Permit Application Status

PRCOM20215818


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20215818
Building Permit - Commercial
Certificate of Occupancy
LS INVESTORS ONE LLC
CHANGE OF TENANT
CHANGE OF TENANT FOR NEW RETAIL
11/05/2021
11/22/2021
05/07/2022
12/04/2022
Locations
Contacts
MEYER BROTHERS BUILDING COMPANY, Address:800 E 101ST TER STE 120, Phone:(816) 246-4800  
scottg@meyerbro.com  
David Eskov Architecture, Address:21466 W 120th St, Phone:(913) 284-3660  
BART'S ELECTRIC COMPANY INC, Address:7103 STEWART RD, Phone:(816) 421-0007  
ALLIANCE MECHANICAL CONTRACTORS, Address:305 W CEDAR , Phone:(913) 553-2600  
LS INVESTORS ONE LLC, Address:1220 WASHINGTON ST PO BOX 411299  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 11/22/2021 11/18/2021
Development Center
LC - General Contractor
Corrective Action Required
11/15/2021

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor and an email address for the on-site contact. 11/16/21 - acknowledged in letter
LC - MEP Subs
Corrective Action Required
11/15/2021

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 11/16/21 - acknowledged in letter
Fire Plan Review Approved with Conditions 11/22/2021 11/17/2021
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
11/15/2021

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Any modifications to the fire alarm system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Construction documents - Fire protection systems
Corrective Action Required
11/15/2021

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Any modifications to the fire sprinkler system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Installation acceptance testing
Corrective Action Required
11/15/2021

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Building Plan Review Rejected 11/22/2021 11/16/2021
Joe Frogge
Misc
Corrective Action Required
11/15/2021

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes. 11/16/21 - acknowledged in letter
Miscellaneous Correction
Resolved
11/16/2021

Inadequate information to complete review. Action required: Provide complete MEP designs or detailed scopes of work that describes all methods and materials.
Building Plan Review Rejected 11/17/2021 11/08/2021
Joe Frogge
Misc
Corrective Action Required
11/08/2021

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
Miscellaneous Correction
Corrective Action Required
11/08/2021

Inadequate information to complete review. Action required: Provide complete MEP designs or detailed scopes of work that describes all methods and materials.
Licensed Contractors Rejected 11/17/2021 11/08/2021
Joe Frogge
LC - General Contractor
Corrective Action Required
11/08/2021

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor and an email address for the on-site contact. 11/16/21 - acknowledged in letter
LC - MEP Subs
Corrective Action Required
11/08/2021

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 11/16/21 - acknowledged in letter
Fire Plan Review Approved with Conditions 11/17/2021 11/08/2021
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
11/08/2021

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Any modifications to the fire alarm system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Construction documents - Fire protection systems
Corrective Action Required
11/08/2021

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Any modifications to the fire sprinkler system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Installation acceptance testing
Corrective Action Required
11/08/2021

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Change of Tenant $220.00 $220.00 Paid 11/18/2021
$7,245.00
8331507-Sewer Connection Fee $30.00 $30.00 Paid 11/18/2021
7232302-Commercial Excise Tax Fee $3,622.50 $3,622.50 Paid 11/05/2021
$3,622.50
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Passed 12/3/2021 12/3/2021 12/03/2021
Underslab Electrical Inspection - Commercial Passed 12/3/2021 12/3/2021 12/03/2021
In-wall Inspection Passed 12/3/2021 12/3/2021 12/03/2021
Corrective Action Required
01/20/2022
Address back door. Fire extinguisher needs annual inspection. Front exit sign is nonoperational. Fire sprinkler system needs annual service/inspection.
Above Ceiling Inspection Passed 12/16/2021 12/16/2021 12/16/2021
Occupancy Inspection - Codes Commercial Failed 1/20/2022 1/20/2022 01/20/2022
Miscellaneous Correction
Corrective Action Required
01/20/2022
SEATS OF WATER CLOSETS PROVIDED FOR PUBLIC OR EMPLOYEE TOILET FACILITIES SHALL BE OF THE HINGED OPEN FRONT TYPE ( 2018 IPC 425.3 ) PROVIDE GFCI PROTECTION RECEPTACLES AT MOP SINK
Occupancy Inspection - Fire Failed 1/20/2022 1/20/2022 01/20/2022
Corrective Action Required
01/20/2022
Address back door. Fire extinguisher needs annual inspection. Front exit sign is nonoperational. Fire sprinkler system needs annual service/inspection.
Occupancy Inspection - Codes Commercial Full C of O 1/24/2022 1/24/2022 01/24/2022
Miscellaneous Correction
Resolved
01/24/2022
Documents & Images
Date Uploaded File Type Document Name
11/05/2021 Application Form Permit App
11/05/2021 Drawing A1_0
11/05/2021 A1_1
11/05/2021 A4_0
11/08/2021 Letter Fire Building Plan Review
11/08/2021 Letter DS P/R Corrections Document
11/15/2021 Letter City Response Letter
11/15/2021 Plans Combined Rev 1 Set
11/17/2021 Letter Fire Building Plan Review
11/18/2021 Approved Plans approved plans - Combined Rev 1 Set
11/18/2021 City of Lee's Summit Business License - Expires 06_30_2022
11/18/2021 Receipt Receipt for transaction: 2021-008834
11/18/2021 Letter DS Building Permit
12/03/2021 Letter INSPECTION SUMMARY
12/03/2021 Letter INSPECTION SUMMARY
12/03/2021 Letter INSPECTION SUMMARY
12/13/2021 Letter DS Building Permit
12/16/2021 Letter INSPECTION SUMMARY
01/20/2022 Letter INSPECTION SUMMARY
01/20/2022 Letter INSPECTION SUMMARY
01/20/2022 Letter Fire Loss Reduction Form
01/24/2022 Letter Field Certificate of Occupancy
01/24/2022 Letter Codes Final Certificate of Occupancy
01/24/2022 Letter License Tax Bill
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home