Permit Application Status

PRCOM20212561


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20212561
Building Permit - Commercial
Certificate of Occupancy
CITY OF LEES SUMMIT
NEW TENANT FINISH
TENANT FINISH FOR YOGA
05/18/2021
06/02/2021
09/13/2021
Locations
Contacts
Mohr Construction Service, LLC, Address:650 S. Prairieview Dr. Ste. 125, PMB 205, Phone:(515) 208-4319  
amr3hc@gmail.com, Address:amr3hc@gmail.com  
PRO-MECHANICAL, Address:P O BOX 903, Phone:(816) 743-4800  
Citadel Electric Group, Inc., Address:31710 E Colbern Rd  
PRO-MECHANICAL, Address:P O BOX 903, Phone:(816) 743-4800  
Simonson & Associates, Address:1717 Ingersoll Avenue, Suite 117, Phone:(515) 440-5626  
CITY OF LEES SUMMIT, Address:220 SE GREEN ST  
Reviews
Review Type Outcome Est. Completion Date Completed
Sprinkler Plan Review Released for Construction 06/22/2021 06/22/2021
Michael Weissenbach
Installation acceptance testing
Corrective Action Required
06/22/2021

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule a hydrostatic test.
Alarm Plan Review Released for Construction 06/03/2021 06/03/2021
Michael Weissenbach
Installation acceptance testing
Corrective Action Required
06/03/2021

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Licensed Contractors Approved 06/01/2021 06/02/2021
Joe Frogge
LC - MEP Subs
Resolved
06/02/2021

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Building Plan Review Approved 05/28/2021 05/21/2021
Joe Frogge
Fire Plan Review Approved with Conditions 05/28/2021 05/19/2021
Michael Weissenbach
Posting of occupant load
Corrective Action Required
05/19/2021

2018 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. (Verified At Inspection) Post occupant load at 56
Construction documents for fire alarm systems
Corrective Action Required
05/19/2021

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Any modifications to the fire alarm system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Construction documents - Fire protection systems
Corrective Action Required
05/19/2021

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Any modifications to the fire sprinkler system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Installation acceptance testing
Corrective Action Required
05/19/2021

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Portable fire extinguishers - conspicuous locations
Corrective Action Required
05/19/2021

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (Action Required) Provide one 2A10BC Fire extinguisher.
Panic and fire exit hardware
Corrective Action Required
05/19/2021

2018 IFC 1010.1.10 Panic and fire exit hardware. Doors serving a Group H occupancy and doors serving rooms or spaces with an occupant load of 50 or more in a Group A or E occupancy shall not be provided with a latch or lock unless it is a panic hardware or fire exit hardware. (Informational Purposes) Panic hardware required for exit doors if not existing.
Illumination required
Corrective Action Required
05/19/2021

2018 IFC 1008.1 Illumination required. The means of egress, shall be illuminated at all times the building space served by the means of egress is occupied. (Informational Purposes) Exterior emergency lighting required if not existing.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Tenent Finish $80.00 $80.00 Paid 05/25/2021
7232302-Commercial License Tax Fee $8,512.50 $8,512.50 Paid 08/19/2021
8331507-Sewer Connection Fee $450.00 $450.00 Paid 05/25/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Passed 7/1/2021 7/1/2021 07/01/2021
Underslab Plumbing Inspection - Commercial Passed 8/5/2021 8/5/2021 08/05/2021
Rough Plumbing Inspection - Commercial Passed 8/11/2021 8/11/2021 08/11/2021
Above Ceiling Inspection Partial 8/19/2021 8/19/2021 08/19/2021
Miscellaneous Correction
Corrective Action Required
08/19/2021
- STUDIO # 1 SEAL PENETRATION 1 HOUR WALL SOUTH SIDE, COMPLETE VENT TO ROOF. ALL OTHER AREAS OK TO DROP CEILING TILES -
Above Ceiling Inspection Passed 8/19/2021 08/19/2021
Miscellaneous Correction
Resolved
08/19/2021
OK TO DROP CEILING TILES -
Occupancy Inspection - Fire Temporary C of O 9/9/2021 9/9/2021 09/09/2021
Corrective Action Required
09/09/2021
Change sounder basins to strobe only in bathrooms.
Occupancy Inspection - Codes Commercial Temporary C of O 9/9/2021 9/9/2021 09/09/2021
Misc
Corrective Action Required
09/09/2021
Provide insulation for drains under men's & women's restroom vanity's Provide missing cover panels @ service panels
Occupancy Inspection - Codes Commercial Full C of O 9/13/2021 9/13/2021 09/13/2021
Misc
Resolved
09/13/2021
Occupancy Inspection - Fire Passed 9/13/2021 09/13/2021
Documents & Images
Date Uploaded File Type Document Name
05/18/2021 Application Form Comm Permit Application
05/18/2021 Application Form License Tax
05/18/2021 Plans Power Life- Lee's Summit, MO_Permit Plans
05/19/2021 Letter License Tax Bill
05/19/2021 Letter Fire Building Plan Review
05/25/2021 Approved Plans approved - Power Life- Lee's Summit, MO_Permit Plans
05/25/2021 Receipt Receipt for transaction:2021-003488
06/02/2021 Letter DS Building Permit
06/03/2021 Power Life FA 5 25 21 PE Stamp
06/03/2021 Power Life FA Calcs PE Stamp
06/03/2021 Product Data
06/03/2021 Letter Fire (Alarm) Plan Review Notice
06/22/2021 Power Life - Fire Sprinkler TI Plans
06/22/2021 Letter Fire (Sprinkler) Plan Review
07/01/2021 Letter INSPECTION SUMMARY
08/05/2021 Letter INSPECTION SUMMARY
08/11/2021 Letter INSPECTION SUMMARY
08/19/2021 Receipt Receipt for transaction:2021-006653
08/19/2021 Letter INSPECTION SUMMARY
08/19/2021 Letter INSPECTION SUMMARY
09/09/2021 Letter Codes Temporary Certificate of Occupancy
09/09/2021 Letter Fire Loss Reduction Form
09/13/2021 Letter Field Certificate of Occupancy
09/13/2021 Letter Codes Final Certificate of Occupancy
10/13/2021 Letter Fire Loss Reduction Form
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home