Summary
PRCOM20221017
Building Permit - Commercial
Final Completion
BRAIN DEV 3 LLC
ALTERATION COMMERCIAL
FACADE REMODEL INCLUDING SOME ROOF WORK
03/18/2022
04/12/2022
09/26/2022
10/07/2022
Locations
Contacts
BCCM Construction Group, Inc., Address:100 E. 7th St. Suite 201, Phone:(816) 659-9115 Ext:210  
Rick Lynam, Address:rlynam@bccmconstruction.com, Phone:(816) 659-9115  
RAGSDALE ELECTRIC LLC, Address:PO Box 943, Phone:(816) 226-0551  
The Hive Design Collaborative, Address:1617 Walnut St, Phone:(816) 581-6363  
BRAIN DEV 3 LLC, Address:300 E 39TH ST  
Reviews
Review Type Outcome Est. Completion Date Completed
Zoning Review Approved 04/14/2022 04/07/2022
Hector Soto Jr.
Miscellaneous Correction
Informational
04/07/2022

SIGNAGE. Exterior Elevation Key Note #8 on Sheet A200 indicates that signage will be coordinated with current tenants, but that the intent is to salvage and re-use the signage. The existing center employs some lawful non-conforming raceway signs that do not comply with current sign standards. UDO Section 10.140.C states that lawful non-conforming signs may not be moved or replaced, except to bring the sign into complete conformance with the current sign code under UDO Article 9. During the pre-application meeting held on June 29, 2021, it was indicated by Mr. Cole that the center's signage program would be updated to reflect the center's new contemporary design improvements. Signage for the center will need to be brought into compliance with current standards, which does not include raceways. ***This previously made comment is being retained for documentation and informational purposes. No further action is required for this specific item at this particular time. New signage for the center will undergo the normal sign permit process under separate application.***
Licensed Contractors Approved 04/14/2022 04/07/2022
Joe Frogge
LC - General Contractor
Resolved
04/07/2022

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Provide an email address for the on-site contact which is where inspection reports will be sent.
Building Plan Review Approved 04/14/2022 04/07/2022
Joe Frogge
Fire Plan Review Approved with Conditions 04/14/2022 04/07/2022
Joe Frogge
Miscellaneous Correction
Corrective Action Required
04/07/2022

3311.2 Maintenance. Required means of egress and required accessible means of egress shall be maintained during construction and demolition, remodeling or alterations and additions to any building. Exception: Approved temporary means of egress and accessible means of egress systems and facilities. Action required; Egress with egress protection shall be provided during construction. Verified at inspection.
Miscellaneous Correction
Corrective Action Required
04/07/2022

505.1 Address identification. New and existing buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be not less than 4 inches (102 mm) high with a minimum stroke width of 1/2 inch (12.7 mm). Where required by the fire code official, address identification shall be provided in additional approved locations to facilitate emergency response. Where access is by means of a private road and the building cannot be viewed from the public way, a monument, pole or other sign or means shall be used to identify the structure. Address identification shall be maintained. Action required- Temporary address identification shall be provided during construction and replaced with permenat identification. Verified at inspection.
Building Plan Review Approved 03/30/2022 03/30/2022
Joe Frogge
Fire Plan Review Approved with Conditions 03/30/2022 03/30/2022
Jim Eden
Miscellaneous Correction
Corrective Action Required
03/30/2022

3311.2 Maintenance. Required means of egress and required accessible means of egress shall be maintained during construction and demolition, remodeling or alterations and additions to any building. Exception: Approved temporary means of egress and accessible means of egress systems and facilities. Action required; Egress with egress protection shall be provided during construction. Verified at inspection.
Miscellaneous Correction
Corrective Action Required
03/30/2022

505.1 Address identification. New and existing buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be not less than 4 inches (102 mm) high with a minimum stroke width of 1/2 inch (12.7 mm). Where required by the fire code official, address identification shall be provided in additional approved locations to facilitate emergency response. Where access is by means of a private road and the building cannot be viewed from the public way, a monument, pole or other sign or means shall be used to identify the structure. Address identification shall be maintained. Action required- Temporary address identification shall be provided during construction and replaced with permenat identification. Verified at inspection.
Zoning Review Rejected 03/30/2022 03/28/2022
Hector Soto Jr.
Misc
Resolved
04/07/2022

LIGHTING. - The proposed wall sconces shall comply with the accent lighting standards under the City's Unified Development Ordinance (UDO) Section 8.270. - Are any wall pack light fixtures proposed for the building? None appear to be called out on the elevations. If any wall packs are to be used, they shall comply with the standards under UDO Section 8.260.
Miscellaneous Correction
Informational
04/07/2022

SIGNAGE. Exterior Elevation Key Note #8 on Sheet A200 indicates that signage will be coordinated with current tenants, but that the intent is to salvage and re-use the signage. The existing center employs some lawful non-conforming raceway signs that do not comply with current sign standards. UDO Section 10.140.C states that lawful non-conforming signs may not be moved or replaced, except to bring the sign into complete conformance with the current sign code under UDO Article 9. During the pre-application meeting held on June 29, 2021, it was indicated by Mr. Cole that the center's signage program would be updated to reflect the center's new contemporary design improvements. Signage for the center will need to be brought into compliance with current standards, which does not include raceways.
Licensed Contractors Rejected 03/30/2022 03/23/2022
Joe Frogge
LC - General Contractor
Corrective Action Required
03/23/2022

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Provide an email address for the on-site contact which is where inspection reports will be sent.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Alteration to Commercial $3,130.20 $3,130.20 Paid 04/11/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Passed 10/07/2022
Rough Electrical Inspection - Commercial Passed 10/07/2022
Final Electrical Inspection - Commercial Passed 10/10/2022 10/10/2022 10/07/2022
Documents & Images
Date Uploaded File Type Document Name
03/18/2022 Application Form 220222 - Southside Retail Commercial Permit Application - Signed
03/18/2022 Plans 220224 - Southside Retail - For Permit
03/21/2022 Email fdp info
03/30/2022 Letter DS P/R Corrections Document
04/07/2022 Letter Southside City Comment Responses (HIVE)
04/07/2022 Email RE_ Southside City Comment Responses (HIVE)_pdf - PRCOM20221017
04/07/2022 Approved Plans approved - Southside Retail - For Permit
04/11/2022 Receipt Receipt for transaction:2022-001980
04/27/2022 Letter Fire Building Plan Review
04/27/2022 Letter DS Building Permit
08/30/2022 Letter Codes 140 Day Letter
08/30/2022 Letter Codes 140 Day Letter
10/07/2022 Letter INSPECTION SUMMARY
10/07/2022 Letter INSPECTION SUMMARY
10/07/2022 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home