protection is adequate when minimum 42" guards are required.
Miscellaneous Correction
Resolved
03/14/2023

Provide FCU support details. 3/8/23 - not addressed
IMC 307.2 Condensate disposal
Resolved
03/14/2023

2018 IMC 307.2 Evaporators and cooling coils. Condensate drain systems shall be provided for equipment and appliances containing evaporators or cooling coils. Condensate drain systems shall be designed, constructed and installed in accordance with Sections 307.2.1 through 307.2.4. 2018 IMC 307.2.1 Condensate disposal. Condensate from all cooling coils and evaporators shall be conveyed from the drain pan outlet to an approved place of disposal. Such piping shall maintain a minimum horizontal slope in the direction of discharge of not less than one-eighth unit vertical in 12 units horizontal. Condensate shall not discharge into a street, alley or other areas so as to cause a nuisance. Action required: Condensate piping noted to be routed to floor drains that do not exist. Clarify. 3/8/23 - not addressed 3/14/23 - Floor drains were installed at shell per architect's letter. To be field verified.
Miscellaneous Correction
Corrective Action Required
03/14/2023

Some of these walls and/or horizontal assemblies are fire rated and will require firestopping at penetrations. Action required: Comment is informational. To be field verified.
Licensed Contractors Approved 03/14/2023 03/14/2023
Joe Frogge
Building Plan Review Rejected 03/15/2023 03/08/2023
Joe Frogge
IBC 1606.2 Design dead load - structural
Resolved
03/08/2023

2018 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official. Action required: Provide engineer’s report to verify that existing roof and floor structures will support additional load. (must cover both roof mount and ceiling supported)
Planning - Screening of rooftop equipment
Corrective Action Required
03/08/2023

Unified Development Ordinance Article 8, Section 8.180.E Roof mounted equipment – All roof-mounted equipment shall be screened entirely from view by using parapet walls at the same height as the mechanical units. For additions to existing buildings that do not meet this standard, individual screens will be permitted, with the design subject to approval by the Director. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened from all 4 sides per referenced UDO section. 3/8/23 - not addressed
IMC 306.5 Equipment on roofs
Corrective Action Required
03/08/2023

2018 IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment requiring access or appliances are located on an elevated structure or the roof of a building such that personnel will have to climb higher than 16 feet above grade to access such equipment or appliances, an interior or exterior means of access shall be provided. Such access shall not require climbing over obstructions greater than 30 inches in height or walking on roofs having a slope greater than 4 units vertical in 12 units horizontal. Such access shall not require the use of portable ladders. Where access involves climbing over parapet walls, the height shall be measured to the top of the parapet wall. Permanent ladders installed to provide the required access shall comply with the following minimum design criteria: 1. The side railing shall extend above the parapet or roof edge not less than 30" (see code section for additional construction requirements) Action required: Provide permanent access each roof section that has hvac equipment. 3/8/23 - not addressed
NEC Article 210.63 Heating, air-conditioning and refrigeration outlet
Resolved
03/08/2023

2017 NEC Article 210.63 Heating, Air-Conditioning, and Refrigeration Equipment Outlet. A 125-volt, single-phase, 15- or 20-ampere-rated receptacle outlet shall be installed at an accessible location for the servicing of heating, air-conditioning, and refrigeration equipment. The receptacle shall be located on the same level and within 25 feet of the heating, air-conditioning, and refrigeration equipment. The receptacle outlet shall not be connected to the load side of the equipment disconnecting means. Action required: Provide additional receptacle(s) to comply.
Misc
Corrective Action Required
03/08/2023

Provide roof curb details. 3/8/23 - not addressed
IBC 1015.6 Mechanical equipment, systems and devices - hvac within 10 feet of roof edge
Corrective Action Required
03/08/2023

2018 IBC 1015.6 Mechanical equipment, systems and devices. Guards shall be provided where various components that require service are located within 10 feet of a roof edge or open side of a walking surface and such edge or open side is located more than 30 inches above the floor, roof or grade below. The guard shall extend not less than 30 inches beyond each end of such components. The guard shall be constructed so as to prevent the passage of a sphere 21 inches in diameter. Action required: Provide guards at parapets or provide verification that existing parapets are adequate. 3/8/23 - not addressed
Miscellaneous Correction
Corrective Action Required
03/08/2023

Provide FCU support details. 3/8/23 - not addressed
IMC 307.2 Condensate disposal
Corrective Action Required
03/08/2023

2018 IMC 307.2 Evaporators and cooling coils. Condensate drain systems shall be provided for equipment and appliances containing evaporators or cooling coils. Condensate drain systems shall be designed, constructed and installed in accordance with Sections 307.2.1 through 307.2.4. 2018 IMC 307.2.1 Condensate disposal. Condensate from all cooling coils and evaporators shall be conveyed from the drain pan outlet to an approved place of disposal. Such piping shall maintain a minimum horizontal slope in the direction of discharge of not less than one-eighth unit vertical in 12 units horizontal. Condensate shall not discharge into a street, alley or other areas so as to cause a nuisance. Action required: Condensate piping noted to be routed to floor drains that do not exist. Clarify. 3/8/23 - not addressed
Miscellaneous Correction
Corrective Action Required
03/08/2023

Some of these walls and/or horizontal assemblies are fire rated and will require firestopping at penetrations. Action required: Comment is informational. To be field verified.
Licensed Contractors Approved 03/08/2023 03/08/2023
Joe Frogge
Building Plan Review Rejected 03/10/2023 02/28/2023
Joe Frogge
IBC 1606.2 Design dead load - structural
Corrective Action Required
02/28/2023

