PRCOM20213741
Building Permit - Commercial
Certificate of Occupancy
CITY OF LEES SUMMIT
NEW COMMERCIAL
POOL HOUSE WITH RESTROOMS LEASING OFFICE AND MAINTENANCE GARAGES *Documents and plan reviews are in PRCOM20213548
07/20/2021
02/01/2022
09/13/2023
Locations
Contacts
BRINKMANN CONSTRUCTORS, Address:16650 CHESTERFIELD GROVE RD, Phone:(636) 537-9700  
LPolowy@brinkmannconstructors.com, Address:LPolowy@brinkmannconstructors.com  
WELKER HEATING & COOLING, Address:2221 N 147TH STREET, Phone:(913) 669-7555  
LYNN ELECTRIC & COMMUNICATIONS INC, Address:725 N 2ND ST STE K, Phone:(785) 843-5709  
MILLER PLUMBING CO, Address:PO BOX 393 , Phone:(913) 851-1333  
TRI Architects, Address:9812 Manchester rd, Phone:(314) 395-9750  
CITY OF LEES SUMMIT, Address:220 SE GREEN ST  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Plan Review Approved with Conditions 02/01/2022
Joe Frogge
Building Plan Review Approved with Conditions 02/01/2022
Joe Frogge
Licensed Contractors Approved 08/03/2021 11/19/2021
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Commercial $1,001.68 $1,001.68 Paid 11/11/2021
8331507-Sewer Connection Fee $210.00 $210.00 Paid 12/03/2021
9110081-Paved Surface Inspection Fee $501.00 $501.00 Paid 12/03/2021
9110072-Water Test Fee $200.00 $200.00 Paid 12/03/2021
9110071-Site Grading Fee $795.00 $795.00 Paid 12/03/2021
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 05/26/2023
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 06/27/2023
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 08/11/2023
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 09/12/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Passed 6/21/2022 06/21/2022
Underslab Plumbing Inspection - Commercial Passed 7/6/2022 7/6/2022 07/06/2022
Underslab Electrical Inspection - Commercial Passed 07/12/2022
Water Service Inspection Partial 07/15/2022
Misc
Informational
07/15/2022
Met with Eric Wiggins from WU to look at meter and verify location. 7/15/22 ES
All Rough Inspection - Commercial Partial 11/01/2022
Misc
Informational
11/01/2022
-DATA ROOM APPROVED
All Rough Inspection - Commercial Partial 12/1/2022 12/1/2022 12/01/2022
Misc
Informational
11/01/2022
-DATA ROOM APPROVED
Misc
Corrective Action Required
12/01/2022
-Provide hanger at corner joist -Protect dryer ducts -Nail exterior corners -Protect dwv at bath -Remove dead front to inspect electrical panel
All Rough Inspection - Commercial Failed 12/12/2022
Misc
Informational
12/01/2022
-DATA ROOM APPROVED
Misc
Corrective Action Required
12/01/2022
-Protect dryer ducts -Remove dead front to inspect electrical panel
Rated Assembly Inspection Passed 12/30/2022 12/30/2022 12/30/2022
All Rough Inspection - Commercial Passed 01/31/2023
Misc
Resolved
01/31/2023
-DATA ROOM APPROVED
Misc
Resolved
01/31/2023
-Protect dryer ducts -Remove dead front to inspect electrical panel
Above Ceiling Inspection Passed 01/31/2023
Pool Steel/Bonding - Commercial Partial 1/31/2023 1/31/2023 01/31/2023
Misc
Informational
01/31/2023
Components bonded: -Pool steel (4) points, Sleeve for ADA lift
Misc
Corrective Action Required
01/31/2023
-Provide water bond -Connect bonding to equipment pad location -Secure perimeter surface bond 18"-24" from edge of water
Pool Steel/Bonding - Commercial Passed 2/1/2023 2/1/2023 02/01/2023
Misc
Informational
01/31/2023
Components bonded: -Pool steel (4) points, Sleeve for ADA lift, Perimeter surface, to equipment pad, handrail, water
Misc
Resolved
02/01/2023
Occupancy Inspection - Engineering Temporary C of O 2/14/2023 2/14/2023 02/14/2023
Misc
Informational
02/14/2023
2-14-23 DP. address cracks in concrete, finish backfill and grading, vegetation. TCO granted.
