Review Type |
Outcome |
Est. Completion Date |
Completed |
Building Plan Review
|
Approved with Conditions
|
03/22/2023
|
03/15/2023
|
|
Joe Frogge
|
|
Planning - Screening of rooftop equipment
Corrective Action Required
Unified Development Ordinance Article 8, Section 8.180.E
Roof mounted equipment – All roof-mounted equipment shall be screened entirely from view by using parapet walls at the same height as the mechanical units. For additions to existing buildings that do not meet this standard, individual screens will be permitted, with the design subject to approval by the Director.
Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened from all 4 sides per referenced UDO section.
3/8/23 - not addressed
3/14/23 - Existing parapets are adequate per architect. To be field verified.
|
|
IMC 306.5 Equipment on roofs
Corrective Action Required
2018 IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment requiring access or appliances are located on an elevated structure or the roof of a building such that personnel will have to climb higher than 16 feet above grade to access such equipment or appliances, an interior or exterior means of access shall be provided. Such access shall not require climbing over obstructions greater than 30 inches in height or walking on roofs having a slope greater than 4 units vertical in 12 units horizontal. Such access shall not require the use of portable ladders. Where access involves climbing over parapet walls, the height shall be measured to the top of the parapet wall. Permanent ladders installed to provide the required access shall comply with the following minimum design criteria: 1. The side railing shall extend above the parapet or roof edge not less than 30"
(see code section for additional construction requirements)
Action required: Provide permanent access each roof section that has hvac equipment.
3/8/23 - not addressed
3/14/23 - Provided at shell per architect. To be field verified.
|
|
IBC 1015.6 Mechanical equipment, systems and devices - hvac within 10 feet of roof edge
2018 IBC 1015.6 Mechanical equipment, systems and devices. Guards shall be provided where various components that require service are located within 10 feet of a roof edge or open side of a walking surface and such edge or open side is located more than 30 inches above the floor, roof or grade below. The guard shall extend not less than 30 inches beyond each end of such components. The guard shall be constructed so as to prevent the passage of a sphere 21 inches in diameter.
Action required: Provide guards at parapets or provide verification that existing parapets are adequate.
3/8/23 - not addressed.
3/14/23 - RTU's still shown within 10' of roof edge and noted that 30" protection is adequate when minimum 42" guards are required.
|
|
Miscellaneous Correction
Corrective Action Required
Some of these walls and/or horizontal assemblies are fire rated and will require firestopping at penetrations.
Action required: Comment is informational. To be field verified.
|
|
|
Licensed Contractors
|
Approved
|
03/15/2023
|
03/15/2023
|
|
Joe Frogge
|
|
|
Building Plan Review
|
Rejected
|
03/21/2023
|
03/14/2023
|
|
Joe Frogge
|
|
Planning - Screening of rooftop equipment
Corrective Action Required
Unified Development Ordinance Article 8, Section 8.180.E
Roof mounted equipment – All roof-mounted equipment shall be screened entirely from view by using parapet walls at the same height as the mechanical units. For additions to existing buildings that do not meet this standard, individual screens will be permitted, with the design subject to approval by the Director.
Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened from all 4 sides per referenced UDO section.
3/8/23 - not addressed
3/14/23 - Existing parapets are adequate per architect. To be field verified.
|
|
IMC 306.5 Equipment on roofs
Corrective Action Required
2018 IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment requiring access or appliances are located on an elevated structure or the roof of a building such that personnel will have to climb higher than 16 feet above grade to access such equipment or appliances, an interior or exterior means of access shall be provided. Such access shall not require climbing over obstructions greater than 30 inches in height or walking on roofs having a slope greater than 4 units vertical in 12 units horizontal. Such access shall not require the use of portable ladders. Where access involves climbing over parapet walls, the height shall be measured to the top of the parapet wall. Permanent ladders installed to provide the required access shall comply with the following minimum design criteria: 1. The side railing shall extend above the parapet or roof edge not less than 30"
(see code section for additional construction requirements)
Action required: Provide permanent access each roof section that has hvac equipment.
3/8/23 - not addressed
3/14/23 - Provided at shell per architect. To be field verified.
|
|
Misc
Provide roof curb details.
3/8/23 - not addressed
|
|
IBC 1015.6 Mechanical equipment, systems and devices - hvac within 10 feet of roof edge
Corrective Action Required
2018 IBC 1015.6 Mechanical equipment, systems and devices. Guards shall be provided where various components that require service are located within 10 feet of a roof edge or open side of a walking surface and such edge or open side is located more than 30 inches above the floor, roof or grade below. The guard shall extend not less than 30 inches beyond each end of such components. The guard shall be constructed so as to prevent the passage of a sphere 21 inches in diameter.
Action required: Provide guards at parapets or provide verification that existing parapets are adequate.
