Permit Application Status

PRCOM20220870


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20220870
Building Permit - Commercial
Certificate of Occupancy
CITY OF LEES SUMMIT
NEW COMMERCIAL
NEW BANK WITH REMOTE ATM **invite Police to final for CPTED inspection
03/09/2022
07/28/2022
12/06/2022
04/07/2023
Locations
Contacts
A L HUBER INC, Address:10770 EL MONTE, Phone:(913) 341-4880  
vjarrett@alhuber.com, Address:vjarrett@alhuber.com, Phone:(913) 208-7112  
CITY WIDE SHEET METAL, INC, Address:2820 G ROE LN, Phone:(913) 871-7464  
STACO ELECTRIC CONSTRUCTION COMPANY INC, Address:11030 HICKMAN MILLS DR, Phone:(816) 765-7112  
KANSAS CITY MECHANICAL INC, Address:6822 KANSAS AVE, Phone:(913) 334-1101  
EBI Consulting, Address:21 B Street, Phone:(707) 328-3731  
CITY OF LEES SUMMIT, Address:220 SE GREEN ST  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 07/27/2022 07/22/2022
Joe Frogge
LC - MEP Subs
Resolved
07/22/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 6/3/22 - acknowledged in letter
LC - General Contractor
Resolved
07/22/2022

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor and an email address for the on-site contact which is where inspection reports will be sent. 6/3/22 - acknowledged in letter
Building Plan Review Approved 07/27/2022 07/21/2022
Joe Frogge
SEC - CPTED
Resolved
07/21/2022

Code of Ordinances Section 8.330. CPTED Review Requirement. All development applications shall be subject to CPTED review and recommendations. The application of CPTED concepts and strategies is site specific and the level of review shall be determined on a case by case basis. Some requests during development review will require mandatory compliance. Others will be strongly encouraged but compliance will be voluntary. Mandatory compliance elements will be addressed in Article 9 “Uses with Conditions”. Section 8.340. CPTED Uses Specified The following uses have been classified as “Uses with Conditions” per Article 9 of this Chapter, having been determined with a tendency toward an increased risk of crime,. Specific conditions for such uses are found in Article 9 and shall be required to be met prior to receiving any zoning approval, business license or approval to occupy any commercial space. 1. Bank/Financial Services 2. Bank Drive-Thru Facility 3. Check Cashing and Payday Loan Business 4. Convenience Store (C-Store) 5. Financial Services with Drive-up Window or Drive-Thru Facility 6. Pawn Shop 7. Title Loan Business, if performing on site cash transactions with $500 or more in cash on hand 8. Unattended self-serve gas pumps 9. Unsecured Loan Business 10. Other similar uses shall meet the same standards as the above Action required: Submit drawings or detailed report/spec to demonstrate compliance. A separate review for CPTED requirements must be performed. Permit will not be issued until CPTED review is approved. 6/3/22 - Items A thru I must be addressed. Only part of Item C found. Also, nothing for site or ATM found in submittal.
Fire Plan Review Approved 07/27/2022 07/20/2022
Joe Frogge
Fire Plan Review Approved 06/08/2022 06/09/2022
Jim Eden
Construction documents for fire alarm systems
Resolved
06/09/2022

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. If provided, submit plans for revuiew and approval.
Misc
Resolved
06/09/2022

A Knox key box is NOT required. If provided it shall be equiped with a tamper alarm.
Building Plan Review Rejected 06/08/2022 06/03/2022
Joe Frogge
SEC - CPTED
Corrective Action Required
06/01/2022

