Review Type |
Outcome |
Est. Completion Date |
Completed |
Licensed Contractors
|
Approved
|
12/03/2021
|
12/20/2021
|
|
Joe Frogge
|
|
LC - MEP Subs
Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt)
No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section.
Action required: MEP subcontractors are required to be listed on permit.
- Provide company names of licensed MEP contractors.
-
12/29/21 - Electric One not licensed with us and Wilson does not have appropriate license to perform mechanical work.
|
|
|
Sprinkler Plan Review
|
Released for Construction
|
12/14/2021
|
12/14/2021
|
|
Michael Weissenbach
|
|
|
Alarm Plan Review
|
Released for Construction
|
12/14/2021
|
12/14/2021
|
|
Michael Weissenbach
|
|
Installation acceptance testing
Corrective Action Required
2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
(Informational Purposes)
Call (816)969-1300 to schedule a test.
|
|
|
Building Plan Review
|
Approved with Conditions
|
12/03/2021
|
11/29/2021
|
|
Joe Frogge
|
|
Miscellaneous Correction
Inadequate information to complete review.
Provide the following:
- Complete wall construction details. (fyi - type II construction - must be non-combustible)
- Detailed scopes of work for electrical and mechanical.
- Emergency and egress lighting design.
- Complete door and door hardware specs.
- Identify use of new space.
|
|
Miscellaneous Correction
Comment for informational purposes.
- Existing door into atrium may be rated but the wall is not. i.e. the window need not be rated.
|
|
ICC A117.1 404.2.3.2 Swinging Doors Maneuvering Clearance
Corrective Action Required
ICC A117.1 Section 404.2.3.2 Swinging Doors and gates. Swinging doors and gates shall have maneuvering clearances complying with Table 404.2.3.2.
Actions required:
- Provide dimensions to verify minimum clearance at door out of new space into atrium. (Minimum 12" required at latch side of door if closer and latch are)
- Provide dimensions to verify minimum 18" between latch side of door between Open Office 1.184 and new space.
12/29/21 - details provided. field verify.
|
|
|
Fire Plan Review
|
Approved with Conditions
|
12/03/2021
|
11/24/2021
|
|
Michael Weissenbach
|
|
Construction documents for fire alarm systems
Corrective Action Required
2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
(Informational Purposes)
Any modifications to the fire alarm system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
|
|
Construction documents - Fire protection systems
Corrective Action Required
2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
(Informational Purposes)
Any modifications to the fire sprinkler system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
|
|
Installation acceptance testing
Corrective Action Required
2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
(Informational Purposes)
Call (816)969-1300 to schedule testing.
|
|
Illumination required
2018 IFC 1008.1 Illumination required. The means of egress, shall be illuminated at all times the building space served by the means of egress is occupied.
(Action Required)
Show exit and emergency lighting locations.
|
|
|
Building Plan Review
|
Rejected
|
11/11/2021
|
11/02/2021
|
|
Joe Frogge
|
|
Miscellaneous Correction
Corrective Action Required
Inadequate information to complete review.
Provide the following:
- Complete wall construction details. (fyi - type II construction - must be non-combustible)
- Detailed scopes of work for electrical and mechanical.
- Emergency and egress lighting design.
- Complete door and door hardware specs.
- Identify use of new space.
|
|
Miscellaneous Correction
Corrective Action Required
Comment for informational purposes.
- Existing door into atrium may be rated but the wall is not. i.e. the window need not be rated.
|
|
ICC A117.1 404.2.3.2 Swinging Doors Maneuvering Clearance
Corrective Action Required
ICC A117.1 Section 404.2.3.2 Swinging Doors and gates. Swinging doors and gates shall have maneuvering clearances complying with Table 404.2.3.2.
Actions required:
- Provide dimensions to verify minimum clearance at door out of new space into atrium. (Minimum 12" required at latch side of door if closer and latch are)
- Provide dimensions to verify minimum 18" between latch side of door between Open Office 1.184 and new space.
|
|
|
Licensed Contractors
|
Rejected
|
11/11/2021
|
11/02/2021
|
|
Joe Frogge
|
|
LC - MEP Subs
Corrective Action Required
Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt)
No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section.
Action required: MEP subcontractors are required to be listed on permit.
- Provide company names of licensed MEP contractors.
- Provide an email address for the on-site contact. (this is where inspection reports will be sent to - typically the GC superintendent)
|
|
|
Fire Plan Review
|
Rejected
|
11/11/2021
|
11/02/2021
|
|
Michael Weissenbach
|
|
Construction documents for fire alarm systems
Corrective Action Required
2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
(Informational Purposes)
Any modifications to the fire alarm system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
|
|
Construction documents - Fire protection systems
Corrective Action Required
2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
(Informational Purposes)
Any modifications to the fire sprinkler system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
|
|
Installation acceptance testing
Corrective Action Required
2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
(Informational Purposes)
Call (816)969-1300 to schedule testing.
|
|
Illumination required
Corrective Action Required
2018 IFC 1008.1 Illumination required. The means of egress, shall be illuminated at all times the building space served by the means of egress is occupied.
(Action Required)
Show exit and emergency lighting locations.
|
|
|