Permit Application Status

PRCOM20210469


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20210469
Building Permit - Commercial
Certificate of Occupancy
SAINT LUKES EAST HOSPITAL
ALTERATION COMMERCIAL
INTERIOR ALTERATION TO EXISTING MEDICAL CLINIC - MODIFYING WAITING AND RECEPTION AREAS
02/02/2021
07/07/2021
09/10/2021
Locations
Contacts
DAVID E ROSS CONSTRUCTION CO, Address:10201 E 75TH ST, Phone:(816) 737-2953  
P1 CONSTRUCTION LLC, Address:13605 W 96TH TERR, Phone:(913) 529-5000  
CAPITAL ELECTRIC CONSTRUCTION INC, Address:PO BOX 410079, Phone:(913) 335-1214  
GUY GRONBERG ARCHITECTS, Address:113 SE 3RD ST, Phone:(816) 524-0878  
SAINT LUKES EAST HOSPITAL, Address:901 E 104TH ST MAILSTOP 900N  
amcclain@derosscontruction.com, Address:amcclain@derosscontruction.com  
Reviews
Review Type Outcome Est. Completion Date Completed
Sprinkler Plan Review Released for Construction 07/22/2021 07/22/2021
Michael Weissenbach
Licensed Contractors Approved 02/12/2021 07/06/2021
Joe Frogge
LC - MEP Subs
Resolved
07/06/2021

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
LC - General Contractor
Resolved
02/09/2021

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor and an email address for the on-site contact.
Building Plan Review Approved 02/12/2021 02/08/2021
Joe Frogge
Fire Plan Review Approved with Conditions 02/12/2021 02/03/2021
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
02/03/2021

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Informational Purposes) Any modifications to the fire alarm system, provide electronic PE stamped shop drawings to mike.weissenbach@cityofls.net
Construction documents - Fire protection systems
Corrective Action Required
02/03/2021

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Informational Purposes) Any modifications to the fire sprinkler system, provide electronic PE stamped shop drawings to mike.weissenbach@cityofls.net
Installation acceptance testing
Corrective Action Required
02/03/2021

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Alteration to Commercial $516.00 $516.00 Paid 07/07/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Partial 8/3/2021 8/3/2021 08/03/2021
Misc
Informational
08/03/2021
: THE FOLLOWING AREAS ARE APPROVED : - PHASE 1 RECEPTION AREA 3D101 -
Above Ceiling Inspection Partial 8/10/2021 8/10/2021 08/10/2021
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
08/10/2021
- PHASE 1 RECEPTION AREA 3D101 -
In-wall Inspection Partial 8/30/2021 8/30/2021 08/30/2021
Misc
Informational
08/03/2021
: THE FOLLOWING AREAS ARE APPROVED : - PHASE 1 RECEPTION AREA 3D101 - - PHASE 2 RECEPTION, LINEN ROOM -
Above Ceiling Inspection Passed 9/8/2021 09/08/2021
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
08/10/2021
- PHASE 1 RECEPTION AREA 3D101 - - PHASE 2 RECEPTION, LINEN ROOM -
In-wall Inspection Passed 9/8/2021 09/08/2021
Misc
Informational
08/30/2021
: THE FOLLOWING AREAS ARE APPROVED : - PHASE 1 RECEPTION AREA 3D101 - - PHASE 2 RECEPTION, LINEN ROOM -
Occupancy Inspection - Codes Commercial Full C of O 9/10/2021 9/10/2021 09/10/2021
Documents & Images
Date Uploaded File Type Document Name
02/02/2021 Application Form Permit Application
02/02/2021 Plans RW20-Full-Set_02-02-2021
02/02/2021 Letter License Tax Not Applicable
02/03/2021 Letter Fire Building Plan Review
02/08/2021 Approved Plans approved - RW20-Full-Set_02-02-2021
07/02/2021 Application Form Excise Tax Application
07/07/2021 Receipt Receipt for transaction:2021-005423
07/07/2021 Letter DS Building Permit
07/22/2021 Letter Fire (Sprinkler) Plan Review
08/03/2021 Letter INSPECTION SUMMARY
08/10/2021 Letter INSPECTION SUMMARY
08/30/2021 Letter INSPECTION SUMMARY
09/08/2021 Letter INSPECTION SUMMARY
09/08/2021 Letter INSPECTION SUMMARY
09/10/2021 Letter Field Certificate of Occupancy
09/10/2021 Letter Codes Final Certificate of Occupancy
09/10/2021 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home