Occupancy Inspection - Codes Commercial Failed 2/14/2023 2/14/2023 02/14/2023
Misc
Corrective Action Required
02/14/2023
-Install all grab bars in proper locations at both restrooms -Provide code compliant screen at fresh air duct -Install permanent sign at electrical room -Provide GFCIs at washer receptacles -Seal ceiling penetrations in storage garages -Complete canopy and exterior electrical -Cut exterior cleanout to grade -Install all permanent fencing, exit devices, occupant load signage etc- To be conmplete before TCO -Obtain health department approval for pool -Complete corrections for all other departments
Occupancy Inspection - Water Utilities Passed 02/15/2023
Occupancy Inspection - Planning Temporary C of O 02/28/2023
Corrective Action Required
02/28/2023
LANDSCAPING. Install sod and landscaping per the approved plan.
Occupancy Inspection - Codes Commercial Failed 2/28/2023 2/28/2023 02/28/2023
Misc
Corrective Action Required
02/14/2023
**OK to use workout room. Pool area to remain locked until Final Inspeciton is complete -Complete pool -Install permanent sign at electrical room -Provide GFCIs at washer receptacles -Seal ceiling penetrations in storage garages -Complete exterior electrical at canopy -Cut exterior cleanout to grade -Install all permanent fencing, exit devices, occupant load signage etc -Obtain health department approval for pool -Complete corrections for all other departments
Occupancy Inspection - Fire Failed 2/28/2023 02/28/2023
Corrective Action Required
02/28/2023
Okay to occupy the fitness room.
Occupancy Inspection - Engineering Temporary C of O 2/28/2023 2/28/2023 02/28/2023
Misc
Informational
02/14/2023
2-14-23 DP. address cracks in concrete, finish backfill and grading, vegetation. TCO granted. 2-28-23 DP. Backfill and grading looked good. Still lacking vegetation and concrete repairs. TCO still granted.
Occupancy Inspection - Engineering Temporary C of O 5/25/2023 5/25/2023 05/25/2023
Misc
Informational
02/28/2023
2-14-23 DP. address cracks in concrete, finish backfill and grading, vegetation. TCO granted. 2-28-23 DP. Backfill and grading looked good. Still lacking vegetation and concrete repairs. TCO still granted. 5-25-23 DP. Still need to replace panel on west side of building that is broke in half. Vegetation is coming in nicely. TCO still granted from our end.
Occupancy Inspection - Fire Failed 5/25/2023 5/25/2023 05/25/2023
Occupancy Inspection - Codes Commercial Failed 5/25/2023 5/25/2023 05/25/2023
Misc
Corrective Action Required
02/28/2023
**OK to use workout room. Pool area to remain locked until Final Inspeciton is complete -Install permanent sign at electrical room -Cut exterior cleanout to grade -Complete corrections for all other departments -Label pool panel -Secure raceways within 12" of boxes at pool equipment
Occupancy Inspection - Codes Commercial Ready for Temp CO 5/26/2023 5/26/2023 05/26/2023
Misc
Corrective Action Required
05/25/2023
-Provide accessible entry gate hardware per IBC 1010.1.9.1 -Cut exterior cleanout to grade -Complete corrections for all other departments -Label pool panel -Secure raceways within 12" of boxes at pool equipment
Occupancy Inspection - Fire Passed 5/26/2023 5/26/2023 05/26/2023
Occupancy Inspection - Codes Commercial Ready for Temp CO 6/26/2023 6/26/2023 06/26/2023
Misc
Corrective Action Required
05/26/2023
-Provide accessible entry gate hardware per IBC 1010.1.9.1 -Cut exterior cleanout to grade -Complete corrections for all other departments -Label pool panel -Secure raceways within 12" of boxes at pool equipment
Occupancy Inspection - Codes Commercial Failed 7/28/2023 7/28/2023 07/28/2023
Misc
Corrective Action Required
06/26/2023
