Summary
PRCOM20222629
Building Permit - Commercial
Certificate of Occupancy
MC PROPERTIES OF MO LLC
ADDITION COMMERCIAL
BUILDING ADDITION THAT INCLUDES A PICK UP WINDOW
06/13/2022
08/09/2022
01/30/2023
04/03/2023
Locations
Contacts
MC PROPERTIES OF MO LLC, Address:704 NE LAKE POINTE DR  
Wolf 21 Inc., Address:812A W 17th Street  
NATE DIEFENDORG, Phone:(913) 333-8882  
Tropic Air Heating and Cooling, LLC, Address:118 E Maple St  
WESTHUES ELECTRIC INC, Address:PO BOX 18220, Phone:(816) 356-5223  
COLLINS WEBB ARCHITECTURE LLC, Address:307 SW MARKET ST, Unit B, Phone:(816) 249-2270  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Plan Review Approved 07/05/2022 08/03/2022
Mike Weisenborn
Final Development Plan
Resolved
08/03/2022

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is for informational purposes.
Final Development Plan Review Approved 08/03/2022
Mike Weisenborn
Fire Plan Review Approved 07/05/2022 07/05/2022
Jim Eden
Licensed Contractors Rejected 07/05/2022 06/27/2022
Joe Frogge
LC - General Contractor
Resolved
08/09/2022

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent.
LC - MEP Subs
Resolved
08/09/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Addition to Commercial $315.00 $315.00 Paid 07/06/2022
7232302-Commercial License Tax Fee $3,750.00 $3,750.00 Paid 11/15/2022
9110071-Site Grading Fee $24.00 $24.00 Paid 08/03/2022
9110081-Paved Surface Inspection Fee $60.00 $60.00 Paid 08/03/2022
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 11/17/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Site Visit Partial 08/10/2022
Misc
Informational
08/10/2022
8-10-22 RH. Pre construction meeting on site today. Project plans to start next week once concrete contractor can be scheduled.
Site Visit Partial 08/26/2022
Misc
Informational
08/10/2022
8-10-22 RH. Pre construction meeting on site today. Project plans to start next week once concrete contractor can be scheduled. 8-26-22 RH. Project has started by cutting out Parking lot to subgrade.
Footing Inspection - Commercial Passed 8/30/2022 (8:00) 8/30/2022 08/30/2022
Site Visit Partial 08/31/2022
Misc
Informational
08/26/2022
8-10-22 RH. Pre construction meeting on site today. Project plans to start next week once concrete contractor can be scheduled. 8-26-22 RH. Project has started by cutting out Parking lot to subgrade. 8-31-22 RH. No work for development today.
Site Visit Partial 09/07/2022
Misc
Informational
08/31/2022
8-10-22 RH. Pre construction meeting on site today. Project plans to start next week once concrete contractor can be scheduled. 8-26-22 RH. Project has started by cutting out Parking lot to subgrade. 8-31-22 RH. No work for development today. 9-7-22. Contractor has poured building pad. No work on site for development since 8-31-22.
Erosion Control Inspection Residential Partial 09/07/2022
Misc
Informational
09/07/2022
9-7-22 RH. Erosion control is in place and working order.
Site Visit Partial 09/12/2022
Misc
Informational
09/07/2022
8-10-22 RH. Pre construction meeting on site today. Project plans to start next week once concrete contractor can be scheduled. 8-26-22 RH. Project has started by cutting out Parking lot to subgrade. 8-31-22 RH. No work for development today. 9-7-22. Contractor has poured building pad. No work on site for development since 8-31-22. 9-12-22 RH. Contractor continues to build building addition. No work for development since 9-7-22.
Erosion Control Inspection Residential Partial 09/12/2022
Misc
Informational
09/07/2022
9-7-22 RH. Erosion control is in place and working order. 9-12-22 RH. Erosion control is in place and working order.
Pavement-Aggregate Base Passed 09/21/2022
Misc
Informational
09/21/2022
9-14-22 RH. Aggregate was placed and compacted.
Pavement-Surface Passed 09/21/2022
Misc
Informational
09/21/2022
9-21-22 RH. Pavement was placed and looked good.
In-wall Inspection Failed 9/27/2022 9/27/2022 09/27/2022
Miscellaneous Correction
Corrective Action Required
09/27/2022
Nail exterior sheathing per plan 6" edges & 10" in field per plan pop Fire caulk l upward penetrations throughout Address bores within 2" Of the top & bottom of joist No plate overlap NE corner storage room Provide anchor bolts within 12" of plate break & end of plate
Pavement-Curb Construction Passed 09/29/2022
Misc
Informational
09/29/2022
9-29-22 RH. Curb was installed and passes inspection.
In-wall Inspection Passed 10/5/2022 10/05/2022
Miscellaneous Correction
Resolved
10/05/2022
Erosion Control Inspection Residential Passed 11/16/2022
Misc
Informational
09/12/2022
9-7-22 RH. Erosion control is in place and working order. 9-12-22 RH. Erosion control is in place and working order.
Occupancy Inspection - Engineering Passed 11/16/2022 11/16/2022
Misc
Informational
11/16/2022
11-16-22 RH. Passed.
