Permit Application Status

PRCOM20212095


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20212095
Building Permit - Commercial
Certificate of Occupancy
TI SUMMIT CREST PLAZA LLC
CHANGE OF TENANT
DOMINO'S - TENANT FINISH FOR CARRY-OUT PIZZA SHOP
04/28/2021
07/19/2021
10/26/2021
08/31/2021
Locations
Contacts
WHR Construction Company, Inc., Address:1115 N WEST ST  
Gipson Heating & Cooling, Address:2117 S CUSTER AVE, Phone:(316) 990-4328  
Bar-TE & Associates, Address:800 E. Ford, Phone:(316) 734-6553  
Perfix, LLC, Address:PO Box 708, Phone:(620) 624-9255  
bmay2@yahoo.com, Address:bmay2@yahoo.com  
Gnich Architecture Studio, Address:1001 SE Sandy Blvd, Suite 100, Phone:(503) 552-9079  
TI SUMMIT CREST PLAZA LLC, Address:7611 STATE LINE RD STE 301  
bmay2@yahoo.com, Address:bmay2@yahoo.com  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 05/12/2021 07/16/2021
Joe Frogge
LC - General Contractor
Corrective Action Required
05/05/2021

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor and an email address for the on-site contact. 5/6/21 - Acknowledged in letter.
LC - MEP Subs
Corrective Action Required
05/05/2021

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 5/6/21 - Acknowledged in letter.
Building Plan Review Approved with Conditions 05/12/2021 07/16/2021
Joe Frogge
IBC 602.1 Type of Construction - general
Resolved
05/06/2021

2018 IBC 602.1 General. Buildings and structures erected or to be erected, altered or extended in height or area shall be classified in one of the five construction types defined in Sections 602.2 through 602.5. the building elements shall have a fire-resistance rating not less than that specified in Table 601 and exterior walls shall have a fire resistance rating not less than that specified in Table 602. Where required to have a fire-resistance rating by Table 601, building elements shall comply with the applicable provisions of Section 703.2. The protection for openings, ducts and air transfer openings in building elements shall not be required unless required by other provisions of this code. Action required: Update code summary to reflect correct construction type which is 5B. This building was retyped several years ago. (Sheets G1.0 & FLS1.0)
Health Dept Review
Resolved
05/17/2021

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is for informational purposes. 5/6/21 - Acknowledged in letter.
Health Dept Inspection
Corrective Action Required
05/05/2021

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes. 5/6/21 - Acknowledged in letter.
IBC 1606.2 Design dead load - structural
Resolved
07/16/2021

2018 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official. Action required: Provide engineer’s report to verify that existing roof structure will support additional load imposed by mechanical equipment. 5/6/21 - AHU-1, 2 & 3 appear to be suspended from existing roof joists/trusses. Provide report as requested or clarify.
Planning - Screening of ground mounted equipment
Resolved
05/06/2021

Unified Development Ordinance Article 8, Section 8.180.F Ground mounted equipment – Ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened from all 4 sides per referenced UDO section. (you may want to consider roof mounted which would be screened by existing parapets) 5/6/21 - hidden by existing landscaping
IMC 602.2.1 Materials within plenums
Resolved
05/06/2021

2018 IMC 602.2.1 Materials within plenums. Except as required by Sections 602.2.1.1 through 602.2.1.5, materials within plenums shall be noncombustible or shall be listed and labeled as having a flame spread index of not more than 25 and a smoke-developed index of not more than 50 when tested in accordance with ASTM E84 or UL 723. (see code section for exceptions) Action required: PVC not allowed in plenum. To be field verified.
IMC 602.1 Appliances in plenums
Resolved
05/06/2021

2018 IMC 602.1 General. Supply, return, exhaust, relief and ventilation air plenums shall be limited to uninhabited crawl spaces, areas above a ceiling or below the floor, attic spaces, mechanical equipment rooms and the framing cavities addressed in Section 602.3. Plenums shall be limited to one fire area. Air systems shall be ducted from the boundary of the fire area served directly to the air-handling equipment. Fuel-fired appliances shall not be installed within a plenum. Action required: Gas fired furnaces not allowed in plenum. (AHU-1 is not ducted)
Health Department Review Approved 05/17/2021
Joe Frogge
Fire Plan Review Approved with Conditions 05/12/2021 05/05/2021
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
05/05/2021

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Any modifications to the fire alarm system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Construction documents - Fire protection systems
Corrective Action Required
05/05/2021

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Any modifications to the fire sprinkler system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net Note: Walk-in cooler will need to be sprinklered.
Installation acceptance testing
Corrective Action Required
05/05/2021