-Provide accessible entry gate hardware per IBC 1010.1.9.1 -Cut exterior cleanout to grade -Complete corrections for all other departments -Label pool panel -Secure raceways within 12" of boxes at pool equipment **TCO EXPIRED ON 7/28/23, 10 DAY NOTICE OF VIOLATION ISSUED
Occupancy Inspection - Codes Commercial Ready for Temp CO 08/11/2023
Misc
Corrective Action Required
07/28/2023
-Provide accessible entry gate hardware per IBC 1010.1.9.1 -Cut exterior cleanout to grade -Complete corrections for all other departments -Label pool panel -Secure raceways within 12" of boxes at pool equipment
Occupancy Inspection - Codes Commercial Ready for Temp CO 9/11/2023 9/11/2023 09/11/2023
Misc
Corrective Action Required
08/11/2023
-Provide accessible entry gate hardware per IBC 1010.1.9.1 -Cut exterior cleanout to grade -Complete corrections for all other departments -Label pool panel -Secure raceways within 12" of boxes at pool equipment
Occupancy Inspection - Codes Commercial Full C of O 9/13/2023 9/13/2023 09/13/2023
Misc
Resolved
09/13/2023
-Provide accessible entry gate hardware per IBC 1010.1.9.1 -Cut exterior cleanout to grade -Complete corrections for all other departments -Label pool panel -Secure raceways within 12" of boxes at pool equipment
Documents & Images
Date Uploaded File Type Document Name
11/11/2021 Receipt Receipt for transaction:2021-008696
12/03/2021 Receipt Receipt for transaction:2021-009078
02/01/2022 Letter DS Building Permit
03/14/2022 Approved SWP Lot 7A POOL - photometric not included
06/21/2022 Letter INSPECTION SUMMARY
06/21/2022 Letter INSPECTION SUMMARY
07/06/2022 Letter INSPECTION SUMMARY
07/12/2022 Letter INSPECTION SUMMARY
07/15/2022 Letter INSPECTION SUMMARY
11/01/2022 Letter INSPECTION SUMMARY
12/01/2022 Letter INSPECTION SUMMARY
12/12/2022 Letter INSPECTION SUMMARY
12/30/2022 Letter INSPECTION SUMMARY
01/31/2023 Letter INSPECTION SUMMARY
01/31/2023 Letter INSPECTION SUMMARY
01/31/2023 Letter INSPECTION SUMMARY
02/01/2023 Letter INSPECTION SUMMARY
02/14/2023 Letter INSPECTION SUMMARY
02/14/2023 Letter INSPECTION SUMMARY
02/28/2023 Letter INSPECTION SUMMARY
02/28/2023 Letter INSPECTION SUMMARY
02/28/2023 Letter INSPECTION SUMMARY
02/28/2023 Letter Fire Loss Reduction Form
02/28/2023 Letter INSPECTION SUMMARY
05/25/2023 Letter INSPECTION SUMMARY
05/25/2023 Letter INSPECTION SUMMARY
05/25/2023 Aquatic Facility Inspection Report 5_25_23
05/26/2023 Certificate/License Codes Temporary Certificate of Occupancy
05/26/2023 Receipt Receipt for transaction:2023-003704
06/26/2023 Substantial Completion and TCO Extension Request_prcom20213741 - 6_26_23
06/27/2023 Certificate/License Codes Temporary Certificate of Occupancy
06/27/2023 Receipt Receipt for transaction:2023-004889
07/28/2023 Letter Codes 10 Day Letter
07/28/2023 Letter INSPECTION SUMMARY
07/31/2023 Substantial Completion and TCO Extension Request_prcom20213741 - 7_27_23
08/10/2023 Substantial Completion and TCO Extension Request_prcom20213741 - 7_27_23
08/11/2023 Substantial Completion and TCO Extension Request_prcom20213741 - 8_11_23
08/11/2023 Certificate/License Codes Temporary Certificate of Occupancy
08/11/2023 Receipt Receipt for transaction:2023-006250
09/11/2023 Substantial Completion and TCO Extension Request_prcom20213741 - 9_11_23
09/12/2023 Certificate/License Codes Temporary Certificate of Occupancy
09/12/2023 Receipt Receipt for transaction:2023-006959
09/13/2023 Letter Codes Final Certificate of Occupancy
09/13/2023 Letter Field Certificate of Occupancy
12/20/2023 Codes Temporary Certificate of Occupancy205
12/20/2023 Codes Temporary Certificate of Occupancy244
12/20/2023 Codes Temporary Certificate of Occupancy282
12/20/2023 Codes Temporary Certificate of Occupancy296
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home