Permit Application Status

PRCOM20215330


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20215330
Building Permit - Commercial
Certificate of Occupancy
SUMMIT WOODS SPE LLC
CHANGE OF TENANT
CHANGE OF TENANT FOR EYE GLASS SALES
10/12/2021
03/18/2022
04/16/2022
08/26/2022
Locations
Contacts
HORIZON RETAIL CONSTRUCTION INC, Address:9999 E EXPLORATION CT, Phone:(262) 638-6000  
mickeyg@horizonretail.com, Address:mickeyg@horizonretail.com, Phone:(262) 698-7025  
PRO PLATINUM LLC, Address:6116 ALDEN RD, Phone:(913) 908-3512  
BART'S ELECTRIC COMPANY INC, Address:7103 STEWART RD, Phone:(816) 421-0007  
QUESTEC MECHANICAL INC, Address:1390 E BOONE INDUSTRIAL DR, SUITE 260, Phone:(573) 875-0260  
JLL Architecture, Address:51 W 3rd St, Ste 201, Phone:(480) 401-3665  
SUMMIT WOODS SPE LLC, Address:1 E WASHINGTON ST STE 300  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 01/19/2022 03/18/2022
Joe Frogge
LC - General Contractor
Resolved
03/18/2022

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor and an email address for the on-site contact. 12/6/21 - acknowledged in letter
LC - MEP Subs
Resolved
03/18/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 12/6/21 - acknowledged in letter
Fire Plan Review Approved with Conditions 01/19/2022 01/18/2022
Jim Eden
Construction documents for fire alarm systems
Corrective Action Required
01/14/2022

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Any modifications to the fire alarm system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Address numbers required
Corrective Action Required
01/14/2022

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection)
Construction documents - Fire protection systems
Corrective Action Required
01/14/2022

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Any modifications to the fire sprinkler system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Installation acceptance testing
Informational
01/18/2022

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Portable fire extinguishers - general
Corrective Action Required
01/18/2022

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Provide a minimum of twwo, 2A;10B;C fire extinguishers near the front and rear of the store. Verified at inspection.
Building Plan Review Approved 01/19/2022 01/14/2022
Joe Frogge
Building Plan Review Approved 12/07/2021 12/06/2021
Joe Frogge
IBC 602.1 Type of Construction - general
Resolved
12/06/2021

2018 IBC 602.1 General. Buildings and structures erected or to be erected, altered or extended in height or area shall be classified in one of the five construction types defined in Sections 602.2 through 602.5. the building elements shall have a fire-resistance rating not less than that specified in Table 601 and exterior walls shall have a fire resistance rating not less than that specified in Table 602. Where required to have a fire-resistance rating by Table 601, building elements shall comply with the applicable provisions of Section 703.2. The protection for openings, ducts and air transfer openings in building elements shall not be required unless required by other provisions of this code. Action required: Update Code Information on cover sheet to show correct building construction type which is 2B.
IBC 1209.2 Finish materials
Resolved
12/06/2021

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. Action required: Specify compliant wall finish material at mop sink. If paint is used it must be epoxy based.
IBC 1606.2 Design dead load - structural
Resolved
12/06/2021

2018 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official. Action required: Provide verification that existing roof structure will support additional load imposed by new hvac equipment. 12/6/21 - hvac permitted separately
Licensed Contractors Rejected 12/07/2021 12/06/2021
Joe Frogge
LC - General Contractor
Corrective Action Required
11/30/2021

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor and an email address for the on-site contact. 12/6/21 - acknowledged in letter
LC - MEP Subs
Corrective Action Required
11/30/2021

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 12/6/21 - acknowledged in letter
Fire Plan Review Approved with Conditions 12/07/2021 11/30/2021
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
11/30/2021

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Any modifications to the fire alarm system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Address numbers required
Corrective Action Required
11/30/2021

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection)
Construction documents - Fire protection systems
Corrective Action Required
11/30/2021