Code of Ordinances Section 8.330. CPTED Review Requirement. All development applications shall be subject to CPTED review and recommendations. The application of CPTED concepts and strategies is site specific and the level of review shall be determined on a case by case basis. Some requests during development review will require mandatory compliance. Others will be strongly encouraged but compliance will be voluntary. Mandatory compliance elements will be addressed in Article 9 “Uses with Conditions”. Section 8.340. CPTED Uses Specified The following uses have been classified as “Uses with Conditions” per Article 9 of this Chapter, having been determined with a tendency toward an increased risk of crime,. Specific conditions for such uses are found in Article 9 and shall be required to be met prior to receiving any zoning approval, business license or approval to occupy any commercial space. 1. Bank/Financial Services 2. Bank Drive-Thru Facility 3. Check Cashing and Payday Loan Business 4. Convenience Store (C-Store) 5. Financial Services with Drive-up Window or Drive-Thru Facility 6. Pawn Shop 7. Title Loan Business, if performing on site cash transactions with $500 or more in cash on hand 8. Unattended self-serve gas pumps 9. Unsecured Loan Business 10. Other similar uses shall meet the same standards as the above Action required: Submit drawings or detailed report/spec to demonstrate compliance. A separate review for CPTED requirements must be performed. Permit will not be issued until CPTED review is approved. 6/3/22 - Items A thru I must be addressed. Only part of Item C found. Also, nothing for site or ATM found in submittal.
IMC 501.3.1 Location of exhaust outlets
Resolved
06/03/2022

2018 IMC 501.3.1 Location of exhaust outlets. The termination point of exhaust outlets and ducts discharging to the outdoors shall be located with the following minimum distances: (see code for items 1, 2, 4, & 5) 3. For all environmental air exhaust: 3 feet from property lines; 3 feet from operable openings into building for all occupancies other than Group U, and 10 feet from mechanical air intakes. Such exhaust shall not be considered hazardous or noxious. Action required: Modify design to maintain minimum 10' between exhaust terminations and any air intake.
IPC 305.4 Freezing - protection of potable water
Resolved
06/03/2022

Protection of Potable Water System 2018 IPC 305.4 Freezing. Water, soil, and waste pipes shall not be installed outside of a building, in attics or crawl spaces, concealed in outside walls, or in any other place subjected to freezing temperatures unless adequate provision is made to protect such pipes from freezing by insulation or heat or both. Exterior water supply system piping shall be installed not less than 6” below the frost line (42” below grade) and not less than 12 inches below grade. Action required: Modify Plumbing General Note #8 on sheet P-0 to comply.
NEC Article 250.50 Grounding electrode system
Resolved
06/03/2022

2017 NEC Article 250.50 Grounding Electrode System. All Grounding electrodes as described in 250.52(A)(1) through (A)(7) that are present at each building or structure served shall be bonded together to form the grounding electrodes system. Where none of these grounding electrodes exist, one or more of the grounding electrodes specified in 250.52(A)(4) through (A)(8) shall be installed and used. (see code section for exception) Action required: Modify Electrical Riser Diagram on sheet E-7 to comply. Concrete encased electrode is supposed to be in footing or foundation, not slab.
Licensed Contractors Rejected 06/08/2022 06/03/2022
Joe Frogge
LC - MEP Subs
Corrective Action Required
06/01/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 6/3/22 - acknowledged in letter
LC - General Contractor
Corrective Action Required
06/01/2022

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor and an email address for the on-site contact which is where inspection reports will be sent. 6/3/22 - acknowledged in letter
Final Development Plan Review Approved 03/23/2022 04/13/2022
Joe Frogge
Fire Plan Review Approved with Conditions 03/23/2022 03/22/2022
Jim Eden
Construction documents for fire alarm systems
Corrective Action Required
03/22/2022

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. If provided, submit plans for revuiew and approval.
Misc
Corrective Action Required
03/22/2022

A Knox key box is NOT required. If provided it shall be equiped with a tamper alarm.
Building Plan Review Rejected 03/23/2022 03/16/2022
Joe Frogge
Final Development Plan
Resolved
04/13/2022

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is for informational purposes.
SEC - CPTED
Corrective Action Required
03/16/2022