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Building Plan Review Rejected 05/10/2021 04/29/2021
Joe Frogge
IBC 602.1 Type of Construction - general
Corrective Action Required
04/28/2021

2018 IBC 602.1 General. Buildings and structures erected or to be erected, altered or extended in height or area shall be classified in one of the five construction types defined in Sections 602.2 through 602.5. the building elements shall have a fire-resistance rating not less than that specified in Table 601 and exterior walls shall have a fire resistance rating not less than that specified in Table 602. Where required to have a fire-resistance rating by Table 601, building elements shall comply with the applicable provisions of Section 703.2. The protection for openings, ducts and air transfer openings in building elements shall not be required unless required by other provisions of this code. Action required: Update code summary to reflect correct construction type which is 5B. This building was retyped several years ago. (Sheets G1.0 & FLS1.0)
Health Dept Review
Corrective Action Required
04/28/2021

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is for informational purposes.
Health Dept Inspection
Corrective Action Required
04/28/2021

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes.
IBC 1606.2 Design dead load - structural
Corrective Action Required
04/29/2021

2018 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official. Action required: Provide engineer’s report to verify that existing roof structure will support additional load imposed by mechanical equipment.
Planning - Screening of ground mounted equipment
Corrective Action Required
04/29/2021

Unified Development Ordinance Article 8, Section 8.180.F Ground mounted equipment – Ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened from all 4 sides per referenced UDO section. (you may want to consider roof mounted which would be screened by existing parapets)
IMC 602.2.1 Materials within plenums
Corrective Action Required
04/29/2021

2018 IMC 602.2.1 Materials within plenums. Except as required by Sections 602.2.1.1 through 602.2.1.5, materials within plenums shall be noncombustible or shall be listed and labeled as having a flame spread index of not more than 25 and a smoke-developed index of not more than 50 when tested in accordance with ASTM E84 or UL 723. (see code section for exceptions) Action required: PVC not allowed in plenum. To be field verified.
IMC 602.1 Appliances in plenums
Corrective Action Required
04/29/2021

2018 IMC 602.1 General. Supply, return, exhaust, relief and ventilation air plenums shall be limited to uninhabited crawl spaces, areas above a ceiling or below the floor, attic spaces, mechanical equipment rooms and the framing cavities addressed in Section 602.3. Plenums shall be limited to one fire area. Air systems shall be ducted from the boundary of the fire area served directly to the air-handling equipment. Fuel-fired appliances shall not be installed within a plenum. Action required: Gas fired furnaces not allowed in plenum. (AHU-1 is not ducted)
Licensed Contractors Rejected 04/28/2021 04/29/2021
Joe Frogge
LC - General Contractor
Corrective Action Required
04/29/2021

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor and an email address for the on-site contact.
LC - MEP Subs
Corrective Action Required
04/29/2021

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Approved with Conditions 05/10/2021 04/28/2021
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
04/28/2021

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Any modifications to the fire alarm system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Construction documents - Fire protection systems
Corrective Action Required
04/28/2021

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Any modifications to the fire sprinkler system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net Note: Walk-in cooler will need to be sprinklered.
Installation acceptance testing
Corrective Action Required
04/28/2021