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Any modifications to the fire sprinkler system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Installation acceptance testing
Corrective Action Required
11/30/2021

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Building Plan Review Rejected 10/22/2021 10/18/2021
Joe Frogge
IBC 602.1 Type of Construction - general
Corrective Action Required
10/18/2021

2018 IBC 602.1 General. Buildings and structures erected or to be erected, altered or extended in height or area shall be classified in one of the five construction types defined in Sections 602.2 through 602.5. the building elements shall have a fire-resistance rating not less than that specified in Table 601 and exterior walls shall have a fire resistance rating not less than that specified in Table 602. Where required to have a fire-resistance rating by Table 601, building elements shall comply with the applicable provisions of Section 703.2. The protection for openings, ducts and air transfer openings in building elements shall not be required unless required by other provisions of this code. Action required: Update Code Information on cover sheet to show correct building construction type which is 2B.
IBC 1209.2 Finish materials
Corrective Action Required
10/18/2021

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. Action required: Specify compliant wall finish material at mop sink. If paint is used it must be epoxy based.
IBC 1606.2 Design dead load - structural
Corrective Action Required
10/18/2021

2018 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official. Action required: Provide verification that existing roof structure will support additional load imposed by new hvac equipment.
Licensed Contractors Rejected 10/22/2021 10/18/2021
Joe Frogge
LC - General Contractor
Corrective Action Required
10/18/2021

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor and an email address for the on-site contact.
LC - MEP Subs
Corrective Action Required
10/18/2021

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Approved with Conditions 10/22/2021 10/12/2021
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
10/12/2021

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Any modifications to the fire alarm system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Address numbers required
Corrective Action Required
10/12/2021

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection)
Construction documents - Fire protection systems
Corrective Action Required
10/12/2021

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Any modifications to the fire sprinkler system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Installation acceptance testing
Corrective Action Required
10/12/2021