3/8/23 - not addressed.
3/14/23 - RTU's still shown within 10' of roof edge and noted that 30" protection is adequate when minimum 42" guards are required.
|
|
Miscellaneous Correction
Provide FCU support details.
3/8/23 - not addressed
|
|
IMC 307.2 Condensate disposal
2018 IMC 307.2 Evaporators and cooling coils. Condensate drain systems shall be provided for equipment and appliances containing evaporators or cooling coils. Condensate drain systems shall be designed, constructed and installed in accordance with Sections 307.2.1 through 307.2.4. 2018 IMC 307.2.1 Condensate disposal. Condensate from all cooling coils and evaporators shall be conveyed from the drain pan outlet to an approved place of disposal. Such piping shall maintain a minimum horizontal slope in the direction of discharge of not less than one-eighth unit vertical in 12 units horizontal. Condensate shall not discharge into a street, alley or other areas so as to cause a nuisance.
Action required: Condensate piping noted to be routed to floor drains that do not exist. Clarify.
3/8/23 - not addressed
3/14/23 - Floor drains were installed at shell per architect's letter. To be field verified.
|
|
Miscellaneous Correction
Corrective Action Required
Some of these walls and/or horizontal assemblies are fire rated and will require firestopping at penetrations.
Action required: Comment is informational. To be field verified.
|
|
|
Licensed Contractors
|
Approved
|
03/14/2023
|
03/14/2023
|
|
Joe Frogge
|
|
|
Building Plan Review
|
Rejected
|
03/15/2023
|
03/08/2023
|
|
Joe Frogge
|
|
IBC 1606.2 Design dead load - structural
2018 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official.
Action required: Provide engineer’s report to verify that existing roof and floor structures will support additional load. (must cover both roof mount and ceiling supported)
|
|
Planning - Screening of rooftop equipment
Corrective Action Required
Unified Development Ordinance Article 8, Section 8.180.E
Roof mounted equipment – All roof-mounted equipment shall be screened entirely from view by using parapet walls at the same height as the mechanical units. For additions to existing buildings that do not meet this standard, individual screens will be permitted, with the design subject to approval by the Director.
Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened from all 4 sides per referenced UDO section.
3/8/23 - not addressed
|
|
IMC 306.5 Equipment on roofs
Corrective Action Required
2018 IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment requiring access or appliances are located on an elevated structure or the roof of a building such that personnel will have to climb higher than 16 feet above grade to access such equipment or appliances, an interior or exterior means of access shall be provided. Such access shall not require climbing over obstructions greater than 30 inches in height or walking on roofs having a slope greater than 4 units vertical in 12 units horizontal. Such access shall not require the use of portable ladders. Where access involves climbing over parapet walls, the height shall be measured to the top of the parapet wall. Permanent ladders installed to provide the required access shall comply with the following minimum design criteria: 1. The side railing shall extend above the parapet or roof edge not less than 30"
(see code section for additional construction requirements)
Action required: Provide permanent access each roof section that has hvac equipment.
3/8/23 - not addressed
|
|
NEC Article 210.63 Heating, air-conditioning and refrigeration outlet
2017 NEC Article 210.63 Heating, Air-Conditioning, and Refrigeration Equipment Outlet. A 125-volt, single-phase, 15- or 20-ampere-rated receptacle outlet shall be installed at an accessible location for the servicing of heating, air-conditioning, and refrigeration equipment. The receptacle shall be located on the same level and within 25 feet of the heating, air-conditioning, and refrigeration equipment. The receptacle outlet shall not be connected to the load side of the equipment disconnecting means.
Action required: Provide additional receptacle(s) to comply.
|
|
Misc
Corrective Action Required
Provide roof curb details.
3/8/23 - not addressed
|
|
IBC 1015.6 Mechanical equipment, systems and devices - hvac within 10 feet of roof edge
Corrective Action Required
2018 IBC 1015.6 Mechanical equipment, systems and devices. Guards shall be provided where various components that require service are located within 10 feet of a roof edge or open side of a walking surface and such edge or open side is located more than 30 inches above the floor, roof or grade below. The guard shall extend not less than 30 inches beyond each end of such components. The guard shall be constructed so as to prevent the passage of a sphere 21 inches in diameter.
Action required: Provide guards at parapets or provide verification that existing parapets are adequate.
3/8/23 - not addressed
|
|
Miscellaneous Correction
Corrective Action Required
Provide FCU support details.
3/8/23 - not addressed
|
|
IMC 307.2 Condensate disposal
Corrective Action Required
2018 IMC 307.2 Evaporators and cooling coils. Condensate drain systems shall be provided for equipment and appliances containing evaporators or cooling coils. Condensate drain systems shall be designed, constructed and installed in accordance with Sections 307.2.1 through 307.2.4. 2018 IMC 307.2.1 Condensate disposal. Condensate from all cooling coils and evaporators shall be conveyed from the drain pan outlet to an approved place of disposal. Such piping shall maintain a minimum horizontal slope in the direction of discharge of not less than one-eighth unit vertical in 12 units horizontal. Condensate shall not discharge into a street, alley or other areas so as to cause a nuisance.
Action required: Condensate piping noted to be routed to floor drains that do not exist. Clarify.
3/8/23 - not addressed
|
|
Miscellaneous Correction
Corrective Action Required
Some of these walls and/or horizontal assemblies are fire rated and will require firestopping at penetrations.
Action required: Comment is informational. To be field verified.
|
|
|
Licensed Contractors
|
Approved
|
03/08/2023
|
03/08/2023
|
|
Joe Frogge
|
|
|
Building Plan Review
|
Rejected
|
03/10/2023
|
02/28/2023
|
|
Joe Frogge
|
|
IBC 1606.2 Design dead load - structural
Corrective Action Required
2018 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official.
Action required: Provide engineer’s report to verify that existing roof and floor structures will support additional load. (must cover both roof mount and ceiling supported)
|
|
Planning - Screening of rooftop equipment
Corrective Action Required
Unified Development Ordinance Article 8, Section 8.180.E
Roof mounted equipment – All roof-mounted equipment shall be screened entirely from view by using parapet walls at the same height as the mechanical units. For additions to existing buildings that do not meet this standard, individual screens will be permitted, with the design subject to approval by the Director.
Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened from all 4 sides per referenced UDO section.
|
|
IMC 306.5 Equipment on roofs
Corrective Action Required
2018 IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment requiring access or appliances are located on an elevated structure or the roof of a building such that personnel will have to climb higher than 16 feet above grade to access such equipment or appliances, an interior or exterior means of access shall be provided. Such access shall not require climbing over obstructions greater than 30 inches in height or walking on roofs having a slope greater than 4 units vertical in 12 units horizontal. Such access shall not require the use of portable ladders. Where access involves climbing over parapet walls, the height shall be measured to the top of the parapet wall. Permanent ladders installed to provide the required access shall comply with the following minimum design criteria: 1. The side railing shall extend above the parapet or roof edge not less than 30"
(see code section for additional construction requirements)
Action required: Provide permanent access each roof section that has hvac equipment.
|
|
NEC Article 210.63 Heating, air-conditioning and refrigeration outlet
Corrective Action Required
2017 NEC Article 210.63 Heating, Air-Conditioning, and Refrigeration Equipment Outlet. A 125-volt, single-phase, 15- or 20-ampere-rated receptacle outlet shall be installed at an accessible location for the servicing of heating, air-conditioning, and refrigeration equipment. The receptacle shall be located on the same level and within 25 feet of the heating, air-conditioning, and refrigeration equipment. The receptacle outlet shall not be connected to the load side of the equipment disconnecting means.
Action required: Provide additional receptacle(s) to comply.
|
|
Misc
Corrective Action Required
Provide roof curb details.
|
|
IBC 1015.6 Mechanical equipment, systems and devices - hvac within 10 feet of roof edge
Corrective Action Required
2018 IBC 1015.6 Mechanical equipment, systems and devices. Guards shall be provided where various components that require service are located within 10 feet of a roof edge or open side of a walking surface and such edge or open side is located more than 30 inches above the floor, roof or grade below. The guard shall extend not less than 30 inches beyond each end of such components. The guard shall be constructed so as to prevent the passage of a sphere 21 inches in diameter.
Action required: Provide guards at parapets or provide verification that existing parapets are adequate.
|
|
Miscellaneous Correction
Corrective Action Required
Provide FCU support details.
|
|
IMC 307.2 Condensate disposal
Corrective Action Required
2018 IMC 307.2 Evaporators and cooling coils. Condensate drain systems shall be provided for equipment and appliances containing evaporators or cooling coils. Condensate drain systems shall be designed, constructed and installed in accordance with Sections 307.2.1 through 307.2.4. 2018 IMC 307.2.1 Condensate disposal. Condensate from all cooling coils and evaporators shall be conveyed from the drain pan outlet to an approved place of disposal. Such piping shall maintain a minimum horizontal slope in the direction of discharge of not less than one-eighth unit vertical in 12 units horizontal. Condensate shall not discharge into a street, alley or other areas so as to cause a nuisance.
Action required: Condensate piping noted to be routed to floor drains that do not exist. Clarify.
|
|
Miscellaneous Correction
Corrective Action Required
Some of these walls and/or horizontal assemblies are fire rated and will require firestopping at penetrations.
Action required: Comment is informational. To be field verified.
|
|
|
Licensed Contractors
|
Approved
|
02/28/2023
|
02/28/2023
|
|
Joe Frogge
|
|
|