2018 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official. Action required: Provide engineer’s report to verify that existing roof and floor structures will support additional load. (must cover both roof mount and ceiling supported)
Planning - Screening of rooftop equipment
Corrective Action Required
02/28/2023

Unified Development Ordinance Article 8, Section 8.180.E Roof mounted equipment – All roof-mounted equipment shall be screened entirely from view by using parapet walls at the same height as the mechanical units. For additions to existing buildings that do not meet this standard, individual screens will be permitted, with the design subject to approval by the Director. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened from all 4 sides per referenced UDO section.
IMC 306.5 Equipment on roofs
Corrective Action Required
02/28/2023

2018 IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment requiring access or appliances are located on an elevated structure or the roof of a building such that personnel will have to climb higher than 16 feet above grade to access such equipment or appliances, an interior or exterior means of access shall be provided. Such access shall not require climbing over obstructions greater than 30 inches in height or walking on roofs having a slope greater than 4 units vertical in 12 units horizontal. Such access shall not require the use of portable ladders. Where access involves climbing over parapet walls, the height shall be measured to the top of the parapet wall. Permanent ladders installed to provide the required access shall comply with the following minimum design criteria: 1. The side railing shall extend above the parapet or roof edge not less than 30" (see code section for additional construction requirements) Action required: Provide permanent access each roof section that has hvac equipment.
NEC Article 210.63 Heating, air-conditioning and refrigeration outlet
Corrective Action Required
02/28/2023

2017 NEC Article 210.63 Heating, Air-Conditioning, and Refrigeration Equipment Outlet. A 125-volt, single-phase, 15- or 20-ampere-rated receptacle outlet shall be installed at an accessible location for the servicing of heating, air-conditioning, and refrigeration equipment. The receptacle shall be located on the same level and within 25 feet of the heating, air-conditioning, and refrigeration equipment. The receptacle outlet shall not be connected to the load side of the equipment disconnecting means. Action required: Provide additional receptacle(s) to comply.
Misc
Corrective Action Required
02/28/2023

Provide roof curb details.
IBC 1015.6 Mechanical equipment, systems and devices - hvac within 10 feet of roof edge
Corrective Action Required
02/28/2023

2018 IBC 1015.6 Mechanical equipment, systems and devices. Guards shall be provided where various components that require service are located within 10 feet of a roof edge or open side of a walking surface and such edge or open side is located more than 30 inches above the floor, roof or grade below. The guard shall extend not less than 30 inches beyond each end of such components. The guard shall be constructed so as to prevent the passage of a sphere 21 inches in diameter. Action required: Provide guards at parapets or provide verification that existing parapets are adequate.
Miscellaneous Correction
Corrective Action Required
02/28/2023

Provide FCU support details.
IMC 307.2 Condensate disposal
Corrective Action Required
02/28/2023

2018 IMC 307.2 Evaporators and cooling coils. Condensate drain systems shall be provided for equipment and appliances containing evaporators or cooling coils. Condensate drain systems shall be designed, constructed and installed in accordance with Sections 307.2.1 through 307.2.4. 2018 IMC 307.2.1 Condensate disposal. Condensate from all cooling coils and evaporators shall be conveyed from the drain pan outlet to an approved place of disposal. Such piping shall maintain a minimum horizontal slope in the direction of discharge of not less than one-eighth unit vertical in 12 units horizontal. Condensate shall not discharge into a street, alley or other areas so as to cause a nuisance. Action required: Condensate piping noted to be routed to floor drains that do not exist. Clarify.
Miscellaneous Correction
Corrective Action Required
02/28/2023

Some of these walls and/or horizontal assemblies are fire rated and will require firestopping at penetrations. Action required: Comment is informational. To be field verified.
Licensed Contractors Approved 02/28/2023 02/28/2023
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Alteration to Commercial $700.00 $700.00 Paid 03/15/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Final Mechanical Inspection Failed 5/19/2023 5/19/2023 05/19/2023
Misc
Corrective Action Required
05/19/2023
-Lable all RTU's and have all corresponding electrical panels labled
Resolved
05/19/2023
Rough Electrical Inspection - Commercial Passed 5/23/2023 05/23/2023
Final Electrical Inspection - Commercial Passed 5/23/2023 05/23/2023
Final Mechanical Inspection Passed 5/23/2023 05/23/2023
Misc
Resolved
05/23/2023
In-wall Inspection Passed 05/23/2023
Above Ceiling Inspection Passed 05/23/2023
Documents & Images
Date Uploaded File Type Document Name
02/28/2023 Application Form APPLICATION
02/28/2023 Plans NLV HVAC Combined - 2_27_2023
02/28/2023 Letter DS P/R Corrections Document
03/08/2023 Plans 23-031_E_Plancheck
03/08/2023 Engineer Report/Study 23-0308 Roof Top Units
03/08/2023 Drawing NVL Shell - Mechanical
03/08/2023 Letter DS P/R Corrections Document
03/14/2023 Letter 2310200E City Comments -Responses - 03-14-23
03/14/2023 Letter 20230307 NLV Building 31 - HVAC architect letter
03/14/2023 Drawing NVL Shell - Mechanical (1)
03/14/2023 Letter DS P/R Corrections Document
03/15/2023 Drawing NVL Shell - Mechanical (4)
03/15/2023 Approved Plans approved - NVL Shell - Mechanical (4)
03/15/2023 Receipt Receipt for transaction:2023-001470
05/19/2023 Letter INSPECTION SUMMARY
05/23/2023 Letter INSPECTION SUMMARY
05/23/2023 Letter INSPECTION SUMMARY
05/23/2023 Letter INSPECTION SUMMARY
05/23/2023 Letter INSPECTION SUMMARY
05/23/2023 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents