Permit Application Status

PRCOM20226048


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20226048
Building Permit - Commercial
Certificate of Occupancy
NEW COMMERCIAL
INSTALLING NEW ATM FOR LEE'S SUMMIT COMMERCE BANK
12/09/2022
05/10/2023
08/05/2023
09/01/2131
Locations
Contacts
Jeff Brocco , Address:Farnsworth Group, Phone:(314) 962-7900  
ZERNCO INC, Address:2800 N REGENCY PARK, Phone:(316) 775-9991  
Sonia Salinas - Zernco, Phone:(316) 613-1015  
SJ ELECTRIC LLC, Address:PO BOX 1209, Phone:(913) 837-3549  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 03/01/2023 05/01/2023
Joe Frogge
LC - General Contractor
Resolved
05/01/2023

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent. 2/22/23 - acknowledged in letter
LC - MEP Subs
Resolved
05/01/2023

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 2/22/23 - acknowledged in letter
Final Development Plan Review Approved 05/02/2023 04/26/2023
Scott Ready
Commerce Bank Remote ATM
Building Plan Review Approved 03/01/2023 03/17/2023
Joe Frogge
Final Development Plan
Resolved
03/02/2023

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational.
Gen - Design professional seals
Resolved
02/22/2023

Missouri Board for Architects, Professional Engineers, Professional Land Surveyors and Professional Landscape Architects – Board Rules, Division 2030 – Chapter 3, 20 CSR 2030-3.060 Licensees Seal Documents must bear design professionals original seal with signature and date. (relevant portion paraphrased – reference original document for additional information) Action required: Structural drawings are to bear dated seal and signature from architect/engineer of record. (re: canopy and footings)
IBC 502.1 - Address Identification
Resolved
02/22/2023

2018 IBC 502.1 Address identification. New and existing buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be a minimum of 4 inches high with a minimum stroke width of ½ inch. Where required by the fire code official, address identification shall be provided in additional approved locations to facilitate emergency response. Where access is by means of a private road and the building address cannot be viewed from the public way, a monument, pole or other approved sign or means shall be used to identify the structure. Address identification shall be maintained. Action required: This site has been assigned the address of 160 NW Oldham Pkwy. Please update your records and inform your client.
SEC - CPTED
Resolved
02/22/2023

Code of Ordinances Section 8.330. CPTED Review Requirement. All development applications shall be subject to CPTED review and recommendations. The application of CPTED concepts and strategies is site specific and the level of review shall be determined on a case by case basis. Some requests during development review will require mandatory compliance. Others will be strongly encouraged but compliance will be voluntary. Mandatory compliance elements will be addressed in Article 9 “Uses with Conditions”. Section 8.340. CPTED Uses Specified The following uses have been classified as “Uses with Conditions” per Article 9 of this Chapter, having been determined with a tendency toward an increased risk of crime,. Specific conditions for such uses are found in Article 9 and shall be required to be met prior to receiving any zoning approval, business license or approval to occupy any commercial space. 1. Bank/Financial Services 2. Bank Drive-Thru Facility 3. Check Cashing and Payday Loan Business 4. Convenience Store (C-Store) 5. Financial Services with Drive-up Window or Drive-Thru Facility 6. Pawn Shop 7. Title Loan Business, if performing on site cash transactions with $500 or more in cash on hand 8. Unattended self-serve gas pumps 9. Unsecured Loan Business 10. Other similar uses shall meet the same standards as the above Action required: Provide verification that minimum security requirements are met. This can be either on the plans or in report form.
Fire Plan Review Approved 03/01/2023 02/22/2023
Joe Frogge
Building Plan Review Rejected 02/03/2023 02/01/2023
Joe Frogge
Final Development Plan
Corrective Action Required
02/01/2023

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational.
Gen - Design professional seals
Corrective Action Required
02/01/2023

Missouri Board for Architects, Professional Engineers, Professional Land Surveyors and Professional Landscape Architects – Board Rules, Division 2030 – Chapter 3, 20 CSR 2030-3.060 Licensees Seal Documents must bear design professionals original seal with signature and date. (relevant portion paraphrased – reference original document for additional information) Action required: Structural drawings are to bear dated seal and signature from architect/engineer of record. (re: canopy and footings)
IBC 502.1 - Address Identification
Corrective Action Required
02/01/2023

2018 IBC 502.1 Address identification. New and existing buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be a minimum of 4 inches high with a minimum stroke width of ½ inch. Where required by the fire code official, address identification shall be provided in additional approved locations to facilitate emergency response. Where access is by means of a private road and the building address cannot be viewed from the public way, a monument, pole or other approved sign or means shall be used to identify the structure. Address identification shall be maintained. Action required: This site has been assigned the address of 160 NW Oldham Pkwy. Please update your records and inform your client.
SEC - CPTED
Corrective Action Required
02/06/2023

Code of Ordinances Section 8.330. CPTED Review Requirement. All development applications shall be subject to CPTED review and recommendations. The application of CPTED concepts and strategies is site specific and the level of review shall be determined on a case by case basis. Some requests during development review will require mandatory compliance. Others will be strongly encouraged but compliance will be voluntary. Mandatory compliance elements will be addressed in Article 9 “Uses with Conditions”. Section 8.340. CPTED Uses Specified The following uses have been classified as “Uses with Conditions” per Article 9 of this Chapter, having been determined with a tendency toward an increased risk of crime,. Specific conditions for such uses are found in Article 9 and shall be required to be met prior to receiving any zoning approval, business license or approval to occupy any commercial space. 1. Bank/Financial Services 2. Bank Drive-Thru Facility 3. Check Cashing and Payday Loan Business 4. Convenience Store (C-Store) 5. Financial Services with Drive-up Window or Drive-Thru Facility 6. Pawn Shop 7. Title Loan Business, if performing on site cash transactions with $500 or more in cash on hand 8. Unattended self-serve gas pumps 9. Unsecured Loan Business 10. Other similar uses shall meet the same standards as the above Action required: Provide verification that minimum security requirements are met. This can be either on the plans or in report form.
Licensed Contractors Rejected 02/01/2023
Joe Frogge
LC - General Contractor
Corrective Action Required
02/01/2023

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent.
LC - MEP Subs
Corrective Action Required
02/01/2023

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Approved 02/03/2023 01/30/2023
Ben Hicks
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Other $382.50 $382.50 Paid 05/05/2023
7232302-Commercial License Tax Fee $11,871.75 $11,871.75 Paid 05/05/2023
9110081-Paved Surface Inspection Fee $2,028.00 $2,028.00 Paid 05/05/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underground Electrical Inspection - Commercial Partial 6/29/2023 6/29/2023 06/29/2023
Misc
Informational
06/29/2023
Conduit from transformer to island for atm service
Underground Electrical Inspection - Commercial Passed 7/5/2023 7/5/2023 07/05/2023
Misc
Resolved
07/05/2023
Conduit from transformer to island for atm service
Footing Inspection - Commercial Failed 7/5/2023 07/05/2023
Misc
Corrective Action Required
07/05/2023
7/5/23 -Underground electrical scheduled and approved. Footing is not scheduled at this time, but is observed to be in failed condition. -Remove all loose soil and water from footing and provide min. 3" clearance to earth at all rebar
Site Visit Partial 7/11/2023 7/11/2023 07/11/2023
Misc
Informational
07/11/2023
7-11-23. Crew is on site, removed their section of parking lot and is currently working on ATM area which is for building inspections.
Footing Inspection - Commercial Passed 7/12/2023 (8:00) 7/12/2023 07/12/2023
Misc
Resolved
07/12/2023
7/5/23 -Underground electrical scheduled and approved. Footing is not scheduled at this time, but is observed to be in failed condition. -Remove all loose soil and water from footing and provide min. 3" clearance to earth at all rebar
Erosion Control Inspection Partial 7/12/2023 7/12/2023 07/12/2023
Misc
Informational
07/12/2023
7-12-23 DP. Contractor put dirt spoils in the parking lot by their pad. I had them surround the dirt piles in waddles and is currently in good working condition
Site Visit Partial 7/12/2023 7/12/2023 07/12/2023
Misc
Informational
07/11/2023
7-11-23 DP. Crew is on site, removed their section of parking lot and is currently working on ATM area which is for building inspections. 7-12-23 DP. No work for development.
Electrical Service Inspection Passed 7/21/2023 7/21/2023 07/21/2023
Erosion Control Inspection Passed 8/24/2023 8/24/2023 08/24/2023
Misc
Informational
07/12/2023
7-12-23 DP. Contractor put dirt spoils in the parking lot by their pad. I had them surround the dirt piles in waddles and is currently in good working condition
Pavement-Aggregate Base Passed 8/24/2023 8/24/2023 08/24/2023
Pavement-Curb Construction Passed 8/24/2023 8/24/2023 08/24/2023
Misc
Informational
08/24/2023
8-24-23 DP. Before pouring Curb they had aggregate compacted, they had apoxy coated steel for the bends of the curb and poured KCMMB 4k.
Pavement-Proof Roll Passed 8/24/2023 8/24/2023 08/24/2023
Misc
Informational
08/24/2023
8-24-23 DP. This area was not big enough for a proof roll. This spot was existing parking lot and the subgrade was still stable. They added AB3 and recompacted before pouring concrete.
Pavement-Stabilized Subgrade Passed 8/24/2023 8/24/2023 08/24/2023
Misc
Informational
08/24/2023
8-24-23 DP.The geogrid was still in place from existing parking lot.
Pavement-Surface Passed 8/24/2023 8/24/2023 08/24/2023
Misc
Informational
08/24/2023
8-24-23 DP. Crew poured KCMMB 4K concrete back in up to surface.
Site Visit Complete 8/24/2023 8/24/2023 08/24/2023
Misc
Informational
07/12/2023
7-11-23 DP. Crew is on site, removed their section of parking lot and is currently working on ATM area which is for building inspections. 7-12-23 DP. No work for development. 8-24-23 DP. This project is complete with everything that I need to see from the Field Engineering side.
Occupancy Inspection - Codes Commercial Full C of O 9/1/2023 9/1/2023 09/01/2023
Occupancy Inspection - Planning Passed 9/1/2023 9/1/2023 09/01/2023
Documents & Images
Date Uploaded File Type Document Name
12/09/2022 Plans COMMERCE BANK LEES SUMMIT Permit SET 12-8-22
01/26/2023 Application Form Commercial Permit Application (original)
01/26/2023 Plans COMMERCE BANK LEES SUMMIT PERMIT SET 1-25-23
01/30/2023 Letter Fire Building Plan Review
02/06/2023 Letter DS P/R Corrections Document
02/22/2023 Plans LEES SUMMIT ATM PLANS 2-22-23
02/22/2023 Letter DS P_R Corrections Document
03/02/2023 Approved Plans approved - LEES SUMMIT ATM PLANS 2-22-23
04/26/2023 Approved Plans Approved FDP 042623_LEES SUMMIT ATM PLANS 2-22-24
05/01/2023 Letter License Tax Bill
05/05/2023 Receipt Receipt for transaction:2023-002859
05/09/2023 Approved Plans approved - LEES SUMMIT ATM PLANS_
05/10/2023 Letter DS Building Permit
06/29/2023 Letter INSPECTION SUMMARY
07/05/2023 Letter INSPECTION SUMMARY
07/05/2023 Letter INSPECTION SUMMARY
07/11/2023 Letter INSPECTION SUMMARY
07/12/2023 Letter INSPECTION SUMMARY
07/12/2023 Letter INSPECTION SUMMARY
07/12/2023 Letter INSPECTION SUMMARY
07/21/2023 Letter INSPECTION SUMMARY
08/24/2023 Letter INSPECTION SUMMARY
08/24/2023 Letter INSPECTION SUMMARY
08/24/2023 Letter INSPECTION SUMMARY
08/24/2023 Letter INSPECTION SUMMARY
08/24/2023 Letter INSPECTION SUMMARY
08/24/2023 Letter INSPECTION SUMMARY
09/01/2023 Letter Codes Final Certificate of Occupancy
09/01/2023 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home