Code of Ordinances Section 8.330. CPTED Review Requirement. All development applications shall be subject to CPTED review and recommendations. The application of CPTED concepts and strategies is site specific and the level of review shall be determined on a case by case basis. Some requests during development review will require mandatory compliance. Others will be strongly encouraged but compliance will be voluntary. Mandatory compliance elements will be addressed in Article 9 “Uses with Conditions”. Section 8.340. CPTED Uses Specified The following uses have been classified as “Uses with Conditions” per Article 9 of this Chapter, having been determined with a tendency toward an increased risk of crime,. Specific conditions for such uses are found in Article 9 and shall be required to be met prior to receiving any zoning approval, business license or approval to occupy any commercial space. 1. Bank/Financial Services 2. Bank Drive-Thru Facility 3. Check Cashing and Payday Loan Business 4. Convenience Store (C-Store) 5. Financial Services with Drive-up Window or Drive-Thru Facility 6. Pawn Shop 7. Title Loan Business, if performing on site cash transactions with $500 or more in cash on hand 8. Unattended self-serve gas pumps 9. Unsecured Loan Business 10. Other similar uses shall meet the same standards as the above Action required: Submit drawings or detailed report/spec to demonstrate compliance. A separate review for CPTED requirements must be performed. Permit will not be issued until CPTED review is approved.
IMC 501.3.1 Location of exhaust outlets
Corrective Action Required
03/16/2022

2018 IMC 501.3.1 Location of exhaust outlets. The termination point of exhaust outlets and ducts discharging to the outdoors shall be located with the following minimum distances: (see code for items 1, 2, 4, & 5) 3. For all environmental air exhaust: 3 feet from property lines; 3 feet from operable openings into building for all occupancies other than Group U, and 10 feet from mechanical air intakes. Such exhaust shall not be considered hazardous or noxious. Action required: Modify design to maintain minimum 10' between exhaust terminations and any air intake.
IPC 305.4 Freezing - protection of potable water
Corrective Action Required
03/16/2022

Protection of Potable Water System 2018 IPC 305.4 Freezing. Water, soil, and waste pipes shall not be installed outside of a building, in attics or crawl spaces, concealed in outside walls, or in any other place subjected to freezing temperatures unless adequate provision is made to protect such pipes from freezing by insulation or heat or both. Exterior water supply system piping shall be installed not less than 6” below the frost line (42” below grade) and not less than 12 inches below grade. Action required: Modify Plumbing General Note #8 on sheet P-0 to comply.
NEC Article 250.50 Grounding electrode system
Corrective Action Required
03/16/2022

2017 NEC Article 250.50 Grounding Electrode System. All Grounding electrodes as described in 250.52(A)(1) through (A)(7) that are present at each building or structure served shall be bonded together to form the grounding electrodes system. Where none of these grounding electrodes exist, one or more of the grounding electrodes specified in 250.52(A)(4) through (A)(8) shall be installed and used. (see code section for exception) Action required: Modify Electrical Riser Diagram on sheet E-7 to comply. Concrete encased electrode is supposed to be in footing or foundation, not slab.
Licensed Contractors Rejected 03/23/2022 03/16/2022
Joe Frogge
LC - MEP Subs
Corrective Action Required
03/16/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
LC - General Contractor
Corrective Action Required
03/16/2022

