Permit Application Status

PRCOM20215687


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20215687
Building Permit - Commercial
Closed
CITY OF LEES SUMMIT
ALTERATION COMMERCIAL
INTERIOR ALTERATIONS TO MODIFY CONFERENCE ROOM FOR PUBLIC ACCESS
11/01/2021
01/04/2022
05/01/2022
09/23/2022
Locations
Contacts
THE WILSON GROUP, Address:13510 OAK ST, Phone:(816) 537-0212  
s.briedwell@thewilsongroup.inc, Address:s.briedwell@thewilsongroup.inc  
THE WILSON GROUP, Address:13510 OAK ST, Phone:(816) 537-0212  
ELECTRIC ONE LLC, Address:7312 N ANTIOCH RD, Phone:(816) 437-9312  
CITY OF LEES SUMMIT, Address:PO BOX 1600  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 12/03/2021 12/20/2021
Joe Frogge
LC - MEP Subs
Resolved
12/20/2021

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. - Provide company names of licensed MEP contractors. - 12/29/21 - Electric One not licensed with us and Wilson does not have appropriate license to perform mechanical work.
Sprinkler Plan Review Released for Construction 12/14/2021 12/14/2021
Michael Weissenbach
Alarm Plan Review Released for Construction 12/14/2021 12/14/2021
Michael Weissenbach
Installation acceptance testing
Corrective Action Required
12/14/2021

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule a test.
Building Plan Review Approved with Conditions 12/03/2021 11/29/2021
Joe Frogge
Miscellaneous Correction
Resolved
11/29/2021

Inadequate information to complete review. Provide the following: - Complete wall construction details. (fyi - type II construction - must be non-combustible) - Detailed scopes of work for electrical and mechanical. - Emergency and egress lighting design. - Complete door and door hardware specs. - Identify use of new space.
Miscellaneous Correction
Resolved
11/29/2021

Comment for informational purposes. - Existing door into atrium may be rated but the wall is not. i.e. the window need not be rated.
ICC A117.1 404.2.3.2 Swinging Doors Maneuvering Clearance
Corrective Action Required
11/24/2021

ICC A117.1 Section 404.2.3.2 Swinging Doors and gates. Swinging doors and gates shall have maneuvering clearances complying with Table 404.2.3.2. Actions required: - Provide dimensions to verify minimum clearance at door out of new space into atrium. (Minimum 12" required at latch side of door if closer and latch are) - Provide dimensions to verify minimum 18" between latch side of door between Open Office 1.184 and new space. 12/29/21 - details provided. field verify.
Fire Plan Review Approved with Conditions 12/03/2021 11/24/2021
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
11/24/2021

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Informational Purposes) Any modifications to the fire alarm system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Construction documents - Fire protection systems
Corrective Action Required
11/24/2021

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Informational Purposes) Any modifications to the fire sprinkler system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Installation acceptance testing
Corrective Action Required
11/24/2021

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Illumination required
Resolved
11/24/2021

2018 IFC 1008.1 Illumination required. The means of egress, shall be illuminated at all times the building space served by the means of egress is occupied. (Action Required) Show exit and emergency lighting locations.
Building Plan Review Rejected 11/11/2021 11/02/2021
Joe Frogge
Miscellaneous Correction
Corrective Action Required
11/02/2021

Inadequate information to complete review. Provide the following: - Complete wall construction details. (fyi - type II construction - must be non-combustible) - Detailed scopes of work for electrical and mechanical. - Emergency and egress lighting design. - Complete door and door hardware specs. - Identify use of new space.
Miscellaneous Correction
Corrective Action Required
11/02/2021

Comment for informational purposes. - Existing door into atrium may be rated but the wall is not. i.e. the window need not be rated.
ICC A117.1 404.2.3.2 Swinging Doors Maneuvering Clearance
Corrective Action Required
11/02/2021

ICC A117.1 Section 404.2.3.2 Swinging Doors and gates. Swinging doors and gates shall have maneuvering clearances complying with Table 404.2.3.2. Actions required: - Provide dimensions to verify minimum clearance at door out of new space into atrium. (Minimum 12" required at latch side of door if closer and latch are) - Provide dimensions to verify minimum 18" between latch side of door between Open Office 1.184 and new space.
Licensed Contractors Rejected 11/11/2021 11/02/2021
Joe Frogge
LC - MEP Subs
Corrective Action Required
11/02/2021

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. - Provide company names of licensed MEP contractors. - Provide an email address for the on-site contact. (this is where inspection reports will be sent to - typically the GC superintendent)
Fire Plan Review Rejected 11/11/2021 11/02/2021
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
11/02/2021

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Informational Purposes) Any modifications to the fire alarm system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Construction documents - Fire protection systems
Corrective Action Required
11/02/2021

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Informational Purposes) Any modifications to the fire sprinkler system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Installation acceptance testing
Corrective Action Required
11/02/2021

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Illumination required
Corrective Action Required
11/02/2021

2018 IFC 1008.1 Illumination required. The means of egress, shall be illuminated at all times the building space served by the means of egress is occupied. (Action Required) Show exit and emergency lighting locations.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Alteration to Commercial $185.86 $185.86 Paid 12/20/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Passed 2/1/2022 2/1/2022 02/01/2022
Above Ceiling Inspection Failed 2/24/2022 2/24/2022 02/24/2022
Misc
Corrective Action Required
02/24/2022
-Mc cable and 2 4x4 junction boxes over the south wall need to be secured. -Secure Mc cable within 12" of a box, center of the room. - light and MC supported by electrical wire. Provide approved support wire listed for use to support MC and lighting fixture. - NOTE: 2 exit signs need to be removed. one on the south door in office area and the other outside the west door in hall area. contact Mark 969-1216 if you have questions.
Above Ceiling Inspection Passed 2/28/2022 2/28/2022 02/28/2022
Misc
Resolved
02/28/2022
-Mc cable and 2 4x4 junction boxes over the south wall need to be secured. -Secure Mc cable within 12" of a box, center of the room. - light and MC supported by electrical wire. Provide approved support wire listed for use to support MC and lighting fixture. - NOTE: 2 exit signs need to be removed. one on the south door in office area and the other outside the west door in hall area. contact Mark 969-1216 if you have questions.
Alarm Test Passed 3/1/2022 03/01/2022
Documents & Images
Date Uploaded File Type Document Name
11/01/2021 Application Form city hall permit
11/01/2021 Drawing City Hall Conf room
11/02/2021 Letter Fire Building Plan Review
11/02/2021 Letter DS P/R Corrections Document
11/24/2021 Drawing City Hall Conf room permit REQs
11/24/2021 Specifications door submittal package
11/24/2021 Letter Elec scope
11/24/2021 Letter Mech Scope
11/24/2021 Drawing wall and door detail
11/24/2021 Letter use of space
11/24/2021 Letter MEPs & on site contact
11/24/2021 Letter Fire Building Plan Review
12/14/2021 338656-FA100_stamped
12/14/2021 Letter Fire (Alarm) Plan Review Notice
12/14/2021 Letter Fire (Sprinkler) Plan Review
12/20/2021 Letter MEPs & on site contact
12/20/2021 Approved Plans approved - City Hall Conf room permit REQs
12/20/2021 Receipt Receipt for transaction:2021-009393
02/01/2022 Letter DS Building Permit
02/01/2022 Letter INSPECTION SUMMARY
02/24/2022 Letter INSPECTION SUMMARY
02/28/2022 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home