Occupancy Inspection - Planning Failed 11/16/2022 11/16/2022
Corrective Action Required
11/16/2022
DRIVE-THROUGH QUEUING. The approved plan shows the ADA parking space off the southeast building corner being eliminated by striping it off in order to allow for a minimum 2-car stacking for the drive-through window. The space has yet to be eliminated, which will cause the ADA parking space to be blocked/inaccessible by the required 2-car stacking for the window.
Above Ceiling Inspection Passed 11/16/2022 11/16/2022
Occupancy Inspection - Codes Commercial Failed 11/16/2022 11/16/2022 11/16/2022
Miscellaneous Correction
Corrective Action Required
11/16/2022
PLANNING : FAIL DRIVE-THROUGH QUEUING. The approved plan shows the ADA parking space off the southeast building corner being eliminated by striping it off in order to allow for a minimum 2-car stacking for the drive-through window. The space has yet to be eliminated, which will cause the ADA parking space to be blocked/inaccessible by the required 2-car stacking for the window. CODES: PASSED FIRE: PASSED WATER : NOT REQUIRED FIELD ENGINEERING : PASSSED
Occupancy Inspection - Fire Passed 11/16/2022 11/16/2022 11/17/2022
Occupancy Inspection - Codes Commercial Ready for Temp CO 11/17/2022
Miscellaneous Correction
Corrective Action Required
11/16/2022
PLANNING : FAIL DRIVE-THROUGH QUEUING. The approved plan shows the ADA parking space off the southeast building corner being eliminated by striping it off in order to allow for a minimum 2-car stacking for the drive-through window. The space has yet to be eliminated, which will cause the ADA parking space to be blocked/inaccessible by the required 2-car stacking for the window. CODES: PASSED FIRE: PASSED WATER : NOT REQUIRED FIELD ENGINEERING : PASSSED
Miscellaneous Correction
Corrective Action Required
11/17/2022
A Temporary Occupancy can be issued for the interior space only. The pick-up window cannot be utilitized until approved by the State of Missouri and the parking spots indicated in the first comment have been striped off.
Occupancy Inspection - Planning Passed 04/03/2023
Occupancy Inspection - Codes Commercial Full C of O 04/03/2023
Miscellaneous Correction
Resolved
04/03/2023
PLANNING : FAIL DRIVE-THROUGH QUEUING. The approved plan shows the ADA parking space off the southeast building corner being eliminated by striping it off in order to allow for a minimum 2-car stacking for the drive-through window. The space has yet to be eliminated, which will cause the ADA parking space to be blocked/inaccessible by the required 2-car stacking for the window. CODES: PASSED FIRE: PASSED WATER : NOT REQUIRED FIELD ENGINEERING : PASSSED
Miscellaneous Correction
Resolved
04/03/2023
A Temporary Occupancy can be issued for the interior space only. The pick-up window cannot be utilitized until approved by the State of Missouri and the parking spots indicated in the first comment have been striped off.
Documents & Images
Date Uploaded File Type Document Name
06/13/2022 Application Form application
06/21/2022 Plans 01_22038_220610_3rd Street Dispensary_Addition_Permit Set
06/22/2022 Email LT info
07/06/2022 Receipt Receipt for transaction:2022-005540
08/03/2022 Receipt Receipt for transaction:2022-006365
08/04/2022 Approved Plans Approved 3rd Street Dispensary_Addition_Permit Set
08/09/2022 Letter License Tax Bill
08/09/2022 Letter DS Building Permit
08/10/2022 Letter INSPECTION SUMMARY
08/26/2022 Letter INSPECTION SUMMARY
08/30/2022 Letter INSPECTION SUMMARY
08/31/2022 Letter INSPECTION SUMMARY
09/07/2022 Letter INSPECTION SUMMARY
09/07/2022 Letter INSPECTION SUMMARY
09/12/2022 Letter INSPECTION SUMMARY
09/12/2022 Letter INSPECTION SUMMARY
09/21/2022 Letter INSPECTION SUMMARY
09/21/2022 Letter INSPECTION SUMMARY
09/27/2022 Letter INSPECTION SUMMARY
09/29/2022 Letter INSPECTION SUMMARY
10/05/2022 3rd Street Dispensary-Ceiling Joist Repair
10/05/2022 Letter INSPECTION SUMMARY
10/05/2022 Letter INSPECTION SUMMARY
11/15/2022 Receipt Receipt for transaction:2022-008954
11/16/2022 Letter INSPECTION SUMMARY
11/16/2022 Letter INSPECTION SUMMARY
11/16/2022 Letter INSPECTION SUMMARY
11/16/2022 Letter INSPECTION SUMMARY
11/17/2022 Certificate/License Codes Temporary Certificate of Occupancy
11/17/2022 Receipt Receipt for transaction:2022-009007
11/17/2022 Certificate/License Codes Temporary Certificate of Occupancy
11/17/2022 Email 3rd Street Dispensary
04/03/2023 Letter INSPECTION SUMMARY
04/03/2023 Letter Codes Final Certificate of Occupancy
04/03/2023 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home