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor and an email address for the on-site contact which is where inspection reports will be sent.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Commercial $5,600.00 $5,600.00 Paid 07/28/2022
8331507-Sewer Connection Fee $210.00 $210.00 Paid 07/28/2022
7232302-Commercial License Tax Fee $32,355.00 $32,355.00 Paid 03/01/2023
9110080-Not Ready Inspection Fee $75.00 $75.00 Paid 03/01/2023
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 03/09/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Passed 9/9/2022 (10:00) 9/9/2022 09/09/2022
Misc
Informational
09/09/2022
FOOTING APPROVED, UFER LOCATED MIDDLE OF WEST (REAR) FOOTING
Underslab Plumbing Inspection - Commercial Failed 9/16/2022 9/16/2022 09/16/2022
Miscellaneous Correction
Corrective Action Required
09/16/2022
PROVIDE GUAGE & PRESSURE ON UNDERSLAB PLUMBING
Underslab Plumbing Inspection - Commercial Passed 9/19/2022 9/19/2022 09/19/2022
Miscellaneous Correction
Corrective Action Required
09/16/2022
- STORM LINE PRESSURE STEADY AT 8 PSI UNDERSLAB PLUMBING STEADY AT 10 PSI
Underslab Electrical Inspection - Commercial Passed 9/22/2022 9/22/2022 09/22/2022
Misc
Informational
09/22/2022
FLOOR BOXES SOUTH & EAST, DATA ROOM
Water Service Inspection Partial 10/11/2022
Misc
Informational
10/11/2022
Spoke with Joe from WU, they had been called out to look at the water meter for this location. The meter setter had been pulled down and the copper extending out had been flattened/crimped. After looking at the pit and area around it was determined that the copper had been pulled/bent during footing installations. Spoke with GC and plumber onsite to figure out a a work around. They will be digging the pit out, turning the meter/setter and running it parallel between building at curb to their tie in point ~8-10' to the south of pit. They will reset the meter and run new copper out to their tie in point. Spoke with Joe and Eric at Meter services and explained and got approval for this setup. 10/10/22 ES
Water Service Inspection Partial 10/14/2022
Misc
Informational
10/11/2022
Spoke with Joe from WU, they had been called out to look at the water meter for this location. The meter setter had been pulled down and the copper extending out had been flattened/crimped. After looking at the pit and area around it was determined that the copper had been pulled/bent during footing installations. Spoke with GC and plumber onsite to figure out a a work around. They will be digging the pit out, turning the meter/setter and running it parallel between building at curb to their tie in point ~8-10' to the south of pit. They will reset the meter and run new copper out to their tie in point. Spoke with Joe and Eric at Meter services and explained and got approval for this setup. 10/10/22 ES Spoke with Joe from WU on 10/13/22 they dropped off new yolk bar parts for the meter to be reinstalled and set properly. They were not on site working on this on 10/14/22 ES
Site Visit Partial 10/20/2022
Misc
Informational
10/20/2022
Only building work being performed. 10/20/22 ES
Rough Framing Inspection - Commercial Partial 11/3/2022 11/3/2022 11/03/2022
Misc
Informational
11/03/2022
ROOF & EXTERIOR WALL SHEATHING TYPE 1 & 2 NAILING PATTERN APPROVED OK TO COVER
In-wall Inspection Failed 11/22/2022 11/22/2022 11/22/2022
Misc
Corrective Action Required
11/22/2022
COMPLETE MEP FOR IN WALL INSPECTION
Sidewalk Inspection Partial 11/30/2022
Misc
Informational
11/30/2022
11-30-22 AN crew is working on gettting site ready for sidewalks
In-wall Inspection Failed 12/8/2022 12/8/2022 12/08/2022
Misc
Corrective Action Required
11/22/2022
-Secure mc at print access, teller, bathroom -Protect dwv within 1.25" of face of framing -Anchor bolts at conference and bath
In-wall Inspection Partial 12/9/2022 12/9/2022 12/09/2022
Misc
Corrective Action Required
12/08/2022
-Protect dwv within 1.25" of face of framing -Anchor bolts at conference and bath
In-wall Inspection Not Ready 12/12/2022 12/12/2022 12/12/2022
Misc
Corrective Action Required
12/09/2022
-Anchor bolts at conference, doorway, and bath