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Change of Tenant $1,540.00 $1,540.00 Paid 07/16/2021
8331507-Sewer Connection Fee $210.00 $210.00 Paid 07/16/2021
7232302-Commercial License Tax Fee $14,002.50 $14,002.50 Paid 06/09/2021
$3,157.50
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Passed 7/19/2021 7/19/2021 07/19/2021
In-wall Inspection Failed 7/20/2021 7/20/2021 07/20/2021
Misc
Corrective Action Required
07/20/2021
--7/20/21 - PARTIAL INSPECTION IN WALL PLUMBING ONLY -SECURE VERTICAL DWV 2" OR LESS AT MID POINT -BOCCA PROTECTION PLATES REQ AT TOP AND BOTTOM PLATE DWV, PROTECTION REQ FOR PLATE AND 2" ABOVE OR BELOW
Above Ceiling Inspection Partial 7/23/2021 7/23/2021 07/23/2021
Misc
Corrective Action Required
07/23/2021
7/23/21 - PARTIAL INSPECTION FOR PLUMBING ABOVE CEILING, OK AS CONSTRUCTED AT TIME OF INSPECTION
Gas Service Inspection - Commercial Passed 7/23/2021 7/23/2021 07/23/2021
In-wall Inspection Partial 7/23/2021 7/23/2021 07/23/2021
Misc
Informational
07/23/2021
7/23/21 - PARTIAL INSPECTION OF PLUMBING IN WALL, OK AS CONSTRUCTED AT TIME OF INSPECTION
In-wall Inspection Passed 7/29/2021 07/29/2021
Hood/Duct Inspection Partial 8/19/2021 8/19/2021 08/19/2021
Misc
Informational
08/19/2021
INSTALLATION OF HOOD DUCT OK, OK TO INSTALL WRAP
Hood/Duct Inspection Passed 8/20/2021 8/20/2021 08/20/2021
Misc
Informational
08/19/2021
Above Ceiling Inspection Partial 8/20/2021 8/20/2021 08/20/2021
Misc
Informational
08/20/2021
AREAS APPROVED - CUSTOMER AREA, PRODUCTION AREA, DRIVERS AREA, WALKIN, DRY STORAGE STOPPING BEFORE MGRS CUBBY
Above Ceiling Inspection Passed 8/25/2021 8/25/2021 08/25/2021
Misc
Resolved
08/25/2021
Underground Plumbing Inspection - Commercial Passed 7/19/2021 08/27/2021
Occupancy Inspection - Codes Commercial Failed 8/27/2021 8/27/2021 08/27/2021
Misc
Corrective Action Required
08/27/2021
-GFCI PROTECT OUTLET BELOW REAR SINK -PERMANENTLY LABEL SERVICE PANELS AND LABEL ALL BREAKER LOCATIONS -GFCI PROTECT WASHER CIRCUIT -HAMMER ARRESTORS AT LAUNDRY SPIGOTS -LEVER STYLE LOCK AT REAR DOOR -PENDING FIRE APPROVAL ON CORRECTIONS -PENDING HEALTH DEPT APPROVAL
Occupancy Inspection - Fire Failed 8/27/2021 8/27/2021 08/27/2021
Occupancy Inspection - Fire Passed 8/30/2021 08/30/2021
Occupancy Inspection - Codes Commercial Temporary C of O 8/31/2021 8/31/2021 08/30/2021
Misc
Corrective Action Required
08/27/2021
-GFCI PROTECT OUTLET BELOW REAR SINK -PERMANENTLY LABEL SERVICE PANELS AND LABEL ALL BREAKER LOCATIONS -GFCI PROTECT WASHER CIRCUIT -HAMMER ARRESTORS AT LAUNDRY SPIGOTS -LEVER STYLE LOCK AT REAR DOOR
Gas Piping Inspection - Commercial Passed 08/31/2021
Occupancy Inspection - Codes Commercial Full C of O 8/31/2021 8/31/2021 08/31/2021
Misc
Resolved
08/31/2021
Documents & Images
Date Uploaded File Type Document Name
04/28/2021 Application Form App & LT
04/28/2021 Plans 5401_#1684_04272021_Issued for Permit
04/28/2021 Email RE LT question
04/28/2021 Letter Fire Building Plan Review
04/29/2021 Letter DS P/R Corrections Document
05/05/2021 Letter Fire Building Plan Review
05/05/2021 Letter Lee's Summit Response to CITY Comments_050421
05/05/2021 Drawing 5401_#1684_05042021_Issued for Permit_Revision 1-FLS1.0 FIRE LIFE SAFETY...
05/05/2021 Drawing 5401_#1684_05042021_Issued for Permit_Revision 1-G1.0 COVER
05/17/2021 Email New Food Establishment Plan Review - Approved FTG 0001760
06/09/2021 Receipt Receipt for transaction: 2021-004189
07/16/2021 Plans DOMINOS AHU Units 2021-07-09
07/16/2021 DOMINOS AHU Units 2021-07-09
07/16/2021 Approved Plans approved - 5401_#1684_07152021_Issued for Permit_Revision 2 (1)0
07/16/2021 Receipt Receipt for transaction:2021-005715
07/19/2021 Letter DS Building Permit
07/19/2021 Letter INSPECTION SUMMARY
07/20/2021 Letter INSPECTION SUMMARY
07/23/2021 Letter INSPECTION SUMMARY
07/23/2021 Letter INSPECTION SUMMARY
07/23/2021 Letter INSPECTION SUMMARY
07/29/2021 Letter INSPECTION SUMMARY
08/19/2021 Letter INSPECTION SUMMARY
08/20/2021 Letter INSPECTION SUMMARY
08/20/2021 Letter INSPECTION SUMMARY
08/25/2021 Letter INSPECTION SUMMARY
08/27/2021 Letter INSPECTION SUMMARY
08/27/2021 Letter INSPECTION SUMMARY
08/27/2021 Letter Fire Loss Reduction Form
08/30/2021 Letter Fire Loss Reduction Form
08/30/2021 Letter Codes Temporary Certificate of Occupancy
08/31/2021 Certificate/License HEALTH INSPECTION
08/31/2021 Letter INSPECTION SUMMARY
08/31/2021 Letter Field Certificate of Occupancy
08/31/2021 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home