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for Change of Tenant $1,700.00 $1,700.00 Paid 03/18/2022
$0.00
8331507-Sewer Connection Fee $180.00 $180.00 Paid 03/18/2022
Commercial Excise Tax Fee $6,735.00 $6,735.00 Paid 03/18/2022
$6,352.50
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Miscellaneous Inspection Passed 3/28/2022 3/28/2022 03/28/2022
Misc
Informational
03/28/2022
3/28/22 Met with contractor to discuss inspection process and phasing
Underslab Electrical Inspection - Commercial Passed 4/4/2022 4/4/2022 04/04/2022
Underslab Plumbing Inspection - Commercial Passed 4/4/2022 4/4/2022 04/04/2022
In-wall Inspection Partial 4/22/2022 4/22/2022 04/22/2022
Misc
Informational
04/22/2022
- 4/22/22 IN WALL APPROVED
In-wall Inspection Passed 5/5/2022 5/5/2022 05/05/2022
Above Ceiling Inspection Partial 5/12/2022 5/12/2022 05/12/2022
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
05/12/2022
- 5/12/22 HARD LID SALES AREA ONLY OK TO ROCK -
In-wall Inspection Passed 5/18/2022 05/18/2022
Misc
Informational
05/18/2022
- 4/22/22 IN WALL APPROVED
Above Ceiling Inspection Passed 5/18/2022 05/18/2022
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
05/12/2022
- 5/12/22 HARD LID SALES AREA ONLY OK TO ROCK - - 5/18/22 ABOVE CEILING COMPLETE -
Above Ceiling Inspection Failed 6/7/2022 6/7/2022 06/07/2022
Misc
Corrective Action Required
06/07/2022
-COMPLETE ELECTRICAL -REMOVE TEMP LIGHTING -PROVIDE COVER PLATES AT OPEN BOXES
Above Ceiling Inspection Passed 6/8/2022 06/08/2022
Misc
Resolved
06/08/2022
-COMPLETE ELECTRICAL -REMOVE TEMP LIGHTING -PROVIDE COVER PLATES AT OPEN BOXES
Gas Piping Inspection - Commercial Partial 6/13/2022 6/13/2022 06/13/2022
Misc
Corrective Action Required
06/13/2022
-Paint new gas line with corrosion resistant paint
Gas Service Inspection - Commercial Passed 06/13/2022
Occupancy Inspection - Codes Commercial Failed 6/15/2022 6/15/2022 06/15/2022
Misc
Corrective Action Required
06/15/2022
-Provide anti-siphon device at hose bib -Complete bathrooms -Paint roof top gas line ***OK TO STOCK ONLY
Alarm Test Passed 6/15/2022 06/20/2022
Occupancy Inspection - Fire Passed 6/15/2022 6/15/2022 06/20/2022
Corrective Action Required
06/20/2022
All life safety was appropriate. Okay to occupy with approval form codes.
Occupancy Inspection - Codes Commercial Temporary C of O 6/20/2022 6/20/2022 06/20/2022
Misc
Corrective Action Required
06/15/2022
***TCO UNTIL 7/5/22 -PROVIDE OPEN FACED TOILET SEATS
Occupancy Inspection - Codes Commercial Temporary C of O 6/29/2022 06/29/2022
Misc
Corrective Action Required
06/20/2022
***TCO UNTIL 8/19/22 -PROVIDE OPEN FACED TOILET SEATS PER IPC 425.3
Occupancy Inspection - Codes Commercial Full C of O 8/26/2022 8/26/2022 08/26/2022
Misc
Resolved
08/26/2022
***TCO UNTIL 7/19/22 -PROVIDE OPEN FACED TOILET SEATS PER IPC 425.3
Gas Piping Inspection - Commercial Passed 08/26/2022
Misc
Resolved
08/26/2022
-Paint new gas line with corrosion resistant paint
Documents & Images
Date Uploaded File Type Document Name
10/12/2021 Application Form LensCrafters - Lees Summit - Permit Application
10/12/2021 Application Form LensCrafters - Lees Summit - Tax Application
10/12/2021 Plans LC Summit Woods Plan Set
10/12/2021 Letter Fire Building Plan Review
10/12/2021 Email LT info
10/18/2021 Letter DS P/R Corrections Document
11/30/2021 Plans LC Summit Woods Plan Set
11/30/2021 Letter LC - Summit Woods - Written Responses
11/30/2021 Letter Fire Building Plan Review
12/06/2021 Plans old- LC Summit Woods Plan Set0
01/14/2022 Plans letter and updated drawings (incomplete)
01/14/2022 Application Form LensCrafters - Lees Summit - Revision Application
03/08/2022 Plans LC Summit Woods Plan Set - Complete
03/08/2022 Approved Plans approved - LC Summit Woods Plan Set
03/18/2022 Receipt Receipt for transaction:2022-001505
03/18/2022 Letter DS Building Permit
03/28/2022 Letter INSPECTION SUMMARY
04/04/2022 Letter INSPECTION SUMMARY
04/04/2022 Letter INSPECTION SUMMARY
04/22/2022 Letter INSPECTION SUMMARY
05/05/2022 Letter INSPECTION SUMMARY
05/12/2022 Letter INSPECTION SUMMARY
05/18/2022 Letter INSPECTION SUMMARY
05/18/2022 Letter INSPECTION SUMMARY
06/07/2022 Letter INSPECTION SUMMARY
06/08/2022 Letter INSPECTION SUMMARY
06/08/2022 Letter INSPECTION SUMMARY
06/13/2022 Letter INSPECTION SUMMARY
06/13/2022 Letter INSPECTION SUMMARY
06/15/2022 Letter INSPECTION SUMMARY
06/20/2022 Letter Fire Loss Reduction Form
06/20/2022 Letter Codes Temporary Certificate of Occupancy
06/29/2022 Letter Codes Temporary Certificate of Occupancy
08/26/2022 Letter Codes Final Certificate of Occupancy
08/26/2022 Letter Field Certificate of Occupancy
08/26/2022 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home