In-wall Inspection Passed 12/13/2022 12/13/2022 12/13/2022
Misc
Resolved
12/13/2022
-Anchor bolts at conference, doorway, and bath
Above Ceiling Inspection Partial 12/22/2022 12/22/2022 12/22/2022
Misc
Corrective Action Required
12/22/2022
ABOVE-CEILING OK BELOW: -HARD-LID CEILING&SOFFITS
Sidewalk Inspection Partial 12/29/2022
Misc
Informational
11/30/2022
11-30-22 AN crew is working on getting site ready for sidewalks 12-29-22 DP crew is installing forms and compacting aggregate
Site Visit Partial 01/04/2023
Misc
Informational
10/20/2022
Only building work being performed. 10/20/22 ES 1-4-23 DP. Crew is forming up curbs and pad for ATM
Electrical Service Inspection Failed 1/18/2023 1/18/2023 01/18/2023
Misc
Corrective Action Required
01/18/2023
-Provide 1/0 cu conductor to water and bonding jumper -Provide address at meter can
Electrical Service Inspection Passed 1/19/2023 1/19/2023 01/19/2023
Misc
Resolved
01/19/2023
-Provide 1/0 cu conductor to water and bonding jumper -Provide address at meter can
Site Visit Partial 1/26/2023 01/26/2023
Misc
Informational
01/04/2023
Only building work being performed. 10/20/22 ES 1-4-23 DP. Crew is forming up curbs and pad for ATM
Misc
Informational
01/26/2023
Checking to see if the names go over to Devin Perry.
Gas Service Inspection - Commercial Passed 1/30/2023 1/30/2023 01/30/2023
Above Ceiling Inspection Partial 2/6/2023 2/6/2023 02/06/2023
Misc
Resolved
02/06/2023
ABOVE-CEILING OK BELOW: -HARD-LID CEILING&SOFFITS
Above Ceiling Inspection Passed 02/06/2023
Occupancy Inspection - Planning Temporary C of O 3/8/2023 3/8/2023 03/08/2023
Corrective Action Required
03/08/2023
ADA SIGNS. ADA signs shall be posted at the head of the two accessible parking spaces on the east side of the building. The signs shall be mounted a minimum 5' above finished grade, measured to the bottom of the sign.
Corrective Action Required
03/08/2023
RTU SCREENING. The RTUs are located at the far west end of the roof and are fully visible. City ordinance requires that all RTUs be fully hidden from view on all sides. In order to comply with City ordinance, a screening system shall be installed onto the units in order satisfy the requirement that they not be viewable. The screen system shall be of a compatible color to the exterior building materials.
Erosion Control Inspection Residential Passed 03/08/2023
Occupancy Inspection - Codes Commercial Ready for Temp CO 3/8/2023 3/8/2023 03/08/2023
Misc
Corrective Action Required
03/08/2023
- check plans for Ada compliant mirrors. - complete Planning items. - complete Felid engineering items. All departments approved for TCO.
Occupancy Inspection - Fire Passed 3/8/2023 03/08/2023
Sidewalk Inspection Passed 3/8/2023 3/8/2023 03/08/2023
Misc
Informational
12/29/2022
11-30-22 AN crew is working on getting site ready for sidewalks 12-29-22 DP crew is installing forms and compacting aggregate 3-8-23 DP. Sidewalk is poured, cross slopes and ADA ramps are in compliance.
Water Service Inspection Passed 3/8/2023 3/8/2023 03/08/2023
Misc
Informational
10/14/2022
Spoke with Joe from WU, they had been called out to look at the water meter for this location. The meter setter had been pulled down and the copper extending out had been flattened/crimped. After looking at the pit and area around it was determined that the copper had been pulled/bent during footing installations. Spoke with GC and plumber onsite to figure out a a work around. They will be digging the pit out, turning the meter/setter and running it parallel between building at curb to their tie in point ~8-10' to the south of pit. They will reset the meter and run new copper out to their tie in point. Spoke with Joe and Eric at Meter services and explained and got approval for this setup. 10/10/22 ES Spoke with Joe from WU on 10/13/22 they dropped off new yolk bar parts for the meter to be reinstalled and set properly. They were not on site working on this on 10/14/22 ES 3-8-23 DP. This was installed correctly referencing Erics notes.
Occupancy Inspection - Engineering Temporary C of O 3/8/2023 3/8/2023 03/08/2023
Misc
