Permit Application Status

PRCOM20215282


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20215282
Building Permit - Commercial
Certificate of Occupancy
CHAPEL RIDGE TOWNHOMES LLC
NEW MULTI-FAMILY
NEW 5PLEX
10/08/2021
08/25/2022
06/22/2023
Locations
Contacts
CAPITAL CONSTRUCTION SERVICES LLC, Address:2642 NE HAGAN RD, Phone:(816) 875-0018  
DROTHFUSS@CAPITALCONST.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
INHOME SYSTEMS LLC, Address:510 MISSION RD SW, Phone:(816) 372-0483  
A BRIGHT PLUMBING LLC, Address:201 NE WOODBURY DR, Phone:(816) 867-4540  
DAVIDSON ARCHITECTURE & ENGINEERING, Address:4301 INDIAN CREEK PKWY, Phone:(913) 451-9390  
CHAPEL RIDGE TOWNHOMES LLC, Address:3701 NE AKIN DR  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 01/07/2022
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
8331506-EFHB Maybrook, Full $2,343.55 $2,343.55 Paid 08/24/2022
8331507-Sewer Connection Fee $1,650.00 $1,650.00 Paid 08/24/2022
7232302-Residential Excise Tax Fee $3,046.40 $3,046.40 Paid 08/24/2022
9110078-Valuation Fee for New Multi-Family $3,960.71 $3,960.71 Paid 08/24/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Passed 12/15/2022 (3:30) 12/15/2022 12/15/2022
Underslab Plumbing Inspection - Commercial Passed 12/29/2022 12/29/2022 12/29/2022
Rated Assembly Inspection Partial 2/14/2023 2/14/2023 02/14/2023
Misc
Corrective Action Required
02/14/2023
Attic firewall-1st layer OK **Scott-I tried to communicate with the framers to remove all the wood blockings from the firewall until after the 2nd layer of fire rock. I think they understood me with just the “yes” and “no”. You still want to check and make sure
Gas Service Inspection - Commercial Failed 3/21/2023 3/21/2023 03/21/2023
Misc
Corrective Action Required
03/21/2023
-Unit A and D test pressure less than ten psi
All Rough Inspection - Commercial Failed 3/21/2023 3/21/2023 03/21/2023
Misc
Corrective Action Required
03/21/2023
UNIT A: -Complete electrical to kitchen island -Secure SE and NM cables above kitchen per code -Strap exterior wall top plates lapped less than 2 ft at master shower -Vent master bathroom fan -Provide min 1” clearance from b-vent to combustible material at roof deck sheathing UNIT B: -Complete electrical to kitchen island -Secure SE and NM cables above kitchen per code -Protect dryer duct with min 16 gauge thickness metal paste -B-vent must slope upward min 1/4” per ft -Complete electrical to rear bedroom wall receptacle -Vent rear bathroom fan -Provide min 1” clearance from b-vent to roof deck sheathing UNIT C: -Protect half bathroom fan duct -Complete electrical to kitchen island -Secure SE cable above kitchen per code -Protect wiring bottom wall plate at top stair landing -Fb floor penetrations at rear bathroom tub trap and dryer duct -Protect dryer duct with min 16 gauge thickness metal plate -Provide min 1” clearance from b-vent to roof deck sheathing UNIT D: -Complete electrical to kitchen island -Secure SE and NM cables above kitchen per code -Provide min 1” clearance from b-vent to roof deck sheathing UNIT E: -Complete electrical to kitchen island -Secure SE cable above kitchen per code -Nail corner studs per code -Wiring outside stair wall stud space -Install master closet light box -Strap exterior wall top plates lapped less than 2 ft at master shower -Provide min 1” clearance from b-vent to roof deck sheathing **OK TO INSULATE
Electrical Service Inspection Failed 3/21/2023 3/21/2023 03/21/2023
Misc
Corrective Action Required
03/21/2023
Bond service enclosure
Electrical Service Inspection Passed 3/24/2023 3/24/2023 03/24/2023
Misc
Resolved
03/24/2023
Bond service enclosure
Gas Service Inspection - Commercial Passed 3/24/2023 3/24/2023 03/24/2023
Misc
Resolved
03/24/2023
-Unit A and D test pressure less than ten psi
All Rough Inspection - Commercial Passed 3/24/2023 3/24/2023 03/24/2023
Misc
Resolved
03/24/2023
UNIT A: -Secure SE and NM cables above kitchen per code **Secure NM at interval no more than 4.5 ft UNIT B: UNIT C: -Secure SE and NM cables above kitchen per code **Secure NM at interval no more than 4.5 ft UNIT D: -Secure SE and NM cables above kitchen per code **Secure NM at interval no more than 4.5 ft UNIT E:
Rated Assembly Inspection Partial 4/4/2023 4/4/2023 04/04/2023
Misc
Corrective Action Required
02/14/2023
Attic firewall-2nd layer OK Dwelling firewall-1st layer OK
Rated Assembly Inspection Passed 4/10/2023 4/10/2023 04/10/2023
Misc
Resolved
04/10/2023
Attic firewall-2nd layer OK Dwelling firewall-1st layer OK
Occupancy Inspection - Codes Commercial Failed 6/20/2023 6/20/2023 06/20/2023
Misc
Corrective Action Required
06/20/2023
EXTERIOR: -Final grade, sod, downspout splash blocks -Secure AC whip per code -Seal wall penetrations UNIT A: -Provide clean out for furnace condensate drain -Master bathroom fan not working UNIT B: -Provide clean out for furnace condensate drain -Correct electrical connection to furnace to code compliance UNIT C: -Provide clean out for furnace condensate drain UNIT D: -Fix loose receptacle on master bathroom -Master bathroom fan not working -Provide clean out for furnace condensate drain UNIT E: -Install furnace electrical termination cover; secure switch box -Provide clean out for furnace condensate drain
Occupancy Inspection - Codes Commercial Failed 6/21/2023 6/21/2023 06/21/2023
Misc
Corrective Action Required
06/20/2023
UNIT E: -Install furnace electrical termination cover; secure switch box
Occupancy Inspection - Codes Commercial Full C of O 6/22/2023 6/22/2023 06/22/2023
Misc
Resolved
06/22/2023
UNIT E: -Install furnace electrical termination cover; secure switch box
Documents & Images
Date Uploaded File Type Document Name
08/24/2022 Receipt Receipt for transaction:2022-006945
08/25/2022 Letter DS Building Permit
12/15/2022 Letter INSPECTION SUMMARY
12/29/2022 Letter INSPECTION SUMMARY
02/14/2023 Letter INSPECTION SUMMARY
03/21/2023 Letter INSPECTION SUMMARY
03/21/2023 Letter INSPECTION SUMMARY
03/21/2023 Letter INSPECTION SUMMARY
03/24/2023 Letter INSPECTION SUMMARY
03/24/2023 Letter INSPECTION SUMMARY
03/24/2023 Letter INSPECTION SUMMARY
04/04/2023 Letter INSPECTION SUMMARY
04/10/2023 Letter INSPECTION SUMMARY
06/20/2023 Letter INSPECTION SUMMARY
06/22/2023 Letter INSPECTION SUMMARY
06/22/2023 Letter INSPECTION SUMMARY
06/22/2023 Letter Field Certificate of Occupancy
06/22/2023 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home