Informational
03/08/2023
3-8-23 DP. Most everything looks good. Issuing TCO Punch list items-- 1.Clean site up 2.remove job trailer, storage containers 3.Paint top of private fire hydrant silver
Occupancy Inspection - Water Utilities Failed 03/09/2023
Corrective Action Required
03/07/2023
Backflow inspection determined correction needed. Advised contractor, Boe Thompson of the necessary corrections. Corrective action taken. Passes inspection.
Occupancy Inspection - Water Utilities Passed 03/09/2023
Occupancy Inspection - Planning Passed 04/05/2023
Rough Framing Inspection - Commercial Passed 04/07/2023
Misc
Resolved
04/07/2023
ROOF & EXTERIOR WALL SHEATHING TYPE 1 & 2 NAILING PATTERN APPROVED OK TO COVER
Occupancy Inspection - Codes Commercial Full C of O 4/7/2023 4/7/2023 04/07/2023
Misc
Resolved
04/07/2023
- check plans for Ada compliant mirrors. - complete Planning items. - complete Felid engineering items. All departments approved for TCO.
Occupancy Inspection - Engineering Passed 4/7/2023 4/7/2023 04/07/2023
Misc
Informational
03/08/2023
3-8-23 DP. Most everything looks good. Issuing TCO Punch list items-- Clean site up, remove job trailer, storage containers 4-7-23 DP. Punch list items have been taken care of. Final passed.
Documents & Images
Date Uploaded File Type Document Name
03/09/2022 Application Form Commercial Permit Application_Pryor & Lowenstein
03/14/2022 Plans Pryor_COMB (old - do not use)
03/14/2022 Specifications Pryor & Lowenstein Project Manual
03/14/2022 Engineer Report/Study 2021-12-06 Geo Engineering Report C21G1105
03/14/2022 Engineer Report/Study Calcs_S
03/14/2022 Application Form Commercial Permit Application_Pryor & Lowenstein
03/23/2022 Letter DS P/R Corrections Document
05/02/2022 Plans 220376 CBRE-JPMC Pryor Foundation Permit Set
05/02/2022 Plans Pryor_C
05/02/2022 Letter Lee's Summit Foundation Permit Letter
06/01/2022 Plans COMB_Pryor Rev 1 Set 05312022-Stamped
06/01/2022 Letter Lee's Summit Response Letter 06012022
06/09/2022 Letter DS P/R Corrections Document
07/20/2022 Drawing Pryor Rd & Lowenstein A0_1
07/20/2022 Drawing Pryor Rd & Lowenstein A0_2_2
07/20/2022 Drawing Pryor Rd & Lowenstein A1_1_3
07/20/2022 Letter Review Response Letter 07142022
07/21/2022 Approved Plans approved - COMB_Pryor Rev 1 Set 05312022-Stamped
07/28/2022 Receipt Receipt for transaction:2022-006201
07/28/2022 Letter License Tax Bill
07/28/2022 Letter DS Building Permit
09/09/2022 Letter INSPECTION SUMMARY
09/19/2022 Letter INSPECTION SUMMARY
09/22/2022 Letter INSPECTION SUMMARY
10/11/2022 Letter INSPECTION SUMMARY
10/11/2022 Letter INSPECTION SUMMARY
10/14/2022 Letter INSPECTION SUMMARY
10/20/2022 Letter INSPECTION SUMMARY
11/03/2022 Letter INSPECTION SUMMARY
11/30/2022 Letter INSPECTION SUMMARY
12/08/2022 Letter INSPECTION SUMMARY
12/08/2022 Letter INSPECTION SUMMARY
12/09/2022 Letter INSPECTION SUMMARY
12/12/2022 Letter INSPECTION SUMMARY
12/13/2022 Letter INSPECTION SUMMARY
12/22/2022 Letter INSPECTION SUMMARY
12/22/2022 Letter Chase Bank (Pryor) - Electrical Revision Letter
12/29/2022 Letter INSPECTION SUMMARY
01/04/2023 Letter INSPECTION SUMMARY
01/05/2023 Drawing approved - E-7
01/18/2023 Letter INSPECTION SUMMARY
01/19/2023 Letter INSPECTION SUMMARY
01/26/2023 Letter INSPECTION SUMMARY
01/30/2023 Letter INSPECTION SUMMARY
01/30/2023 Letter INSPECTION SUMMARY
02/06/2023 Letter INSPECTION SUMMARY
02/06/2023 Letter INSPECTION SUMMARY
03/01/2023 Receipt Receipt for transaction:2023-001157
03/01/2023 Receipt Receipt for transaction:2023-001159
03/08/2023 Letter INSPECTION SUMMARY
03/08/2023 Letter INSPECTION SUMMARY
03/08/2023 Letter INSPECTION SUMMARY
03/08/2023 Letter INSPECTION SUMMARY
03/09/2023 Certificate/License Codes Temporary Certificate of Occupancy
03/09/2023 Receipt Receipt for transaction:2023-001326
03/09/2023 Letter INSPECTION SUMMARY
04/07/2023 Letter INSPECTION SUMMARY
04/07/2023 Letter INSPECTION SUMMARY
04/07/2023 Letter INSPECTION SUMMARY
04/07/2023 Letter Codes Final Certificate of Occupancy
04/07/2023 Letter Field Certificate of Occupancy
04/07/2023 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home